Butene-1 Plant Project Report

Plant cost, process routes, machinery, licences and five-year profitability for a butene-1 unit, with a free sample report you can open right now.

Also known as: 1-butene, but-1-ene, alpha-butylene, 1-butylene

Plant capacity
8.6 MT per day
Total project cost
₹1,208 lakh
Plant and machinery
₹564 lakh
Return on investment
19% (Year 3)
Break-even
39% of capacity
Payback period
About 3.9 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a butene-1 project report?

A butene-1 project report is a detailed project report (DPR) for a plant that makes polymer-grade butene-1, the C4 alpha olefin used as a comonomer in LLDPE and HDPE. It covers the process route, feedstock, machinery, approvals, project cost, means of finance, five-year projections, DSCR and break-even that a lender or board needs before funding.

Petrochemical companies, refinery-linked investors and C4 stream processors use it to test a project; banks use it to check whether the plant can repay.

Also known as: 1-butene, but-1-ene, alpha-butylene, 1-butylene.

Butene-1 plant cost and economics

The sample report models a compact recovery unit of 8.6 MT per day, or 2,838 MT per year at full capacity, running 330 days a year. It starts at 60% capacity and reaches 80% in Year 5, with butene-1 priced at ₹1,07,000 per MT before GST.

Plant and machinery is the largest cost head at ₹563.74 lakh, followed by building and civil works at ₹324.83 lakh. The columns, storage bullets and flare need heavy foundations and pipe racks, which is why civil cost runs high for a chemical unit of this size.

₹1,208 lakhTotal project cost
₹2,126 lakhSales in Year 3
₹225 lakhNet profit in Year 3
1.66Average DSCR
Cost of project (₹ lakh)
Land and site development82.14
Building and civil works324.83
Plant and machinery563.74
Other fixed assets94.15
Contingencies44.43
Preliminary and pre-operative27.73
Working capital margin70.50
Total1,207.52
Means of finance (₹ lakh)
Promoter's contribution (25%)301.88
Term loan from bank (75%)905.64
Cash credit limit (separate)211.48
Total project cost1,207.52

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments; lowest yearly DSCR 1.45. All figures are illustrative.

Butene-1 manufacturing process from raffinate-2

The sample unit recovers butene-1 from raffinate-2, the C4 stream left after a cracker or refinery has taken out butadiene and isobutene. Separation happens in seven steps, and most of the plant's energy goes into the two columns.

  1. Feed receipt

    Raffinate-2 arrives by pipeline or pressurised tanker and is held in bullets so the columns get a steady feed.

  2. Selective hydrogenation

    Traces of butadiene react with hydrogen over a palladium catalyst and turn into butenes, so they cannot reach the product.

  3. Lights removal

    The first superfractionation column takes isobutane and other light ends overhead.

  4. Butene-1 separation

    A second tall column lifts butene-1 overhead and leaves normal butane and 2-butenes at the bottom as a return stream.

  5. Purification

    Adsorbent guard beds strip water, oxygenates and sulphur down to parts-per-million levels that polymer catalysts can tolerate.

  6. Testing and storage

    Each lot is checked by gas chromatography for purity and stored as a pressurised liquid.

  7. Dispatch

    Butene-1 leaves in pressurised road tankers or by pipeline to the buyer's polymer plant.

Which process route suits a butene-1 project?

The right route depends on what feed you can secure, not on which technology is newest. Butene-1 boils within about a degree of isobutene, so plain distillation only works once isobutene has been removed upstream.

Main routes to polymer-grade butene-1
Ethylene dimerizationTwo ethylene molecules are joined over a homogeneous catalyst. It needs an ethylene supply, so it fits units inside a cracker complex. IndianOil's Panipat unit uses this route.
Raffinate-2 superfractionationButene-1 is separated from the C4 stream in two tall columns with high reflux. It suits a unit next to a refinery or cracker that sells raffinate-2. This is the route in our sample report.
Extractive distillation or adsorptionA solvent or adsorbent helps split close-boiling C4s. These variants can cut column height or energy, at the cost of solvent handling or adsorbent replacement.
What decides the choiceFeed availability and price, the butene-1 content of the C4 stream, steam cost for reboilers, and whether a polymer plant nearby will sign a term offtake.

Feedstock and raw materials for butene-1

Raffinate-2 makes up 90% of raw material cost in the sample, and raw materials are 53.3% of sales. Butene-1 is only part of the C4 stream, so the feed contract must state both the feed price and what the supplier pays for the butane and 2-butene return stream.

Raw materialShare of costYear 3 (₹ lakh)
Raffinate-2 C4 stream90%1,019.58
Hydrogen for selective hydrogenation3%33.99
Hydrogenation catalyst and adsorbents4%45.31
Process chemicals and nitrogen3%33.99
Total100%1,132.87

Year 3 purchases in our illustrative sample. Your report uses the volume, composition and price formula in your own supply offer.

Plant and machinery for a butene-1 unit

The superfractionation columns are the biggest single item, at about a third of machinery cost. Their height and tray count follow from the purity target and the butene-1 content of your feed.

EquipmentWhat it doesSample cost (₹ lakh)
Superfractionation columns with traysSplit butene-1 from close-boiling C4s191.67
Selective hydrogenation reactorConverts trace butadiene to butenes56.37
Reboilers, condensers and heat exchangersSupply the heat and reflux the columns need90.20
Pressurised storage bulletsHold feed and product as liquefied gas78.92
Adsorber driers and guard bedsRemove water, oxygenates and sulphur33.83
Process pumps and compressorsMove feed, reflux and product45.10
DCS and field instrumentationControls pressures, levels and column profiles39.46
Flare and safety systemsRelieve pressure safely during upsets28.19
Total plant and machinery563.74

Costs are the sample report's estimates for an 8.6 MT per day unit. Get licensor and fabricator quotations before you finalise.

Licences and approvals for a butene-1 plant

Butene-1 is a flammable gas stored as a pressurised liquid, so safety approvals take longer than for most chemical units. Start them alongside the project report, as of October 2026.

Pressure vessel storageLicence from PESO on Form LS-1A under the SMPV(U) Rules 2016 for storing liquefied flammable gas in vessels above 1,000 litres water capacity. The application needs layout drawings, P&ID and site plan; major installations also need HAZOP and risk analysis.
Environmental clearancePetrochemical processing units need prior environmental clearance under the EIA Notification 2006. Confirm the category with the State or central appraisal authority for your site.
Pollution board consentManufacture of petrochemicals is in the Red category, so consent to establish and consent to operate come from the State Pollution Control Board.
Hazardous chemicalsOn-site emergency plan and safety reporting under the Manufacture, Storage and Import of Hazardous Chemical Rules where storage crosses threshold quantities.
Factory and fireFactory licence for a hazardous process and fire NOC; rules vary by state.
Customs classificationHarmonized System subheading 2901.23 (butene and its isomers), used for GST invoicing and for import and export.

Butene-1 uses and market in India

Polyethylene plants are the main buyers. Butene-1 controls density in LLDPE and in some HDPE grades, which decides how tough and flexible packaging film and pipe will be. A polymer plant buys on a term contract and qualifies a supplier on purity, consistency and delivery, not on spot price.

  • Comonomer for LLDPE and HDPE
  • Polybutene-1 resins for pipes and films
  • Butylene oxide and butanone synthesis
  • Secondary butyl alcohol production
  • Valeraldehyde and amyl alcohol manufacture

Supply sits with a few crackers: IndianOil stopped importing butene-1 after commissioning its Panipat dimerization unit in May 2014, and began selling surplus in 2017. A new unit needs an anchor buyer before it needs a bank.

Mistakes that weaken a butene-1 project report

  • No firm feed agreement

    A report built on a hoped-for raffinate-2 supply cannot be appraised. Lenders want a signed term sheet with volume, composition and price formula.

  • Assuming the whole feed becomes product

    Only the butene-1 in the stream is recovered. If the return stream price is not settled, the yield and margin are overstated.

  • Ignoring isobutene in the feed

    Distillation cannot separate isobutene from butene-1. Feed with more isobutene than the buyer's limit gives off-spec product however tall the column.

  • Under-costing steam for the reboilers

    High-reflux columns use a lot of heat. Power and fuel is 6.2% of sales in the sample; a lower figure needs a cheap steam source to back it.

  • Skipping trace-impurity control

    Carbon monoxide, water or sulphur at a few ppm poison polymer catalysts and lead to rejected lots. Budget for guard beds and an on-line analyser.

How NPCS helps you plan a butene-1 plant

  • Route and capacity studyCompare dimerization and raffinate-2 recovery for your feed, site and target buyers.
  • Feed and offtake economicsModel feed price formulas, return stream value and term offtake terms.
  • Lender-ready project reportProjections, DSCR, sensitivity and working capital in the format your bank or board wants.
  • Approvals roadmapPESO, environmental clearance and pollution consent steps with plant layout inputs.

NPCS's client list records 269 assignments in specialty chemicals. The NPCS project team, led by founder Ajay Kumar Gupta, has prepared reports for chemical and petrochemical projects since 1994.

What's inside the butene-1 sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

19 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Find NPCS project reports in your budget

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Butene-1 project report: frequently asked questions

What is the cost of a butene-1 manufacturing plant in India?

Cost depends mostly on the route and scale. Our sample report models a compact 8.6 MT per day recovery unit at ₹1,208 lakh, with plant and machinery at ₹564 lakh. Cracker-linked dimerization units of 20,000 tonnes a year or more cost many times that. A project report for your site works out the cost from your feed, capacity and utilities.

How is butene-1 manufactured?

Butene-1 is made in two main ways. Ethylene dimerization joins two ethylene molecules over a homogeneous catalyst and suits plants inside an ethylene complex. Recovery from raffinate-2 separates butene-1 from a refinery or cracker C4 stream in tall superfractionation columns after butadiene is hydrogenated and isobutene is removed upstream. Your feed source decides the route.

What is butene-1 used for?

Most butene-1 is used as a comonomer in linear low density polyethylene (LLDPE) and in some HDPE grades, where it controls density and film toughness. Smaller volumes go into polybutene-1 resins for pipes and films, butylene oxide, butanone (MEK), secondary butyl alcohol, and valeraldehyde for amyl alcohol and plasticiser intermediates.

What purity of butene-1 do polyethylene producers need?

Polymer-grade butene-1 is usually sold at 99.5% purity or higher. Buyers also cap trace impurities such as butadiene, carbon monoxide, water, sulphur and oxygenates at parts-per-million levels, because these poison polymerisation catalysts. The buyer's specification sheet sets the exact limits, and a project report should size purification and testing to meet it.

Which licences are needed for a butene-1 plant?

The main one is a PESO licence on Form LS-1A under the SMPV(U) Rules 2016, because butene-1 is stored as a pressurised flammable liquid. You also need prior environmental clearance under the EIA Notification 2006 and Red category consent from the State Pollution Control Board. Factory, fire and hazardous chemical rules apply too, and details vary by state.

Is butene-1 production profitable?

In our illustrative sample, the unit earns an 18.6% return on investment in Year 3 and breaks even at 39.4% of capacity. It pays back in about 3.9 years with an average DSCR of 1.66. Real profit depends on the spread between butene-1 and the raffinate-2 price, the feed contract terms, steam cost and steady offtake by a polymer plant.

Is the butene-1 project report PDF sample free, and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report. Its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan or board approval, NPCS prepares a report for your own feed, capacity and location.

Sources and references

  1. Refineries: Technology with Ecology (Panipat butene-1 unit)Indian Oil Corporation Limited, checked Oct 2026
  2. Standard operating procedure for SMPV(U) Rules, 2016Petroleum and Explosives Safety Organisation, checked Oct 2026
  3. SMPV(U) Rules: frequently asked questionsPetroleum and Explosives Safety Organisation, checked Oct 2026
  4. List of industries under Red categoryDepartment of Environment and Forest, Government of Assam, checked Oct 2026
  5. Technical EIA guidance manual for petrochemical based processing industryMinistry of Environment and Forests, Government of India, checked Oct 2026
  6. Harmonized System heading 29.01: acyclic hydrocarbonsWorld Customs Organization, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different specialty chemicals project?

These are a few of the projects we advise on. NPCS's published client list records 269 specialty chemicals assignments, so tell us what you are planning.

Tell us your project

Recent specialty chemicals assignments

  • Iiconnic Apparels
    Comprehensive Project Report on SilicaPaurri Garhwal, 2026
  • Parul Industries
    Project Feasibility Report on Nicotine for industrial applicationsValsad, 2026
  • Rich Phytocare Private Limited
    Industrial Project Report on Potassium SchoeniteBodinayakanur, 2026
  • Lakshya Powertech Ltd
    Techno-Economic Project Study on Acoustic PanelsMumbai, 2026
  • Luxury Line Interiors & Furniture
    Project Feasibility Report on Precipitated Silica & Activated Carbon for Industrial ApplicHyderabad, 2026
  • Indian Potash Limited
    Techno-Economic Feasibility Report on Citric AcidCoimbatore, 2026
  • Cecilia Still
    Detailed Project Report on Tall Oil RosinsEurope, 2026
  • Taraka Pamidi
    Technical and Financial Feasibility Report on Silica-, 2025

Get a butene-1 project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Butene-1 Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free butene-1 sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Butene-1 sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.