India semiconductor market at a glance
The India semiconductor market is the value of chips used in the country, and nearly all of them are imported. NITI Aayog puts total demand at USD 37 billion in FY 2024-25. Published estimates range from USD 38 billion for 2023 to USD 64 billion for 2026, and NITI Aayog data show imports of USD 30.3 billion in FY 2024-25.
Demand is growing faster than local supply, so the fabs and assembly plants approved under the India Semiconductor Mission decide how much of it Indian units can capture.
Also searched as: semiconductor industry in India, semiconductor market size in India, chip market in India, microcontroller market, India Semiconductor Mission.
How much semiconductor demand does India have?
India has no official chip production series yet, because commercial output only began in 2026. NITI Aayog tracks demand instead, and puts it at USD 37 billion in FY 2024-25.
| Measure | Period | Value |
|---|---|---|
| Total semiconductor demand in India[6] | FY 2022-23 | USD 28 billion |
| Total semiconductor demand in India[6] | FY 2023-24 | USD 32 billion |
| Total semiconductor demand in India[6] | FY 2024-25 | USD 37 billion |
| Total semiconductor demand in India (estimate)[6] | FY 2025-26 | USD 44 billion |
| Semiconductor demand projected for FY2030 (around)[6] | FY 2029-30 | USD 90 billion |
In NITI Aayog's series, demand rose from USD 28 billion in FY 2022-23 to an estimated USD 44 billion in FY 2025-26. Its roadmap projects growth of about 19% a year, to around USD 90 billion by FY2030.
Local supply meets only a small part of this. The first Indian plants to ship chips are assembly and test units, which receive finished wafers and turn them into packaged, tested chips.
ATMP means assembly, testing, marking and packaging; OSAT means outsourced semiconductor assembly and test. FY is the April to March financial year. The FY 2025-26 and FY2030 rows are NITI Aayog estimates.
Where do India's chips go?
Phones, televisions and other consumer electronics use the largest share of chips in India. EY and IESA put consumer electronics at around 30% of the market, automotive at 16% and industrial uses at 15%.
- Consumer electronics: The largest end use, at around 30% of India's semiconductor market.[11]
- Automotive: About 16% of the market, the second largest end use.[11]
- Industrial: About 15% of the market.[11]
- Microcontrollers: One research firm puts India's microcontroller revenue at USD 6,135.3 million in 2025, with 8-bit parts the largest group.[6][14]
- Chip design: 24 design projects from start-ups and MSMEs have government support, and 211 chips were taped out by 75 institutions by April 2026.[3][5][7]
For a supplier, the split matters more than the total. Automotive and industrial buyers need parts that stay in production for years and pass long qualification tests, while consumer brands buy on price and volume.
Microcontrollers are small chips that run a single device, such as a motor drive, an appliance or a vehicle module. NITI Aayog names automotive and industrial MCUs among the chips India should aim to make.
How big is the India semiconductor market?
Four published figures are shown below, and they do not agree. Converted to rupees, the published figures run from about ₹3.62 lakh crore to ₹6.1 lakh crore.
| Publisher and base year | Estimate | Forecast |
|---|---|---|
| EY and IESA (reported by IBEF)[11]2026, industry association study, all applications | USD 64 billionabout ₹6.1 lakh crore | USD 200 billion by 2035 |
| Research firm A[15]2025, components, materials and end users | USD 59.78 billionabout ₹5.69 lakh crore | USD 180.2 billion by 2034CAGR 11.95% (2026 to 2034) |
| Research firm B[16]2024, devices from memory and logic to power devices | USD 47.8 billionabout ₹4.55 lakh crore | USD 143.7 billion by 2032CAGR 14.9% (2025 to 2032) |
| Ministry of Electronics and IT (PIB)[3]2023, industry estimate quoted by the government, all uses | USD 38 billionabout ₹3.62 lakh crore | not given |
Estimates are published by independent research firms and rating agencies and are not NPCS figures. Rupee equivalents of USD figures use ₹95.25 per USD (6 Nov 2026) and are shown only for comparison.
Why the estimates differ: The figures measure different years, from 2023 to 2026, and chip demand in India rises every year, so a later base year gives a larger value. Scope differs too: the government and EY-IESA figures count chips consumed across all uses, while the research firms do not publish their method on their free pages. NITI Aayog's own demand series is lower than all four for FY 2024-25.
The government's USD 38 billion is an industry estimate for 2023. EY and IESA estimate USD 64 billion for 2026 and project USD 200 billion by 2035. The two research firms sit in between, with forecasts of USD 143.7 billion by 2032 and USD 180.2 billion by 2034.
NITI Aayog's demand figure of USD 37 billion for FY 2024-25 is lower than all four. For a plant decision, the import data and the list of approved projects say more about real demand than any single value.
Who are the key players in India's semiconductor industry?
Most of India's chip manufacturing capacity sits with a handful of large projects approved under the India Semiconductor Mission. The table lists the main ones with their investment and planned capacity.
| Company | What it does | Listed |
|---|---|---|
| Micron Technology[4][10] | Memory assembly and test (ATMP) plant at Sanand, Gujarat; ₹22,516 crore; commercial production from February 2026 | Yes |
| Tata Electronics (with PSMC)[4][6] | India's first silicon fab, at Dholera, Gujarat; about ₹91,000 crore; 50,000 wafers a month; production expected by 2028 | No |
| Tata Semiconductor Assembly and Test[4] | Packaging plant at Morigaon, Assam; ₹27,000 crore; 48 million chips a day | No |
| CG Semi[4][7][13] | OSAT plant at Sanand with Renesas and Stars; about ₹7,600 crore; 15 million chips a day; CG Power holds 92.3% | No |
| Kaynes Semicon[4][7] | OSAT plant at Sanand; ₹3,307 crore; 6.33 million chips a day; in commercial production | No |
| Suchi Semicon[1][9] | OSAT plant at Surat, Gujarat; planned capacity of 1,033.2 million chips a year | No |
| Continental Device India (CDIL)[8][9] | Discrete device plant at Mohali, Punjab; expansion to 158.38 million units a year | No |
Micron, Kaynes Semicon and CG Semi were in commercial production by July 2026. Suchi Semicon and CDIL followed in September 2026, which took the number of units in production to five.
In this table, only the Tata Electronics plant at Dholera is a silicon wafer fab. Most of the others package and test chips, so their output depends on wafers made elsewhere until Indian fabs start.
Investment and capacity figures are from the PIB backgrounder of August 2025 and the Cabinet releases of August 2025 and May 2026. ICRA reports that CG Power holds 92.3% of CG Semi.
Which policies shape the semiconductor industry in India?
Government support decides where and how fast chip plants get built. Fabs and packaging units can receive up to 50% of project cost as fiscal support from the Centre.
| Semicon India Programme (ISM 1.0)[4][5][7] | ₹76,000 crore outlay; up to 50% fiscal support for fabs and packaging units; 12 manufacturing units approved |
|---|---|
| Design Linked Incentive scheme[7] | Financial support for chip design; 24 design projects from start-ups and MSMEs approved |
| India Semiconductor Mission 2.0 (Union Budget 2026-27)[3]Feb 2026 | Announced in the budget with a ₹1,000 crore provision for FY 2026-27 |
| Semicon 2.0[5][7]Jul 2026 | ₹1,27,500 crore outlay for design, equipment and materials, fabs, packaging, R&D and talent |
Semicon 2.0 widens support from plants to the supply chain behind them: equipment, materials, research and talent. For a component, chemical or tooling business, that is the part of the programme to follow closely.
Where are semiconductor plants being built in India?
The 12 approved projects are spread across six states, according to the government. Gujarat has the largest group, around Sanand, Dholera and Surat.
- Gujarat: Sanand (Micron, CG Semi, Kaynes), Dholera (Tata fab, Crystal Matrix) and Surat (Suchi Semicon).[1][4]
- Assam: Tata's chip packaging plant at Morigaon.[4]
- Odisha: SiCSem's silicon carbide unit at Info Valley, Bhubaneswar.[8]
- Uttar Pradesh: The HCL-Foxconn joint venture at Jewar.[4]
- Punjab: CDIL's discrete device plant at Mohali.[8]
- Andhra Pradesh: A packaging unit by ASIP Technologies.[8]
Sanand already has three plants in commercial production. Suppliers of gases, chemicals, spares and maintenance services are likely to find their first buyers there.
What drives chip demand in India, and what holds it back?
Demand is not the constraint, since NITI Aayog projects it to keep growing. The harder part is building local supply, which takes years and very large amounts of capital.
What drives demand
- Chip demand is projected to grow about 19% a year, to around USD 90 billion by FY2030[6]
- Central fiscal support of up to 50% of project cost for fabs and packaging units[4]
- Semicon 2.0, approved by the government in July 2026 with ₹1,27,500 crore for the whole value chain[5]
- A deep design base: India has about 20% of the global chip design workforce[6][7]
What holds it back
- 90–95% of chip consumption is still met through imports[6]
- NITI Aayog data show semiconductor imports of USD 30.3 billion in FY 2024-25[6]
- A fab needs four to five years before production; the first one is expected in 2028[6]
- NITI Aayog reports that a modern analog fab needs over USD 5 billion of capital[6]
How much does India spend on semiconductor imports?
Imports cover most of India's chip needs. NITI Aayog data show imports of semiconductor products rising from USD 5.7 billion in FY 2016-17 to USD 30.3 billion in FY 2024-25.
| Measure | Period | Value |
|---|---|---|
| Imports of semiconductor chips (HS 8542 only)[2] | FY 2023-24 | USD 20.7 billion |
| Imports of semiconductor products (HS 8541 and 8542)[6] | FY 2016-17 | USD 5.7 billion |
| Imports of semiconductor products (HS 8541 and 8542)[6] | FY 2020-21 | USD 11.9 billion |
| Imports of semiconductor products (HS 8541 and 8542)[6] | FY 2023-24 | USD 28.7 billion |
| Imports of semiconductor products (HS 8541 and 8542)[6] | FY 2024-25 | USD 30.3 billion |
The two figures for FY 2023-24 count different goods. NITI Aayog's figure of USD 28.7 billion covers HS 8541 and 8542, while the Lok Sabha answer's USD 20.7 billion counts integrated circuits under HS 8542 only.
HS 8541 adds discrete devices such as diodes and transistors, and it also covers LEDs and solar cells. On these figures, integrated circuits make up most of the import bill, and they are what the new packaging plants will handle.
Recent developments in the semiconductor industry
The programme moved from approvals to commercial production during 2026.
Commercial production began at two more plants, in Mohali and Surat; five units are now in production.[9][12]
An EY-IESA report projected India's semiconductor market to reach US$ 200 billion by 2035.[11]
The government approved Semicon 2.0 with a ₹1,27,500 crore outlay.[5][7]
Two more projects were approved, in Dholera and Surat, taking the total to 12.[1]
Micron began commercial production at its Sanand assembly and test plant.[10]
The government announced ISM 2.0 in the Union Budget with ₹1,000 crore for FY 2026-27.[3]
Four projects were approved in Odisha, Punjab and Andhra Pradesh, taking the total to 10.[8]
How NPCS helps with semiconductor and electronics projects
- Market research reportDemand, imports, company profiles and policy for the semiconductor industry in India.
- Supply chain opportunity studyFind the gases, chemicals, parts or services that new chip plants near you will buy.
- Detailed project reportPlant cost, machinery and five-year projections for an electronics component or packaging unit.
- Custom market surveyBuyer and supplier research for a chip type, component or customer group.
NPCS has helped launch businesses across 40+ sectors since 1994, serving 150K+ clients in 85 countries with 150K successful projects delivered.
What the NPCS semiconductor industry report covers
- Market overview and definition
- Market size and growth
- Growth drivers and industry trends
- Demand and supply situation
- Foreign trade: imports and exports
- Regulatory framework and recent changes
- Porter's five forces analysis
- SWOT analysis
- Key player profiles with financials
- Shareholding pattern, revenue mix and plant locations
This page summarises public data. The full report adds company profiles, financials and the demand-supply analysis.
Request the report contentsProject reports for this industry
Planning a plant rather than studying the market? These NPCS project reports cover plant cost, machinery and profitability, each with a free illustrative sample.
- Printed Circuit Board project report
- Solar Cell project report
- Lithium Ion Battery project report
- Lead Acid Battery project report
- LED Light Assembling project report
- Battery Sprayer project report
- E Waste Lithium Battery Recycling project report
- Induction Furnace project report
- Plastic Battery Containers project report
- Solar Inverter project report
How this page was researched
Each figure on this page is taken from a source we opened on the date shown, and the source is numbered in the list below. Government data comes first. Company figures come from company filings and documents, or from rating-agency sector notes.
Market size estimates are published by research firms and rating agencies. They often disagree, because they define the market differently or use different base years. We show them side by side instead of choosing one. Rupee equivalents of US dollar figures use ₹95.25 per USD and are for comparison only.
NPCS does not add its own forecasts to this page. The page is reviewed every 6 months, or sooner when a major data release or policy change comes out.
Semiconductor industry in India: frequently asked questions
What is the size of the semiconductor market in India?
There is no single official figure. The government cites an industry estimate of about USD 38 billion for 2023, and NITI Aayog puts demand at USD 37 billion in FY 2024-25. Research firms estimate USD 47.8 billion to USD 59.78 billion for 2024 or 2025, and EY and IESA put it at about USD 64 billion in 2026. Base years and scope differ.
How much of India's semiconductor demand is met by imports?
Most of it. NITI Aayog says 90–95% of current consumption is met through imports. Its data show imports under HS codes 8541 and 8542 rising from USD 5.7 billion in FY 2016-17 to USD 30.3 billion in FY 2024-25. Integrated circuits alone cost USD 20.7 billion in FY 2023-24, the government told the Lok Sabha.
Does India manufacture semiconductor chips?
Yes, at the assembly and test stage, while the first silicon fab is still being built. Micron began commercial production at Sanand in February 2026, and five units were in production by September 2026. The Tata Electronics fab at Dholera is expected to start production by 2028, according to NITI Aayog. Most chips used in India are still imported.
What is the India Semiconductor Mission?
It is the government programme that funds chip plants and chip design. Under Semicon 1.0, the government set a ₹76,000 crore outlay with up to 50% fiscal support for fabs and packaging units, and 12 manufacturing units have been approved. The government approved Semicon 2.0 in July 2026 with ₹1,27,500 crore, adding equipment, materials, research and talent to the support.
Who are the main semiconductor companies in India?
Tata Electronics, Micron, CG Semi and Kaynes Semicon lead the approved projects. Government data show about ₹91,000 crore for the Tata fab at Dholera, ₹27,000 crore for the Tata packaging plant in Assam and ₹22,516 crore for Micron at Sanand. Suchi Semicon and CDIL started commercial production in September 2026.
What is the size of the microcontroller market in India?
One research firm puts India's microcontroller revenue at USD 6,135.3 million in 2025 and projects USD 18,366.1 million by 2033, growing 14.9% a year from 2026. It names 8-bit parts as the largest product group. There is no official figure for microcontrollers, so treat this as one published view rather than a measured total.
What does the NPCS semiconductor industry report add to this page?
This page summarises public data and published estimates. The NPCS report adds company profiles with financials, demand and supply analysis, foreign trade, the regulatory framework and a SWOT analysis. It suits investors, lenders and companies planning a packaging unit, an electronics component plant or a supply business for chip makers. Ask for the report contents and price through the enquiry form.
Sources
- India Semiconductor Mission: Momentum accelerates further as India advances into Compound Semiconductor based Mini/Micro LED Display ManufacturingCabinet, Government of India (PIB), Official, checked Nov 2026
- Lok Sabha Unstarred Question 1513, 4 Dec 2024: Import to meet semiconductor demandLok Sabha (Ministry of Electronics and IT), Official, checked Nov 2026
- India Semiconductor Mission 2.0: A Major Push in Budget 2026 towards Semiconductor Self-RelianceMinistry of Electronics and IT (PIB), Official, checked Nov 2026
- India's Semiconductor Revolution: Powering the Future of ElectronicsMinistry of Electronics and IT (PIB), Official, checked Nov 2026
- Semiconductor and AI Revolution: Powering the FutureMinistry of Electronics and IT (PIB), Official, checked Nov 2026
- Future of India's Semiconductor Industry (NITI Frontier Tech Hub roadmap)NITI Aayog, Official, checked Nov 2026
- Cabinet approves Semicon 2.0Prime Minister's Office (pmindia.gov.in), Official, checked Nov 2026
- Cabinet approves semiconductor manufacturing units in Odisha, Punjab and Andhra Pradesh with an outlay of Rs.4600 crorePrime Minister's Office (pmindia.gov.in), Official, checked Nov 2026
- PM inaugurates SEMICON India 2026Prime Minister's Office (pmindia.gov.in), Official, checked Nov 2026
- PM's address during inauguration of Micron Semiconductor Technology India Pvt Ltd's facility in GujaratPrime Minister's Office (pmindia.gov.in), Official, checked Nov 2026
- India's Semiconductor Market Projected to Cross US$ 200 Billion by 2035: EY-IESA ReportEY and IESA (reported by IBEF), Industry bodies and rating agencies, checked Nov 2026
- India Has Five Semiconductor Units in Production, ISM 2.0 to Build Wider Ecosystem: MeitY SecretaryIBEF, Industry bodies and rating agencies, checked Nov 2026
- CG Semi Private Limited: [ICRA]AA- (Stable); assignedICRA, Industry bodies and rating agencies, checked Nov 2026
- Published market estimate (Research firm C)Independent research firm, not named or linked, checked Nov 2026
- Published market estimate (Research firm A)Independent research firm, not named or linked, checked Nov 2026
- Published market estimate (Research firm B)Independent research firm, not named or linked, checked Nov 2026
Estimates from independent research firms are shown as Research firm A, B and so on, without the firm's name or a link.