Coal Tar Pitch Plant Project Report

Plant cost, tar distillation process, machinery and five-year profitability for a coal tar pitch unit, with a free sample project report PDF you can open now.

Plant capacity
14 MT per day
Total project cost
₹1,256 lakh
Plant and machinery
₹639 lakh
Return on investment
29% (Year 3)
Break-even
33% of capacity
Payback period
About 3 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a coal tar pitch project report?

A coal tar pitch project report is a detailed project report (DPR) for a plant that distils crude coal tar from coke ovens. The heavy residue, pitch, is sold as a carbon binder. The report sets out tar sourcing, the distillation process, machinery, pitch grades, approvals, project cost, five-year projections, DSCR (debt service coverage ratio) and break-even for lenders.

Promoters use it to size the plant and raise a term loan; banks and investors use it to judge whether tar supply and pitch sales can carry the debt.

Also known as: coal tar distillation project report, coal tar pitch plant project report, DPR for a coal tar pitch plant, coal tar pitch business plan.

Coal tar pitch manufacturing plant cost in India

Our sample report models a plant making 14 MT of pitch a day, or 4,620 MT a year over 330 days. Output rises from 60% to 80% of capacity by Year 5, and pitch sells at ₹71,300 per MT. The naphthalene, wash and anthracene oils are credited against crude tar cost, so pitch is the only product in the model.

₹1,256 lakhTotal project cost
₹2,306 lakhSales in Year 3
₹365 lakhNet profit in Year 3
2.20Average DSCR
Cost of project (₹ lakh)
Land and site development64.83
Building and civil works323.54
Plant and machinery638.77
Other fixed assets76.46
Contingencies48.12
Preliminary and pre-operative28.79
Working capital margin75.10
Total1,255.61
Means of finance (₹ lakh)
Promoter's contribution (25%)313.90
Term loan from bank (75%)941.71
Cash credit limit (separate)225.28
Total project cost1,255.61

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments. DSCR is lowest in Year 2 at 1.92. All figures are illustrative.

Coal tar pitch manufacturing process

Pitch is the residue left when crude tar is distilled. The plant's job is to take off the oils cleanly and then bring the residue to the softening point and coking value a buyer has approved.

  1. Tar receipt and settling

    Tankers from coke ovens unload into steam-heated tanks, where free water, coke dust and sludge settle out before the tar is pumped forward.

  2. Dehydration

    Tar is preheated and flashed in a dehydration column to remove the remaining water and light oil, which would otherwise cause foaming in the main column.

  3. Fractional distillation

    Dry tar is heated in a tube furnace to around 400 °C and split in a fractionating column into naphthalene oil, wash oil and anthracene oil. Pitch collects at the bottom.

  4. Pitch heat treatment

    Hot pitch is held in stirred reactors to raise its softening point and coking value. Holding time and temperature set the grade.

  5. Cooling and forming

    Pitch is cooled on a steel belt into pastilles or flakes for bagging, or kept molten in heated tanks for tanker dispatch to nearby smelters.

  6. Testing and dispatch

    Each lot is tested for softening point, quinoline insolubles (QI, fine solids that do not dissolve in quinoline) and coking value before release.

Which coal tar pitch grade should your plant make?

The same column can make several grades; heat treatment, the QI of your tar and the dispatch form decide which. Fix the grade mix before you size the reactors and storage.

Binder pitchFor aluminium smelter anodes and graphite electrodes. Needs a higher softening point and coking value and tight lot-to-lot consistency; buyers approve it after trial lots.
Impregnating pitchLow-QI pitch forced into baked electrodes to densify them. CSIR-NPL's impregnating grade, for example, is specified at a softening point of 80–100 °C and QI of 0–3%.
Electrode paste and refractory pitchMedium grades for Soderberg electrode paste in ferro alloy furnaces, tap-hole mass and pitch-bonded refractory bricks. More tolerant of QI.
Soft pitch for coatingsLower softening point grades, often cut back with tar oils, for waterproofing, roofing and pipe coating compounds.
Solid or liquid dispatchSolid pastilles travel in bags to distant buyers. Liquid pitch saves the cooling and remelting cost but needs heated tankers and a buyer within trucking distance.

Crude coal tar, the one raw material that decides profit

Crude high-temperature tar from steel plant and merchant coke ovens is the only main input. About half its weight comes out as pitch and the rest as distillate oils and water, so water and QI are tested on every tanker.

Raw materialShare of costYear 3 (₹ lakh)
Crude coal tar (net of distillate oil sales)94%984.00
Process and effluent treatment chemicals6%62.81
Total100%1,046.81

Read the tar line carefully: net raw material cost is 45.4% of sales in the sample only because oil sales are credited against tar. If oil prices fall, the net tar cost rises even when the tar price does not.

Machinery for a coal tar pitch plant

Most of the spend is on heating and separation. The fractionating column with its condensers is the largest single item in the sample, followed by the tube furnace and thermic fluid heater.

EquipmentWhat it doesSample cost (₹ lakh)
Heated tar storage and settling tanksHolds tar fluid and separates water and solids76.65
Tar dehydration column with preheatersRemoves water and light oil63.88
Tube furnace and thermic fluid heaterHeats tar for distillation and keeps lines hot114.98
Fractionating column, condensers and receiversSplits and collects the oil fractions140.53
Pitch heat treatment reactorsBring pitch to the required grade63.88
Pitch cooling belt and pastillatorForms solid pitch for bagging63.88
Fume scrubber and phenolic effluent plantTreats vapours and process water76.65
Instrumentation and control systemControls temperatures, levels and cuts38.32
Total plant and machinery638.77

Costs are the sample report's estimates for a 14 MT per day plant. Get current quotations before you finalise.

Licences, standards and GST for a coal tar pitch plant

Pollution board consentCoal tar distillation is in the red category under CPCB criteria. Consent to establish is needed before construction and consent to operate before production.
Product standardIS 216:2006 is the Indian specification for coal tar pitch. Test methods for quinoline insolubles and coking value are in IS 13758 Parts 1 and 2.
Hazardous chemicalsNaphthalene and benzene, both present in tar distillates, are listed in Schedule 1 of the MSIHC Rules, 1989. The plant must follow the Rules on safe storage, labelling and safety data, with added duties above threshold quantities.
Petroleum storageA PESO licence under the Petroleum Rules, 2002 is needed to store naphtha, furnace oil or other listed petroleum above exempt quantities.
GSTHSN 2708, pitch and pitch coke from coal tar, at 18% under the September 2025 rate notification.
Business and factoryUdyam and GST registration, a factory licence under the Factories Act, and fire safety approval for a plant handling hot tar and oils.

Rules checked in October 2026. Confirm siting and consent conditions with your state pollution control board before buying land.

Who buys coal tar pitch in India?

Demand is tied to aluminium smelting and electric arc steelmaking. Smelters consume pitch as anode binder every day, and graphite electrodes for arc furnaces need both binder and impregnating pitch. Smelters mostly buy on long-term contracts from large distillers attached to steel plant tar.

A smaller plant usually builds its order book with buyers who take smaller lots and accept a wider range of grades:

  • Graphite electrode and carbon product makers
  • Electrode paste makers serving ferro alloy plants
  • Refractory and tap-hole mass producers
  • Waterproofing, roofing and pipe coating firms
  • Anode plants at aluminium smelters, after trial approval
  • Export buyers in the Gulf and South East Asia

Where a new plant wins: tar is costly to move and pitch is cheaper to sell molten. A unit sited between a coke oven cluster and its buyers saves freight at both ends.

Mistakes that weaken a coal tar pitch project report

  • No firm tar supply agreement

    Much crude tar is sold through auctions or short contracts. A report that assumes tar without a supply contract or a tested second source will not convince a lender.

  • Pricing all output as binder grade

    Only lots that pass smelter specifications earn binder prices. Off-spec pitch goes to lower-value uses, so the sales mix must allow for it.

  • Ignoring the oil credit

    Distillate oils carry a large part of the tar cost. Projections should test a fall in oil prices, not only a rise in tar prices.

  • Under-costing fume and effluent control

    Pitch fumes and phenolic process water are why the plant is red category. In the sample, the scrubber and effluent plant cost ₹76.65 lakh.

  • Forgetting heat on every line

    Tar and pitch must stay hot from tanker to dispatch. Thermic fluid, steam tracing and fuel for heated storage add to running cost.

How NPCS helps you plan a coal tar pitch plant

  • Tar sourcing and yield balanceSize the plant to the tar you can secure and work out pitch and oil output for your tar.
  • Grade and buyer mappingChoose binder, impregnating or coating grades to match the buyers within reach.
  • Lender-ready project reportProjections, DSCR and sensitivity to tar and oil prices in the format your bank wants.
  • Approvals and plant layoutRed category consent, MSIHC and PESO requirements, and a layout for heated storage and dispatch.

NPCS's published client list records 269 specialty chemicals assignments, and the NPCS project team has prepared reports on coal tar pitch and coal tar distillation for entrepreneurs, banks and companies.

What's inside the coal tar pitch sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

18 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Real NPCS coal tar pitch project reports

These are coal tar pitch project reports NPCS has prepared, with the plant capacity, total capital investment, rate of return and break-even worked out in each. Costs have moved since some were written, so we bring any of them up to date for your capacity and location.

Project reportPlant capacityTotal investmentRate of returnBreak-evenAction
Coal TAR Pitch7500 MT/Annum₹3.4 crore43%56% Get this report
Coal Tar Pitch DistillationOn request₹30.68 crore46%38% Get this report

Figures as worked out in each NPCS report. Total investment includes plant and machinery, land and building, and working capital.

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Coal Tar Pitch project report: frequently asked questions

How much does a coal tar pitch manufacturing plant cost in India?

A small tar distillation unit making 10–20 MT of pitch a day needs roughly ₹10–20 crore, including land, building, heated storage, effluent treatment and working capital margin. Our sample report models a 14 MT per day plant at ₹1,255.61 lakh. These are indicative figures; the real cost depends on tar volume, the grades you make and the pollution controls your state board asks for.

What raw material is used to make coal tar pitch?

Crude high-temperature coal tar, a by-product of coke ovens in steel plants and merchant coke units, is the only main raw material. About half its weight comes out as pitch and the rest as distillate oils and water. Our sample report counts tar at 94% of raw material cost, net of the oils sold alongside the pitch.

What is coal tar pitch used for?

Its main use is as the binder in carbon anodes for aluminium smelting and in graphite electrodes for electric arc furnaces. Low-QI impregnating pitch is used to densify electrodes. Pitch also goes into refractory bricks, tap-hole mass, electrode paste for ferro alloy furnaces, and waterproofing and pipe coating compounds.

Is coal tar pitch manufacturing profitable?

It can be, if tar supply is secure and the pitch meets buyer specifications. In our illustrative sample, a 14 MT per day plant earns a 29% return on investment in Year 3. It breaks even at about 33% of capacity and pays back in about 3 years. Real margins move with crude tar prices and with what the distillate oils fetch.

What is the HSN code and GST rate for coal tar pitch?

Coal tar pitch falls under HSN heading 2708, pitch and pitch coke obtained from coal tar or other mineral tars. It is taxed at 18% GST under Schedule II of the rate notification of 17 September 2025, the same rate as crude tar under heading 2706. Check the current CBIC notification before you price contracts.

Which pollution category applies to a coal tar distillation plant?

Coal tar distillation is listed in the red category under CPCB criteria, as adopted by state pollution control boards. A red category unit needs consent to establish before construction and consent to operate before production, and usually faces siting limits and closer monitoring. Plan fume scrubbing and phenolic effluent treatment into the project cost from the start.

Is the sample report free and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report. Its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, tar source, location and lender.

Sources and references

  1. Notification No. 9/2025-Integrated Tax (Rate), 17 September 2025Central Board of Indirect Taxes and Customs, checked Oct 2026
  2. IS 216:2006 Coal tar pitch, specificationBureau of Indian Standards, checked Oct 2026
  3. IS 13758 (Part 1):1993 Coal tar pitch, determination of matter insoluble in quinolineBureau of Indian Standards, checked Oct 2026
  4. IS 13758 (Part 2):1993 Coal tar pitch, determination of coking valueBureau of Indian Standards, checked Oct 2026
  5. Categorisation of industrial sectors under red as per CPCB criteriaState Pollution Control Board, Odisha, checked Oct 2026
  6. Manufacture, Storage and Import of Hazardous Chemical Rules, 1989Inspectorate of Factories and Boilers, Government of Goa, checked Oct 2026
  7. Requirement of licence under Petroleum Rules, 2002 for storage of petroleumPetroleum and Explosives Safety Organisation, checked Oct 2026
  8. Coal tar pitch (impregnating grade) technologyCSIR-National Physical Laboratory, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different specialty chemicals project?

These are a few of the projects we advise on. NPCS's published client list records 269 specialty chemicals assignments, so tell us what you are planning.

Tell us your project

Recent specialty chemicals assignments

  • Iiconnic Apparels
    Comprehensive Project Report on SilicaPaurri Garhwal, 2026
  • Parul Industries
    Project Feasibility Report on Nicotine for industrial applicationsValsad, 2026
  • Rich Phytocare Private Limited
    Industrial Project Report on Potassium SchoeniteBodinayakanur, 2026
  • Lakshya Powertech Ltd
    Techno-Economic Project Study on Acoustic PanelsMumbai, 2026
  • Luxury Line Interiors & Furniture
    Project Feasibility Report on Precipitated Silica & Activated Carbon for Industrial ApplicHyderabad, 2026
  • Indian Potash Limited
    Techno-Economic Feasibility Report on Citric AcidCoimbatore, 2026
  • Cecilia Still
    Detailed Project Report on Tall Oil RosinsEurope, 2026
  • Taraka Pamidi
    Technical and Financial Feasibility Report on Silica-, 2025

Get a coal tar pitch project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Coal Tar Pitch Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free coal tar pitch sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Coal Tar Pitch sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp