Plant capacity
14 MT per day
Total project cost
₹887 lakh
Plant and machinery
₹446 lakh
Return on investment
26% (Year 3)
Break-even
40% of capacity
Payback period
About 3.2 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a silico manganese project report?

A silico manganese project report is a detailed project report (DPR) for a smelter that reduces manganese ore and ferro manganese slag with coke in a submerged arc furnace. It sets out the charge mix, power use, furnace and machinery, approvals, project cost, five-year projections, DSCR and break-even that lenders and investors check.

Steel plant groups, ferro alloy producers and new promoters use it to size a furnace and raise a term loan; banks use it to test whether the plant can carry its power bill and repay.

Also known as: silicomanganese plant project report, project report on silico manganese, silico manganese business plan, SiMn plant DPR, ferro silico manganese project report.

Silico manganese manufacturing plant cost in India

Our sample report models a 14 MT per day plant running 330 days a year, which is 4,620 MT per year. It starts at 60% of capacity, reaches 80% in Year 5 and sells at ₹75,400 per MT.

Larger furnaces cost far more. A 2022 pre-feasibility report put a 5 MVA ferro alloy plant in Chandrapur, rated for 10,000 tonnes a year of silico manganese, at ₹1,575 lakh. MOIL's 18 MVA plant near Nagpur, for 25,000 tonnes a year, was costed at ₹136.44 crore.

₹887 lakhTotal project cost
₹2,438 lakhSales in Year 3
₹230 lakhNet profit in Year 3
2.02Average DSCR
Cost of project (₹ lakh)
Land and site development50.43
Building and civil works196.11
Plant and machinery445.91
Other fixed assets56.72
Contingencies32.10
Preliminary and pre-operative19.53
Working capital margin85.72
Total886.52
Means of finance (₹ lakh)
Promoter's contribution (25%)221.63
Term loan from bank (75%)664.89
Cash credit limit (separate)257.16
Total project cost886.52

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments. Sample figures are illustrative; the 5 MVA and 18 MVA costs are from public filings of 2022.

Silico manganese manufacturing process

Silico manganese is made by carbothermic reduction in a three-electrode submerged arc furnace. The furnace runs round the clock; it is tapped at intervals, not batch by batch.

  1. Charge preparation

    Manganese ore, ferro manganese slag, coke, coal, quartz and dolomite are screened to size, as fines choke the burden and raise power use.

  2. Weighing and charging

    A batching system weighs each material to the charge recipe and feeds it through chutes around the electrodes.

  3. Smelting

    Electric energy keeps the bath at about 1,600–1,650 °C, where carbon reduces manganese oxide and silica together into the alloy.

  4. Tapping

    Metal and slag are tapped together through the taphole into ladles at fixed intervals.

  5. Slag separation and casting

    The lighter slag floats off and goes to the slag yard; the metal is cast in beds or moulds and left to solidify.

  6. Crushing and grading

    Cooled cakes are broken and screened to the lump size each steel plant specifies.

  7. Analysis and dispatch

    Each tap is sampled for manganese, silicon, carbon and phosphorus, then packed in jumbo bags by grade.

Which grade and furnace size should you plan for?

Most new units make the standard high carbon grade, which needs the least power per tonne. Medium and low carbon grades sell at a premium but need more silicon and more refining.

Standard gradeAbout 60–70% manganese, 16–28% silicon and 1.5–2.5% carbon, the composition the Indian Bureau of Mines gives for silicomanganese
Medium carbon gradeExample listed for an Indian plant: 54–56% manganese, 22–25% silicon, 0.2–0.5% carbon
Low carbon gradeExample listed for an Indian plant: 53–55% manganese, 25–28% silicon, 0.15–0.2% carbon
Furnace sizeSmall units use a single furnace of about 5 MVA; larger plants run 9 MVA to 18 MVA or more for lower cost per tonne
ElectrodesSelf-baking Soderberg electrodes, fed with electrode paste as they are consumed
Product standardIS 1470:2025, Silicomanganese specification, issued by the Bureau of Indian Standards

Grade compositions are from the Indian Minerals Yearbook 2020 (IBM). Your buyers' specifications decide the grade.

Raw materials and charge mix for silico manganese

Manganese ore is the biggest single cost in the sample, ahead of smelting power. Units blend high grade ore with cheaper slag from ferro manganese furnaces, which still holds manganese. Per tonne of alloy, a 2022 filing for a 5 MVA plant used 1.06 tonnes of this slag, 0.27 tonnes of coke, 0.47 tonnes of coal and 0.24 tonnes of dolomite.

Raw materials and smelting power in our sample report, Year 3
InputShare of costYear 3 (₹ lakh)
Manganese ore40%569.33
Power34%483.93
Coke and coal14%199.26
Electrode paste5%71.17
High carbon ferro manganese slag4%56.93
Dolomite and quartz3%42.70
Total100%1,423.32

The sample counts smelting power as a raw material because it is consumed per tonne of alloy. Other power and fuel is shown under utilities.

Machinery for a silico manganese plant

The furnace and its transformer take more than half the machinery budget in the sample. Pollution control is not optional here: fume extraction with bag filters is a standard condition of consent.

EquipmentWhat it doesSample cost (₹ lakh)
Submerged arc furnace with Soderberg electrodesSmelts the charge into alloy and slag160.53
Furnace transformer and HT switchyardSteps down grid power for the electrodes89.18
Fume extraction and bag filter systemCaptures furnace fume and dust53.51
Raw material handling and batching systemScreens, weighs and feeds the charge44.59
Ladles, casting beds and EOT craneHandle molten metal and cast it44.59
Alloy crushing and screening plantSizes the alloy to buyer specification26.76
Cooling water systemCools the furnace shell, electrodes and transformer26.75
Total plant and machinery445.91

Costs are the sample report's estimates for a 14 MT per day plant. Get current quotations before you finalise.

Power, water and slag: what a smelter really runs on

Power decides whether a silico manganese plant makes money. Most of the site plan, from the HT line to the slag yard, follows from the furnace rating.

Specific powerAbout 4,000–5,250 kWh per tonne of alloy (4,000 kWh in a 2022 filing for a 5 MVA plant; 4,750–5,250 kWh per the Indian Bureau of Mines)
Power supplyDedicated HT feed: 33 kV for the 5 MVA plant in Chandrapur, a 132 kV line for MOIL's 18 MVA plant
WaterClosed-loop cooling with small make-up: 30 KLD for the 5 MVA plant, 35 KLD for the 18 MVA plant, both designed for zero discharge
SlagRoughly one tonne per tonne of alloy at the 5 MVA plant; metal is recovered by jigging and the rest sold for road and construction fill
Bag filter dustAbout 500 tonnes a year at the 5 MVA plant, agglomerated and returned to the furnace
Power cost in the sample₹483.93 lakh of smelting power plus ₹195.34 lakh of other power and fuel in Year 3

Check the tariff first: at 4,000 kWh or more per tonne, every rupee per unit on your power tariff adds ₹4,000 or more to the cost of each tonne. Get the HT tariff and any industrial concessions in writing before sizing the furnace.

Licences and approvals for a silico manganese plant

Environmental clearanceRequired under item 3(a), metallurgical industries, of the EIA Notification; the 5 MVA and 18 MVA plants reviewed for this page were both appraised as Category A
Pollution board consentConsent to establish and operate from the State Pollution Control Board, with stack limits and, for larger plants, continuous emission monitoring
BIS certificationThe BIS standards portal lists silicomanganese (IS 1470) under mandatory certification through a Quality Control Order implemented on 8 November 2024; IS 1470 was revised in 2025, so confirm the licence scope with BIS
PowerHT connection and sanctioned contract demand from the state utility for the furnace load
Factory licenceUnder the Factories Act, with approval of the plant layout and furnace area safety measures; rules vary by state
Business registrationUdyam (MSME) registration and GST registration

Checked on official portals in October 2026. Rules change; confirm with the state authorities before applying.

Who buys silico manganese in India?

Almost every tonne goes into steel. Steel makers add it to each heat to remove oxygen and lift manganese and silicon. The Indian Bureau of Mines notes it is preferred over high carbon ferro manganese as a deoxidiser. Demand therefore moves with steel output, especially long products such as TMT bars.

Production is spread across Chhattisgarh, Odisha, Jharkhand, West Bengal, Karnataka, Maharashtra, Meghalaya and Andhra Pradesh, close to ore mines and power.

  • Induction furnace and TMT bar makers
  • Integrated steel plants, through annual tenders
  • Electric arc furnace steel plants
  • Ferro alloy traders and stockists
  • Export buyers

Where a new plant wins: buyers judge a smelter on consistent analysis tap after tap. A unit that holds manganese, silicon and phosphorus within a narrow band gets repeat orders even against larger plants.

Mistakes that weaken a silico manganese project report

  • Using an average power tariff

    The project lives on its HT tariff, demand charges and any concessions. A generic rate per unit misstates the largest cost you can negotiate, so the DSCR looks better than it is.

  • Assuming one ore grade all year

    Ore manganese content and the manganese to iron ratio change from lot to lot. The report should show the charge mix and recovery the plant can hold.

  • Leaving slag out of the numbers

    About a tonne of slag comes out with every tonne of alloy. Handling, metal recovery and sale or disposal all belong in the cost sheet.

  • Ignoring the clearance timeline

    Environmental clearance and the HT line can take longer than civil work. Interest during construction must cover that wait.

  • Underestimating working capital

    Ore is bought in bulk lots and steel mills pay on credit. Our sample carries 30 days of raw material stock and 45 days of receivables.

How NPCS helps you set up a silico manganese plant

  • Furnace size and gradeMatch MVA rating, grade and output to your power, ore access and buyers.
  • Charge mix and cost sheetBuild cost per tonne from ore, slag, reductants and your actual tariff.
  • Bank-ready project reportProjections, DSCR, sensitivity to power and ore prices, and working capital.
  • Clearances and layoutPlant layout, slag yard, pollution control and the approvals list for your state.

NPCS's client list shows 116 assignments in metal products, including a recent report on electrolytic manganese metal. The NPCS project team, led by founder Ajay Kumar Gupta, has prepared project reports since 1994.

What's inside the silico manganese sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

19 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Real NPCS silico manganese project reports

These are silico manganese project reports NPCS has prepared, with the plant capacity, total capital investment, rate of return and break-even worked out in each. Costs have moved since some were written, so we bring any of them up to date for your capacity and location.

Project reportPlant capacityTotal investmentRate of returnBreak-evenAction
Ferro Alloys-Ferro Manganese, Silico Manganese, Ferro Silicon Based ON Aluminothermic Process12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day₹2.42 crore36%79% Get this report
Ferro Alloys – Ferro Manganese, Silico Manganese, Ferro Silicon Based ON Aluminothermic Process1800 MT/Annum Ferro Manganese, 900 MT/Annum Silico Manganese, 900 MT/Annum Ferro Silicon₹2.83 crore40%74% Get this report
Silico Manganese14400 MT/Annum₹18.61 crore40%70% Get this report
Ferro Alloys (Ferro Silicon, Ferro Manganese & Silico Manganese)Ferro Silicon:59.0 MT/Day.,Ferro Manganese:167.0 MT/Day.,Silico Manganese:130.5 MT/Day.₹42.8 crore28%41% Get this report
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese ProductionFerro Silicon (70-75% SI): 6,500 MT Per Annum, High Carbon Ferro Manganese (70-72% Mn): 22,000 MT Per Annum, Silico Manganese (Mn 70% and Si…₹246.27 crore27%54% Get this report

Figures as worked out in each NPCS report. Total investment includes plant and machinery, land and building, and working capital.

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Silico Manganese project report: frequently asked questions

What is the cost of a silico manganese plant in India?

It depends mainly on furnace size. Our sample report models a 14 MT per day unit at ₹886.52 lakh. Public environmental filings show a 5 MVA ferro alloy plant costed at ₹1,575 lakh in 2022 and an 18 MVA, 25,000 tonnes per year plant at ₹136.44 crore. Land, power line length and pollution control change the figure most.

How much power is needed to make one tonne of silico manganese?

Plan for roughly 4,000 to 5,250 kWh of electricity per tonne. A 2022 pre-feasibility report for a 5 MVA plant used 4,000 kWh per tonne, while the Indian Bureau of Mines gives 4,750 to 5,250 kWh. Higher silicon grades, more slag and poor charge preparation all push consumption up.

What raw materials are used to make silico manganese?

Manganese ore, high carbon ferro manganese slag, coke and coal as reductants, quartz for silicon, and dolomite as flux, with electrode paste for the Soderberg electrodes. One 2022 filing used 1.68 tonnes of ore and slag, 1.06 tonnes of ferro manganese slag, 0.27 tonnes of coke and 0.47 tonnes of coal per tonne of alloy.

Is a silico manganese plant profitable?

It can be, if power is cheap and ore buying is disciplined. In our illustrative sample, a 14 MT per day plant earns a 26% return on investment in Year 3. It breaks even at about 40% of capacity and pays back in about 3.2 years. A rise in the power tariff or ore price hits margins fastest, so test both.

Does a silico manganese plant need environmental clearance?

Yes, in most cases. Silico manganese smelters are appraised under item 3(a), metallurgical industries, of the EIA Notification. Both filings checked for this page, a 5 MVA plant in Chandrapur and an 18 MVA plant near Nagpur, were treated as Category A. That means appraisal by the Ministry of Environment, Forest and Climate Change.

What is the difference between silico manganese and ferro manganese?

Silico manganese carries both manganese and silicon, typically 60 to 70% manganese and 16 to 28% silicon, while high carbon ferro manganese has little silicon. Steel makers prefer silico manganese as a deoxidiser because one addition supplies both elements. Silico manganese plants also use slag from ferro manganese furnaces as a feed.

Is the silico manganese project report PDF free, and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report. Its figures are representative, not from a real project, so do not submit it to a bank. For a loan, NPCS prepares a report for your own furnace size, location and power tariff.

Sources and references

  1. Indian Minerals Yearbook 2020, Ferro-Alloys (advance release)Indian Bureau of Mines, Ministry of Mines, checked Oct 2026
  2. IS 1470:2025 Silicomanganese, Specification (Fifth Revision)Bureau of Indian Standards, checked Oct 2026
  3. IS 1470:2013 Silicomanganese, standard details and QCO statusBureau of Indian Standards, checked Oct 2026
  4. Pre-feasibility report, 1 x 5 MVA ferro alloy plant, MIDC ChandrapurMinistry of Environment, Forest and Climate Change (Parivesh), checked Oct 2026
  5. Executive summary of EIA, MOIL silico manganese plant, NagpurMaharashtra Pollution Control Board, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different metal products project?

These are a few of the projects we advise on. NPCS's published client list records 116 metal products assignments, so tell us what you are planning.

Tell us your project

Recent metal products assignments

  • Long Island Trading Co. Pvt. Ltd
    Project Report on Aluminium Can Manufacturing Plant SetupIndore, 2026
  • Allotrope Engineers
    Bankable Project Report on Gas Atomized Aluminium PowderHyderabad, 2026
  • P M Infrastructure Private Limited
    Comprehensive Market Research Report on TMT BarsBangalore, 2026
  • Arham Recycling Private Limited
    Pre-Feasibility Report on Copper Wire RecyclingFaridabad, 2026
  • Bihar Foundry & Castings Limited
    Industrial Project Report on Electrolytic Manganese MetalRanchi, 2026
  • Rgcon Itm
    Comprehensive Project Report on Copper CathodeVisakhapatnam, 2026
  • Krishnay Recycling Pvt Ltd
    Pre-Feasibility Report on Project Planning and Feasibility Report on Copper Cathode and CoSouth Africa, 2026
  • Goodluck India Ltd
    Techno-Economic Project Report on Inner Grooved Copper TubesSikandrabad, 2025

Get a silico manganese project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Silico Manganese Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free silico manganese sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Silico Manganese sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp