What is a investment casting project report?
An investment casting project report is a detailed project report (DPR) for a foundry that makes steel parts by the lost wax process: wax patterns are coated in a ceramic shell, the wax is melted out and molten metal is poured into the cavity. It sets out the process, machinery, raw materials, project cost, finance, five-year projections, DSCR and break-even.
Foundry promoters and engineering firms use it to size the plant and raise a term loan; banks use it to judge whether the foundry can repay.
Also known as: lost wax casting, precision casting, lost-wax process.
Investment casting plant cost in India: the sample economics
Our sample report models a foundry pouring 1,800 kg of finished castings a day for 330 days a year. It starts at 60% of capacity and reaches 80% in Year 5, selling at an average of ₹317 per kg.
The figure to watch is cost per kg. In the sample, castings cost about ₹245 per kg to make against a price of ₹317, so every point of rejection or yield loss comes straight out of that gap.
| Land and site development | 83.29 |
|---|---|
| Building and civil works | 218.43 |
| Plant and machinery | 454.41 |
| Other fixed assets | 61.30 |
| Contingencies | 33.64 |
| Preliminary and pre-operative | 21.28 |
| Working capital margin | 44.04 |
| Total | 916.39 |
| Promoter's contribution (25%) | 229.10 |
|---|---|
| Term loan from bank (75%) | 687.29 |
| Cash credit limit (separate) | 132.10 |
| Total project cost | 916.39 |
Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments; minimum DSCR 1.71. All figures are illustrative.
Investment casting manufacturing process, step by step
A lost wax foundry runs two lines side by side: a wax and shell room that makes the moulds, and a melt shop that fills them. Shell building takes the longest, because each coat must dry before the next one goes on.
- Wax pattern injection
Hydraulic presses inject pattern wax into aluminium dies to make an exact copy of the part, slightly oversize to allow for metal shrinkage.
- Tree assembly
Patterns are welded with a hot knife onto a wax runner through short gates, so one pour can fill dozens of small parts.
- Shell building
The tree is dipped in ceramic slurry, sprinkled with refractory sand and dried, and the cycle is repeated until the shell is strong enough to hold molten steel.
- Dewaxing
A steam autoclave melts the wax out in minutes without cracking the shell, and the recovered wax is cleaned for reuse in runners.
- Shell firing and pouring
Shells are fired in a furnace to burn off wax residue and are poured while still hot, with steel from a medium frequency induction furnace.
- Knockout and cut-off
Once cool, the shell is broken off with a hammer or vibrator and each casting is cut from the runner with an abrasive cut-off machine.
- Fettling and heat treatment
Gate stubs are ground flush, castings are shot blasted, and they are annealed, normalised or hardened as the grade requires.
- Inspection and dispatch
Chemistry is checked on a spectrometer, dimensions against the drawing, and critical parts by dye penetrant or radiography before packing.
Silica sol or water glass: choosing the shell route
The shell binder decides surface finish, which alloys you can sell and how much the shell costs per kg of castings. Many Indian foundries run both lines and route each order to the one that suits it.
| Point of comparison | Silica sol (colloidal silica) | Water glass (sodium silicate) |
|---|---|---|
| Prime coat | Zircon flour slurry | Silica or zircon flour in sodium silicate |
| How each coat sets | Air dried in a humidity-controlled room | Hardened chemically in an ammonium chloride bath |
| Surface finish | Smoother, finer detail | Rougher, more machining needed |
| Shell cost and cycle | Higher material cost, slower drying | Lower material cost, faster cycle |
| Usual work | Stainless steel, pump and valve trim, export orders | Carbon and low alloy steel, larger general parts |
What our sample assumes: a silica sol line with zircon prime coats, because stainless and alloy steel castings for valve, pump and export buyers need the finer finish.
Raw materials for lost wax casting
Metal is most of the bill, but shell materials are what new foundries under-budget. In our sample, raw materials cost ₹585.11 lakh in Year 3, about 44.4% of sales, and zircon, binder and stucco together make up 21% of that.
| Raw material | Share of cost | Year 3 (₹ lakh) |
|---|---|---|
| Stainless and alloy steel scrap and billets | 62% | 362.77 |
| Ferro alloys and nickel | 12% | 70.21 |
| Zircon flour and zircon sand | 8% | 46.81 |
| Fused silica and aluminosilicate stucco | 7% | 40.96 |
| Colloidal silica binder | 6% | 35.11 |
| Pattern wax | 5% | 29.25 |
| Total | 100% | 585.11 |
Nickel and stainless scrap prices move with world metal markets, so the report should test a price rise on margin and DSCR.
Machinery for an investment casting foundry
The induction furnace is the largest single item at ₹99.97 lakh, followed by the slurry and shell drying system. Together the wax room and shell room cost more than the melt shop.
| Machine | What it does | Sample cost (₹ lakh) |
|---|---|---|
| Medium frequency induction melting furnace | Melts scrap and alloys to grade | 99.97 |
| Slurry tanks, rainfall sanders and shell drying | Builds and dries the ceramic shell | 63.62 |
| Hydraulic wax injection presses | Makes wax patterns in dies | 54.53 |
| Spectrometer and testing laboratory | Proves chemistry and properties | 49.98 |
| Knockout, cut-off and fettling equipment | Frees and cleans castings | 45.44 |
| Steam autoclave for dewaxing | Melts wax out of shells | 40.90 |
| Shell preheating and firing furnace | Fires shells before pouring | 40.90 |
| Heat treatment furnace | Anneals or hardens castings | 36.35 |
| Shot blasting machine | Cleans the casting surface | 22.72 |
| Total plant and machinery | 454.41 | |
Costs are the sample report's estimates. Wax dies are usually paid for by the buyer or charged as tooling, and are not in this list.
Power, manpower and working capital
Investment casting is labour and power hungry for its tonnage, because every part is handled many times between wax and dispatch.
| Power and fuel | ₹100.50 lakh in Year 3, about 7.6% of sales; the induction furnace and shell firing furnace draw most of it |
|---|---|
| Manpower | 40 people: 6 in management and supervision, 14 skilled operators and 20 semi-skilled workers; Year 1 wage bill ₹85.92 lakh |
| Land and building | Land ₹83.29 lakh and buildings ₹218.43 lakh, with separate wax, shell, melting and fettling bays |
| Working capital | ₹176.14 lakh in Year 1, of which ₹132.10 lakh is the bank's cash credit limit |
| Biggest current asset | Trade receivables at ₹139.29 lakh in Year 1, from 45 days of credit to OEM buyers |
Licences and approvals for a lost wax foundry
| Pollution board consent | Consent to establish and to operate from the State Pollution Control Board. Foundry operations appear in the Orange category of state lists based on CPCB criteria (Odisha list, checked October 2026); confirm the category in your own state. |
|---|---|
| Air pollution control | Fume extraction over the induction furnace and dust collection at shot blasting and fettling, as set in the consent conditions |
| Factory licence | Registration under the Factories Act or the applicable state labour code, given the workforce and power load |
| Product standard | Castings are made to the buyer's drawing and grade, for example IS 1030 for carbon steel castings for general engineering purposes |
| Quality system | ISO 9001 certification, which most OEM and export buyers ask for before approving a new foundry |
| Business registration | Udyam (MSME) and GST registration, plus an Importer Exporter Code if you plan to export |
Who buys investment castings, and how a new foundry wins orders
Investment castings are never sold off the shelf. Each order is made to one buyer's drawing. Your market is the engineering companies that need complex steel parts close to final shape and will approve your samples.
Gujarat, Maharashtra and Tamil Nadu have the main foundry clusters, with Rajkot, Pune and Coimbatore as known centres. A unit inside a cluster gets shell materials, heat treatment and testing nearby; a unit outside one can win local OEMs on delivery time.
- Valve and pump manufacturers
- Automobile and tractor component makers
- Food, dairy and pharma equipment makers
- Defence and power equipment suppliers
- Export buyers in Europe and the US
- General engineering OEMs
The first year is about approvals: OEMs order trial lots before releasing regular schedules, so budget for slow early utilisation and keep spectrometer and dimensional reports ready for every sample.
Mistakes that weaken an investment casting project report
- Counting poured metal as sales
Runners and gates can weigh as much as the parts. Sales must be on finished casting weight, with runner metal shown as remelt.
- Ignoring rejection rates
Shell cracks, shrinkage and inclusions scrap a share of every pour. A report with zero rejection overstates output and DSCR.
- Pricing stainless and carbon steel alike
Grades differ widely in metal cost and price per kg. The product mix must match the alloys you will actually pour.
- Skipping shell room climate control
Silica sol shells need steady temperature and humidity to dry. Leaving out air handling causes cracked shells in summer and monsoon.
- Short working capital for OEM credit
Engineering buyers pay late and order in small lots. Receivables are the largest current asset, so the cash credit limit must cover them.
How NPCS helps you plan an investment casting plant
- Capacity and alloy mixSize the plant around the grades and part weights your target buyers order.
- Shell route and machineryCompare silica sol and water glass lines, furnace sizes and supplier quotations.
- Bank-ready project reportProjections with realistic yield, rejection and receivable days, in your lender's format.
- Layout and approvalsBay layout from wax room to fettling, power load and the consent list for your state.
NPCS's client list records 116 assignments in metal products. The NPCS project team has prepared project reports since 1994, under the leadership of founder Ajay Kumar Gupta.
What's inside the investment casting sample report
- Introduction
- Uses and applications
- Market potential
- Manufacturing process
- Raw materials
- Plant and machinery
- Land, building and utilities
- Manpower
- Licences and approvals
- Project cost and means of finance
- Working capital
- Projected profitability
- Cash flow statement
- Projected balance sheet
- Depreciation
- Term loan repayment
- Debt service coverage
- Break-even analysis
- Financial ratios
- Key assumptions
- Conclusion
- Monthly loan repayment schedule
19 pages, five-year projections, illustrative figures.
Open sample reportFree sample or a report for your project?
| What you get | Free sample | NPCS report for your project |
|---|---|---|
| Capacity and location | Typical unit | Your capacity, site and state |
| Figures | Illustrative | Built on current prices and quotations |
| Machinery suppliers and quotations | No | Yes |
| Market survey for your region | No | Yes |
| Bank or scheme format (PMEGP, term loan) | No | Yes |
| Use for a loan application | No | Yes |
Find NPCS project reports in your budget
What clients say about NPCS
4.7
264 Google reviews, as of 20 Oct 2026
Clients most often mention
- feasibility reports 18
- project report 16
- helpful for startups 15
- detailed reports 8
-
Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.
Piyush Singh, Google review, 2026
-
Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended
Saroj Yadav, Google review, 2026 View on Google
-
In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.
Shrishti Gautam, Google review, 2026
-
NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.
Raj Yadav, Google review, 2026
Investment Casting project report: frequently asked questions
How much does it cost to set up an investment casting plant in India?
A small foundry casting about 300–600 kg per day needs roughly ₹2–4 crore, while a 4,000–6,000 kg per day plant can need ₹18–30 crore. These ranges are indicative. Our sample report models a 1,800 kg per day plant at ₹916 lakh, including land, building, machinery and working capital margin. Your report costs the plant for your alloys, capacity and location.
Why is investment casting called lost wax casting?
Because the wax pattern is lost during the process. Each part is first made in wax, coated in layers of ceramic to form a shell, and then the wax is melted out in an autoclave. Molten metal fills the hollow shell, so every casting needs a fresh wax pattern and a fresh shell.
What is the difference between investment casting and sand casting?
Investment casting gives a smoother surface, finer detail and thinner walls than sand casting, so parts often need little machining. Sand casting has cheaper tooling, handles much heavier parts and copes better with frequent design changes. Foundries choose investment casting for small, complex steel parts such as valve, pump and automobile components.
Which metals can be cast by the lost wax process?
Most foundry alloys can be investment cast. Indian units mainly pour carbon steel, low alloy steel and stainless steel, and some also cast duplex stainless, nickel alloys, copper alloys and aluminium. Our sample plant is costed for stainless and alloy steel melted in a medium frequency induction furnace, with ferro alloys and nickel added to reach the grade.
Is an investment casting business profitable?
In our illustrative sample, a 1,800 kg per day plant earns a 24.5% return on investment in Year 3, breaks even at 34.2% of capacity and pays back in about 3.3 years. Real profit depends on rejection rates, alloy prices, shell material yield, power cost and how quickly you win repeat orders from OEM buyers.
Is the investment casting project report PDF free, and can I use it for a bank loan?
The sample PDF is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report; its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, alloys and location.
Sources and references
- Model project profile: Investment Casting (December 2002)Office of the Development Commissioner (MSME), Ministry of MSME, checked Oct 2026
- Categorization of industrial sectors under Orange category as per CPCB criteriaState Pollution Control Board, Odisha, checked Oct 2026
- IS 1030:1998 Carbon steel castings for general engineering purposesBureau of Indian Standards, checked Oct 2026