Best EV Charging Station Franchise
Contents 9 sections
  1. Which EV charging station franchise should you pick, and what does it cost?
  2. Is an EV charging station franchise profitable?
  3. Own it, run it, or hand it over: which franchise model suits you?
  4. Can you get a subsidy or a loan for an EV charging franchise?
  5. Do you need a licence, and which approvals come first?
  6. What are the steps from application to a live station?
  7. What should you ask before signing a franchise agreement?
  8. What to do next
  9. Frequently asked questions

To start an EV charging station franchise in India, you choose a franchisor, offer a site with enough electrical load, pay for the chargers and the power connection, and run the station yourself or let the franchisor run it. Selling charging needs no separate licence. The brand matters less than three things: how large a charger your site can power, how many vehicles stop each day, and how much of the headline price is only the charger, with the transformer, wiring and meter billed on top. Starting prices run from ₹9.99 lakh to ₹30 lakh and above, and franchisors' own payback estimates range from 1.7 to 5.6 years. Subsidy under PM E-DRIVE, the central electric mobility scheme, goes through government agencies, so a private franchisee should not budget for it.

Which EV charging station franchise should you pick, and what does it cost?

Each starting price covers different things. The table uses each company's franchise page as read in October 2026.

FranchisorStarting priceSpace and powerWhat to check
Bolt.Earth₹9.99 lakh before tax (₹15 lakh Essential, ₹50 lakh Gold)Site survey sets the loadExcludes load increase, transformer, wiring to the charger, flooring, EV meter, deposits
ChargeZone₹25 lakh fast charging; ₹1 crore super chargingAbout 550 sq ft, 50-150 kVA12-20 weeks to commission a fast site
ZEON₹20-24 lakh (120 kW starter)About 500 sq ft; no transformer for starterYou find the site; approved chargers only; 100% advance on charger orders
StatiqFrom ₹30 lakh2 to 20 parking baysProject cost includes hardware, civil work, grid costs and tax
Tata Power EZ ChargeNot publishedPartner secures the siteNo registration fee; partner follows brand pricing rules

Bolt.Earth's low price leaves grid work out, while Statiq's higher price includes it. The gap is large: the government's benchmark costs put grid-side work for a site up to 100 kW at ₹14.80 lakh, above the ₹11.68 lakh benchmark for the 100 kW charger itself. Ask every franchisor for one quote split into charger, civil work and grid connection.

Is an EV charging station franchise profitable?

Paybacks differ because assumptions differ. Each row is from the franchisor's own page or calculator.

FranchisorInvestmentAssumptions on its pageStated payback
Bolt.Earth Essential₹15 lakh plus GST25 vehicles a day, mixed two-, three- and four-wheelers; before revenue share; grid work excluded1.7 years
ChargeZone fast chargingFrom ₹25 lakhNot stated2-4 years
ZEON calculator₹1.35 crore (Growth plan)28 sessions a day, 26 kWh each, ₹21 per kWh revenue, ₹8.50 per kWh electricity5.6 years (headline says 3-4)
Statiq calculator₹39 lakh (120 kW)Electricity at ₹8 per kWhAbout 4-5 years

ZEON's inputs mean 728 kWh sold a day. What you earn per kWh is the service charge added to the electricity cost, and the Ministry of Power's 2024 guidelines cap it for DC fast charging at ₹11 per unit from 9 am to 4 pm and ₹13 at other hours, before GST and land cost, until 31 March 2028. Rent, staff, repairs and the franchisor's share all come out of that charge.

So ask the franchisor for the kWh per day behind its payback figure, and discard it if your site cannot draw that many vehicles. Competition is rising: the Ministry of Heavy Industries told the Lok Sabha on 21 July 2026 that 52,718 public stations operate, 16,561 with fast chargers for cars.

Own it, run it, or hand it over: which franchise model suits you?

In franchise-owned, franchise-operated, which is how Tata Power's partner model reads, you scout the site, run daily operations and follow the brand's pricing rules, while the company supplies hardware, software and maintenance. In franchise-owned, company-operated, sold by Bolt.Earth and Statiq, you own the chargers and the company runs, maintains and bills them, then pays your revenue share. Neither states the share online, so get it in writing.

Choose company-operated unless you can staff the site and get a faulty charger repaired within a day.

Can you get a subsidy or a loan for an EV charging franchise?

PM E-DRIVE sets aside ₹2,000 crore for public charging. Applicants are central ministries, central public sector companies, and states and Union Territories with their companies, applying through nodal agencies. Individuals are not listed. For malls, streets and highways the support is 80% of grid-side costs only, with no charger subsidy.

ChargeZone and ZEON both warn on their franchise pages that social-media offers of PM E-DRIVE subsidy to franchisees are false. If an agent promises one, ask for the sanction order. Tata Power's EV Mitra page and ChargeZone both tie franchises to State Bank of India (SBI) finance, but neither gives terms you can rely on, so ask the bank for rate, tenure and collateral in writing.

Do you need a licence, and which approvals come first?

No. The Ministry of Power's guidelines call setting up and running charging stations a de-licensed activity. You still need the approvals below. These are guideline ceilings, so plan with your franchisor's timeline.

ApprovalWho gives itLimit or condition
Power connectionPower distribution company (DISCOM)3 days in metros, 7 in other municipal areas, 15 rural, 30 hilly rural, 90 if a line must be extended; low-tension up to 150 kW
Charger test certificateNABL-accredited laboratoryValid type test certificate; BIS-compliant chargers
Electrical safety clearanceElectrical InspectorateBefore the station is energised
Fire clearanceFire departmentOnly if chargers go in a basement
Petroleum safety approvalPESOFor chargers at petrol pumps

What are the steps from application to a live station?

  1. Check your site: clear ownership or a lease free of disputes, road frontage and room for two bays.
  2. Apply and get a feasibility visit. Bolt.Earth books its survey within two weeks of sign-up.
  3. Get a written cost split into charger, civil work and grid, plus revenue-share terms.
  4. Apply for the power connection or a load increase.
  5. Install chargers, canopy, bay marking and CCTV, then obtain the safety clearance.
  6. Link the station to the franchisor's software and app, then go live and track kWh sold per day.

Equipment you will be paying for

EquipmentWhat it doesNote
DC fast charger (CCS-II)Charges cars at 50 kW and aboveBenchmark: ₹7.25 lakh at 50 kW, ₹11.68 lakh at 100 kW
Two- and three-wheeler chargerCharges small vehicles, up to 12 kWBolt.Earth packs a 3 kW unit in its entry tier
Transformer and panelBrings the sanctioned load to the siteOften billed separately
Charging management softwareBills drivers, monitors uptime, feeds the appTalks to chargers over OCPP, an open protocol

What should you ask before signing a franchise agreement?

  • Revenue share: the percentage, payout cycle and deductions before it.
  • Charger sourcing: ZEON drops its warranty if you buy approved brands directly. Check the same clause elsewhere.
  • Advance payment: ZEON asks 100% advance on charger orders. Ask for staged payment against delivery.
  • Pricing control: Tata Power partners follow its pricing rules. Know whether you can change tariffs.
  • Downtime: who repairs, within how many hours, and whether your share continues during an outage.
  • Site rights: what happens to the chargers if your lease ends.

What to do next

Shortlist two franchisors already running stations in your city, ask each for a site survey and a one-page cost split, and run the kWh arithmetic on both. Take the lower-risk offer to your bank with the survey, cost split and lease or title papers.

Compare the setup with a CNG station business. The EV spare parts business covers the service side, and electric bike assembling explains the two- and three-wheeler demand. More routes: franchise business ideas and EV and battery business ideas.

Frequently asked questions

Can I start an EV charging station without a franchise?

Yes. You buy certified chargers and charging software, arrange the power connection, and list the station on public charging apps. A franchise adds brand, app traffic and support; going alone saves fees but leaves you to build driver awareness.

How much area do I need?

ChargeZone's fast plan lists about 550 sq ft, enough for two car bays, and ZEON's 120 kW starter about 500 sq ft. Statiq's models run from 2 to 20 bays. More bays need more sanctioned load and usually a transformer.

Do I need to own the land?

No, but you need clear title or a lease free of disputes. ZEON asks for that and supplies no sites. Tata Power's partner secures the site, and Bolt.Earth lets landowners partner on rent or revenue share.

Can I put chargers at my petrol pump?

Yes. The Ministry of Power's guidelines require PESO approval for the power connection at petrol pumps. Agree placement and load with the franchisor first.

When will I start earning?

From go-live, but slowly. Bolt.Earth says use typically takes 6 to 12 months to ramp up, and Statiq warns returns may feel slow at first. Keep first-year working capital.

Not part of the page

5-minute review

#Sentence in the pageWhat to checkURL to check
1"...cap it for DC fast charging at ₹11 per unit from 9 am to 4 pm and ₹13 at other hours, before GST and land cost, until 31 March 2028."Service charge ceilings and the 31 March 2028 end date (extracted text lost the ₹ symbol, so confirm the unit and amounts in the table under the service-charge clause)https://beeindia.gov.in/WriteReadData/L45218/2841453721548450.pdf
2"...put grid-side work for a site up to 100 kW at ₹14.80 lakh, above the ₹11.68 lakh benchmark for the 100 kW charger itself."Upstream benchmark (up to 100 kW) and CCS-II 100 kW charger benchmark in the cost tables; also ₹7.25 lakh for 50 kWhttps://pmedrive.heavyindustries.gov.in/docs/policy_document/EV%20PCS%20operational%20guidelines_F.pdf
3"28 sessions a day, 26 kWh each, ₹21 per kWh revenue, ₹8.50 per kWh electricity ... 5.6 years (headline says 3-4)"ZEON calculator defaults for the Growth plan (interactive, so figures may have been updated)https://www.zeoncharging.com/become_a_zeon_franchise_partner
4"25 vehicles a day ... 1.7 years" (Bolt.Earth Essential, ₹15 lakh plus GST)Default example, payback and the 'before revenue share, excludes upstream work' notehttps://bolt.earth/franchise
5"...52,718 public stations operate, 16,561 with fast chargers for cars."Lok Sabha reply of 21 July 2026 by the Ministry of Heavy Industries; only a news report (IANS via Morung Express) was found, not the reply itselfhttps://morungexpress.com/india-has-52718-public-ev-charging-stations-over-16500-equipped-with-fast-chargers-govt

Publishing details

FieldValue
New URLhttps://www.niir.org/how-to-start/ev-station-franchise/
Page type/how-to-start/ (Product guide)
Parent hubhttps://www.niir.org/manufacturing-ideas/ev-battery/
Primary keywordhow to start an ev charging station franchise in india (changed from: best ev charging station franchise in india, which is a list query; the SERP brief was run on 'How to Start an EV Station Franchise')
Secondary keywords usedev charging station franchise cost; ev charging station franchise in india; best ev charging station franchise (answered as selection criteria, no ranking); how much subsidy for ev charging station; how much area is needed to open an ev charging station
Meta title (56 characters)EV Charging Station Franchise in India: Cost and Payback
Meta description (146 characters)How to start an EV charging station franchise in India: what each price leaves out, payback maths, approvals and subsidy facts as of October 2026.
H1How to Start an EV Charging Station Franchise in India
Slugev-station-franchise
Hreflang pairNone
Author nameP.K. Tripathi
Author bioAssociate Editor at Entrepreneur India and a business consultant with 35+ years of experience advising startups and established enterprises on business planning, project execution and market positioning; author of several books on startups, manufacturing opportunities and entrepreneurship.
Investment bandStarting prices run from ₹9.99 lakh to ₹30 lakh and above, so the range straddles ₹25 lakh and is treated as below ₹25 lakh. NPCS is not mentioned anywhere on the page.
Suggested project reportNot applicable (below ₹25 lakh band)
Word count (body plus FAQ)1494

Internal links used

Anchor textURLSection
CNG station businesshttps://www.niir.org/how-to-start/cng-station/What to do next
EV spare parts businesshttps://www.niir.org/how-to-start/ev-spare-parts-business/What to do next
electric bike assemblinghttps://www.niir.org/how-to-start/electric-bike-assembling/What to do next
franchise business ideashttps://www.niir.org/business-ideas/franchise/What to do next
EV and battery business ideas (parent hub)https://www.niir.org/manufacturing-ideas/ev-battery/What to do next

Sources cited

ClaimSource URLPublisher
Service charge ceilings, tariff cap to 31 March 2028, de-licensed activity, connection time limits, LT connection up to 150 kW, type test, Electrical Inspectorate, fire and PESO conditionshttps://beeindia.gov.in/WriteReadData/L45218/2841453721548450.pdfMinistry of Power (hosted by Bureau of Energy Efficiency)
PM E-DRIVE eligibility, 80% upstream-only support for malls, streets and highways, benchmark costs, ₹2,000 crore for public charginghttps://pmedrive.heavyindustries.gov.in/docs/policy_document/EV%20PCS%20operational%20guidelines_F.pdfMinistry of Heavy Industries
₹2,000 crore for public charging (cross-check)https://www.pib.gov.in/PressReleasePage.aspx?PRID=2199445&reg=3&lang=1Press Information Bureau
DC fast-charging ceilings of ₹11 and ₹13 per unit (cross-check)https://www.autocarpro.in/news/ministry-of-power-revises-guidelines-for-ev-fast-charging-122714Autocar Professional
Bolt.Earth tiers, exclusions, revenue-share note, 1.7 years example, 6-12 month ramp-up, landowner partnershiphttps://bolt.earth/franchiseBolt.Earth
ChargeZone prices, space, load, 2-4 years, 12-20 weeks, PM E-DRIVE subsidy warninghttps://www.chargezone.co.in/franchiseChargeZone
ZEON plans, requirements, calculator inputs and 5.6 years, subsidy warninghttps://www.zeoncharging.com/become_a_zeon_franchise_partnerZEON
Statiq FOCO model, from ₹30 lakh, 2-20 bays, 4-5 years, project cost basishttps://www.statiq.in/ev-charging-station-franchiseStatiq
Tata Power partner and company roles, no registration feehttps://www.tatapower.com/ezcharge/ev-charging-station-franchiseTata Power EZ Charge
EV Mitra described as an SBI initiative, no terms statedhttps://www.tatapower.com/ezcharge/ev-mitraTata Power EZ Charge
52,718 public stations, 16,561 with fast chargers for cars (Lok Sabha, 21 July 2026)https://morungexpress.com/india-has-52718-public-ev-charging-stations-over-16500-equipped-with-fast-chargers-govtIANS via Morung Express

Research log

Page openedWhat it supported
Ministry of Power guidelines 2024 (BEE-hosted PDF)Licence, connection limits, tariff and service-charge ceilings, approvals
MHI PM E-DRIVE EV PCS operational guidelinesEligibility, subsidy categories, benchmark costs, ₹2,000 crore
PIB release, 5 Dec 2025; Construction World, 8 Dec 2025Cross-check of subsidy categories
Franchise pages: Tata Power, Bolt.Earth, ChargeZone, ZEON, Statiq, Tata Power EV MitraPrices, terms, payback claims, warnings
Autocar Professional, 23 Sep 2024Cross-check of service-charge ceilings
Morung Express (IANS), 21 Jul 2026Public station counts

Written and reviewed by

P.K. ChattopadhyayProject Consultant, Niir Project Consultancy Services (NPCS)

P.K. Chattopadhyay is a Project Consultant at Niir Project Consultancy Services with more than 34 years of experience in industrial project consultancy. He specialises in identifying and developing opportunities across industries, project feasibility, market trends and emerging sectors, and guides startups and aspiring entrepreneurs.

View profile on LinkedIn

Planning a new manufacturing unit?

NIIR prepares detailed project reports and feasibility studies for new projects. Share your requirement and the team will get in touch.

Call Us WhatsApp