Plant capacity
31 MT per day
Total project cost
₹719 lakh
Plant and machinery
₹362 lakh
Return on investment
18% (Year 3)
Break-even
35% of capacity
Payback period
About 3.9 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a liquid carbon dioxide project report?

A liquid carbon dioxide project report is a detailed project report (DPR) for a plant that captures CO2 gas, cleans it, and compresses and chills it into liquid for sale. It sets out the gas source, process, machinery, licences, project cost, means of finance, five-year projections, DSCR and break-even that a lender reviews.

Promoters, distillery owners adding a CO2 recovery unit and gas distributors use it to size the plant and raise a term loan; banks use it to judge repayment.

Also known as: liquid CO2 plant project report, CO2 recovery plant DPR, project report on liquid carbon dioxide, liquid carbon dioxide business plan.

Liquid carbon dioxide manufacturing plant cost in India

Our sample report models a 31 MT per day CO2 recovery unit beside a distillery, running 330 days a year for 10,230 MT of capacity. It starts at 60% utilisation, reaches 80% in Year 5 and sells liquid CO2 at ₹8,310 per MT ex-factory.

Plant and machinery is the largest cost head, followed by building and civil works for the compressor house, refrigeration room and tank foundations.

₹719 lakhTotal project cost
₹595 lakhSales in Year 3
₹127 lakhNet profit in Year 3
1.64Average DSCR
Cost of project (₹ lakh)
Land and site development39.01
Building and civil works206.57
Plant and machinery361.89
Other fixed assets49.43
Contingencies28.42
Preliminary and pre-operative17.13
Working capital margin16.56
Total719.01
Means of finance (₹ lakh)
Promoter's contribution (25%)179.75
Term loan from bank (75%)539.26
Cash credit limit (separate)49.67
Total project cost719.01

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments; lowest yearly DSCR 1.44. All figures are illustrative.

Liquid carbon dioxide manufacturing process

Fermentation gas is already rich in CO2, so the plant's job is to remove traces of alcohol, sulphur compounds, water and air, then liquefy what is left. The sequence below is the one modelled in the sample report.

  1. Gas collection

    CO2 leaving the distillery fermenters passes a foam trap into a gas balloon, which evens out the flow to the compressor.

  2. Water scrubbing

    A water wash column strips out ethanol and other water-soluble impurities that would taint beverage-grade gas.

  3. Compression

    An oil-free two-stage compressor with intercoolers lifts the gas to about 16–18 bar, so no lubricant reaches the product.

  4. Purification

    An oxidiser scrubber and activated carbon beds take out hydrogen sulphide, other sulphur compounds and odour.

  5. Drying

    Twin molecular sieve towers remove moisture, one drying while the other regenerates, so ice cannot block the liquefier.

  6. Liquefaction and stripping

    An ammonia refrigeration unit condenses the CO2, and a stripper column with reboiler vents oxygen and nitrogen that stay as gas.

  7. Storage and dispatch

    Liquid CO2 goes to insulated storage tanks and leaves by road tanker or in filled cylinders after a purity check.

Where does a liquid CO2 plant get its gas?

The gas source decides most of the plant design, the energy bill and how many days a year you can run. Settle it before any machinery quotation.

Fermentation recoveryGas from grain or molasses distillery and brewery fermenters is already mostly CO2, so it needs the least clean-up and energy. Output follows the distillery's run days. This is the route in our sample report.
Flue gas with amine captureFuel such as natural gas, diesel or biomass is burnt, the CO2 is absorbed in an amine (MEA) solution and released in a stripper. It can be sited near buyers, but fuel and steam add running cost.
Chemical plant off-gasAmmonia, hydrogen and ethylene oxide plants vent concentrated CO2. Raw gas is cheap, but the unit has to sit next to the host plant under a long-term supply contract.
Lime kiln and process off-gasKilns and some chemical processes give a dilute, dusty CO2 stream. It needs more washing and purification and usually suits industrial-grade sales.

Raw materials and inputs for liquid CO2

A recovery unit buys its raw gas from the distillery, usually at a fixed rate per tonne under a long agreement that also covers land on the distillery site. Electricity for the compressor and refrigeration plant is the biggest input, which is why the sample shows it with raw materials.

InputShare of costYear 3 (₹ lakh)
Electricity for compression and liquefaction55%93.75
Raw CO2 gas from distillery fermentation30%51.14
Purification chemicals and adsorbents10%17.05
Refrigerant and cooling water chemicals5%8.52
Total100%170.46

Activated carbon and molecular sieve are replaced on a schedule; a report that leaves them out under-states running cost.

Machinery for a CO2 recovery and liquefaction plant

The oil-free compressor is the most expensive item in the sample, closely followed by the refrigeration unit and liquefier. Together they decide the power bill, so compare quotations on kWh per tonne as well as price.

MachineWhat it doesSample cost (₹ lakh)
Two-stage oil-free CO2 compressorRaises gas to liquefaction pressure79.62
Ammonia refrigeration unit and CO2 liquefierChills and condenses the gas72.38
Insulated liquid CO2 storage tanksHold several days of output57.90
Oxidiser scrubber and activated carbon filtersRemove sulphur and odour28.95
Molecular sieve dryerRemoves moisture28.95
Stripper column with reboilerVents non-condensable gases28.95
Foam trap and water scrubberCatch foam and wash out alcohol21.72
Tanker loading and cylinder filling stationDispatches the product21.71
Online gas analysers and control systemTrack purity and run the plant21.71
Total plant and machinery361.89

Costs are the sample report's estimates for a 31 MT per day unit. Road tankers are not included; get current quotations before you finalise.

How many people does a liquid CO2 plant need?

A CO2 recovery unit runs round the clock but is largely automatic, so the team is small. The sample plans for 15 people across three shifts, with operators trained on ammonia refrigeration and pressure vessel safety.

CategoryNumberYear 1 cost (₹ lakh)
Management, supervision and administration27.80
Skilled workers and operators512.30
Semi-skilled and unskilled workers812.96
Total1533.06

Licences and approvals for a liquid CO2 plant

Liquid CO2 is stored and moved under pressure, so the Petroleum and Explosives Safety Organisation (PESO) licences matter as much as the usual factory approvals.

Storage tanksPESO licence in Form LS-1A or LS-1B under the Static and Mobile Pressure Vessels (Unfired) Rules to store compressed gas, with a no objection certificate from the district authority
Road tankersPESO licence in Form LS-2 for each vessel used to transport compressed gas
Cylinder fillingPESO licence in Form E or F under the Gas Cylinders Rules, 2016, applied for online through the National Single Window System
Product standardIS 307:2024, the third revision of the BIS specification for carbon dioxide; the BIS page shows no mandatory certification as of October 2026
GST18% under the general Chapter 28 entry; carbon dioxide is classed under heading 2811
Other approvalsUdyam and GST registration, consent to establish and operate from the State Pollution Control Board, factory licence and fire NOC

Who buys liquid carbon dioxide?

Beverage carbonation is the anchor demand, and it peaks in summer. Dry ice, welding and fire safety buyers spread sales across the year. Bottlers pay more for food-grade gas but audit purity and expect assured supply.

  • Soft drink, soda and packaged beverage bottlers
  • Dry ice makers serving cold chain and food logistics
  • Welding gas distributors and fabrication units
  • Fire extinguisher makers and refillers
  • Water treatment plants using CO2 for pH control

Freight sets the market: liquid CO2 travels in insulated pressure tankers, so most plants sell within a few hundred kilometres. A new distillery-based unit wins where the nearest supplier is far away.

Mistakes that weaken a liquid carbon dioxide project report

  • Assuming raw gas every day of the year

    Distilleries stop for maintenance and some run seasonally. Run days and storage must match the host plant's schedule, or sales will fall short.

  • No written raw gas agreement

    Lenders look for a long-term contract covering gas quantity, price, land and exit terms. A verbal understanding with the distillery weakens the case.

  • Under-stating electricity

    Compression and refrigeration run continuously. Using an average tariff, or leaving out demand charges, inflates profit and DSCR.

  • Pricing all output as food grade

    Not every tonne goes to bottlers. Welding and industrial buyers pay less, so the report needs a realistic sales mix.

  • Forgetting tankers and cylinders

    Delivery needs road tankers or a cylinder pool, each with PESO licences. Leaving them out of cost or working capital stalls dispatch.

How NPCS helps you plan a liquid CO2 plant

  • Gas source and capacitySize the plant to the distillery's or host plant's gas flow and run days.
  • Technology and suppliersCompare recovery and flue gas routes and get compressor and liquefier quotations.
  • Bank-ready project reportProjections, DSCR, power cost and working capital in your lender's format.
  • PESO and plant layoutTank, tanker and filling licences, layout and the approvals list for your state.

NPCS's published client list includes an assignment for liquid carbon dioxide and 269 across specialty chemicals, for entrepreneurs and companies in India and abroad since 1994.

What's inside the liquid carbon dioxide sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

19 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Liquid Carbon Dioxide project report: frequently asked questions

What is the liquid carbon dioxide manufacturing plant cost in India?

Cost depends mainly on capacity, the CO2 source and how much storage and tanker capacity you build. Our sample report models a 31 MT per day recovery unit at a distillery with a total project cost of ₹719 lakh, including ₹362 lakh of plant and machinery. A flue gas plant costs more because it adds a burner, absorber and stripper. Your report works out the cost for your site.

What is the raw material for liquid CO2?

The raw material is a CO2 rich gas stream, most often from distillery fermenters, flue gas from burning fuel, or off-gas from ammonia and hydrogen plants. Electricity is the other main input, because compression and refrigeration run all day. In our sample report electricity is 55% of input cost and raw gas bought from the distillery is 30%.

How is liquid carbon dioxide made?

The gas is collected, washed with water, compressed to about 16–18 bar in an oil-free compressor, purified over oxidiser and activated carbon beds, and dried in molecular sieve towers. An ammonia refrigeration unit then condenses it to liquid, and a stripper column removes gases that do not condense. The liquid is stored in insulated tanks.

Is a liquid CO2 plant profitable?

In our illustrative sample, a 31 MT per day unit earns a net profit of ₹127 lakh on sales of ₹595 lakh in Year 3. Return on investment is 18% and break-even comes at 35% of capacity. Real profit depends on raw gas price, power tariff, run days of the gas source, tanker logistics and the share of food-grade sales.

Which licences are needed to start a liquid CO2 plant?

Besides Udyam, GST, pollution board consent and a factory licence, a CO2 plant needs PESO licences. These come under the Static and Mobile Pressure Vessels (Unfired) Rules, for storing liquid CO2 in tanks and moving it by road tanker. If you fill cylinders, you also need a PESO filling licence under the Gas Cylinders Rules, 2016.

What is the GST rate and HSN code for liquid carbon dioxide?

Carbon dioxide falls under heading 2811 (subheading 2811 21) of the customs tariff. It is not among the Chapter 28 items taxed at 5%. So it takes the general 18% rate for inorganic chemicals in the GST schedules in force from 22 September 2025. Confirm the rate for your supply with your tax adviser.

Is the liquid carbon dioxide project report PDF free, and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report; its figures are representative and not based on a real project. It should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, gas source, location and lender.

Sources and references

  1. IS 307:2024 Carbon dioxide, specification (third revision)Bureau of Indian Standards, checked Oct 2026
  2. FAQ on the Static and Mobile Pressure Vessels (Unfired) RulesPetroleum and Explosives Safety Organisation, checked Oct 2026
  3. FAQ on the Gas Cylinders Rules, 2016Petroleum and Explosives Safety Organisation, checked Oct 2026
  4. Notification No. 9/2025-Integrated Tax (Rate): GST rate schedulesCentral Board of Indirect Taxes and Customs, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different specialty chemicals project?

These are a few of the projects we advise on. NPCS's published client list records 269 specialty chemicals assignments, so tell us what you are planning.

Tell us your project

Recent specialty chemicals assignments

  • Iiconnic Apparels
    Comprehensive Project Report on SilicaPaurri Garhwal, 2026
  • Parul Industries
    Project Feasibility Report on Nicotine for industrial applicationsValsad, 2026
  • Rich Phytocare Private Limited
    Industrial Project Report on Potassium SchoeniteBodinayakanur, 2026
  • Lakshya Powertech Ltd
    Techno-Economic Project Study on Acoustic PanelsMumbai, 2026
  • Luxury Line Interiors & Furniture
    Project Feasibility Report on Precipitated Silica & Activated Carbon for Industrial ApplicHyderabad, 2026
  • Indian Potash Limited
    Techno-Economic Feasibility Report on Citric AcidCoimbatore, 2026
  • Cecilia Still
    Detailed Project Report on Tall Oil RosinsEurope, 2026
  • Taraka Pamidi
    Technical and Financial Feasibility Report on Silica-, 2025

Get a liquid carbon dioxide project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Liquid Carbon Dioxide Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free liquid carbon dioxide sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Liquid Carbon Dioxide sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp