WhatsApp us
Request a Quote

Project reports in Specialty Chemicals

Acetone Plant Project Report

Project cost, recovery process, machinery, licences and five-year profitability for an acetone plant, with a free sample report you can open right now.

Plant capacity
16 MT per day
Total project cost
₹1,290 lakh
Plant and machinery
₹622 lakh
Return on investment
34% (Year 3)
Break-even
31% of capacity
Payback period
About 2.7 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a acetone project report?

An acetone project report is a detailed project report (DPR) for a plant that makes or recovers acetone, the solvent also called propanone or dimethyl ketone. It sets out the process route, machinery, feedstock, licences, project cost, means of finance, five-year projections, DSCR and break-even that a lender or investor reviews before funding the plant.

Entrepreneurs, pharma groups and solvent traders use it to choose a route and raise a term loan; banks use it to test whether the plant can repay.

Also known as: acetone manufacturing project report, project report on acetone, acetone business plan, acetone recovery plant DPR.

Acetone manufacturing plant cost in India: the sample economics

Our sample report models a spent acetone recovery plant of 16 metric tonnes per day, running 330 days a year. It starts at 60% of capacity and reaches 80% in Year 5, selling recovered acetone at ₹68,900 per MT.

₹1,290 lakhTotal project cost
₹2,547 lakhSales in Year 3
₹434 lakhNet profit in Year 3
2.42Average DSCR
Cost of project (₹ lakh)
Land and site development117.11
Building and civil works304.33
Plant and machinery621.58
Other fixed assets89.20
Contingencies46.30
Preliminary and pre-operative29.46
Working capital margin82.23
Total1,290.21
Means of finance (₹ lakh)
Promoter's contribution (25%)322.55
Term loan from bank (75%)967.66
Cash credit limit (separate)246.70
Total project cost1,290.21

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments. The lowest yearly DSCR is 2.10. All figures are illustrative.

Acetone manufacturing process in a recovery plant

A recovery plant turns spent acetone from pharma and chemical units back into saleable solvent. Acetone boils at about 56°C, well below water, so distillation does most of the separation and the molecular sieve finishes the drying.

  1. Receipt and testing

    Each tanker or drum lot is run on a gas chromatograph for acetone, water and other solvents before unloading. The assay sets both the price paid and the expected yield.

  2. Pre-treatment

    The feed is filtered, neutralised with caustic soda lye and passed over activated carbon to take out acids, colour and odour that would otherwise carry into the product.

  3. Fractional distillation

    A packed column with a steam reboiler takes acetone off the top and leaves water and higher boiling solvents at the bottom as still residue.

  4. Dehydration

    Distilled acetone passes through molecular sieve beds that bring moisture down to the buyer's limit; the beds are regenerated in turns.

  5. Quality testing

    Every batch is checked for purity, water, acidity and residue on evaporation against IS 170 or the buyer's specification before release.

  6. Filling and dispatch

    Acetone is filled into drums or tankers under a nitrogen blanket in a flameproof area and held in a licensed solvent yard.

Which acetone route suits a new plant?

The route decides the scale, the feedstock and almost every number in the report. Most first projects are recovery plants, because synthesis is tied to phenol and to very large volumes.

Cumene processBenzene and propylene make cumene, which is oxidised and split into phenol and acetone. Acetone is the co-product, so the plant's economics follow phenol demand. Only viable as a large integrated complex.
Isopropyl alcohol dehydrogenationIsopropyl alcohol is passed over a catalyst at high temperature to give acetone and hydrogen. Simpler chemistry, but margins depend on the price gap between isopropyl alcohol and acetone.
Spent acetone recoverySpent solvent from pharma and chemical plants is neutralised, distilled and dried. Mid-size investment, no reaction section, and the route modelled in our sample report.
Fermentation (bio-acetone)Sugars or starch are fermented to acetone, butanol and ethanol. Historically important, but low yields keep it at pilot or niche scale today.

Raw materials for an acetone recovery plant

Spent acetone is almost all of the raw material bill, and raw materials are 45.6% of sales in the sample. Feed is bought on the gas chromatograph assay, so a lot with more water or mixed solvents should cost less per tonne.

Raw material cost in Year 3 of the sample
Raw materialShare of costYear 3 (₹ lakh)
Spent acetone from pharma and chemical plants88%1,021.12
Caustic soda lye for neutralisation4%46.41
Molecular sieve and drying media5%58.02
Activated carbon3%34.81
Total100%1,160.36

The sample holds 30 days of raw material stock and pays suppliers in 30 days.

Machinery for a 16 MT per day acetone plant

The packed distillation column with its reboiler is the largest machinery item in the sample. Everything that touches acetone vapour needs flameproof motors and fittings, which adds to the cost of standard equipment.

MachineWhat it doesSample cost (₹ lakh)
Solvent storage tanks with flame arrestersHold spent feed and finished acetone87.02
Feed pre-treatment and neutralisation vesselNeutralises acids and settles solids49.73
Packed fractionating column with reboilerSeparates acetone from water and heavier solvents174.04
Condensers and reflux systemCondenses overhead vapour and controls purity62.16
Molecular sieve dehydration unitRemoves the last traces of water62.16
Steam boiler, cooling tower and chilling plantHeat for the reboiler, cooling for condensers87.02
Nitrogen blanketing systemKeeps air out of tanks and filling lines31.08
Flameproof drum filling and weighing stationFills and weighs drums for dispatch31.08
Quality control lab with gas chromatographTests every feed lot and product batch37.29
Total plant and machinery621.58

Costs are the sample report's estimates. Get current quotations before you finalise.

Utilities and manpower for an acetone plant

Distillation is an energy business: steam goes in at the reboiler and the same heat has to be taken out at the condensers. Utilities and a trained shift team decide both yield and safety.

Power and fuel₹156.77 lakh in Year 3 of the sample, or 6.2% of sales, covering boiler fuel, chilling and pumps
SteamLow-pressure steam for the column reboiler and for regenerating the molecular sieve beds
Cooling and chillingCooling tower water for the main condenser and chilled water for the vent condenser, so acetone vapour is not lost to air
NitrogenFor blanketing tanks and purging lines before filling and maintenance
Manpower58 people in the sample, including 20 skilled operators, at a Year 1 wage bill of ₹131.28 lakh; the column runs round the clock in shifts
Safety systemsFlameproof electricals in solvent areas, earthing of tanks and drums against static, and fire protection sized for a Class A solvent store

Licences and approvals for an acetone plant

An acetone recovery plant handles a hazardous waste, a Class A solvent and a BIS-controlled product at once. Plan the licences into the pre-operative period, because the plant cannot receive feed or sell product without them.

Hazardous waste authorisationAuthorisation from the State Pollution Control Board under the Hazardous and Other Wastes Rules, 2016 to receive and recycle spent solvent
Pollution board consentConsent to establish and operate; expect the Red category, since CPCB lists organic chemicals manufacturing as Red and states such as Odisha also place hazardous waste reprocessing units in Red
BIS certificationLicence to IS 170 under the Acetone (Quality Control) Order, 2020, in force since 13 March 2024
PESO licenceStorage licence under the Petroleum Rules, 2002; acetone is on PESO's list of substances needing a licence
Hazardous chemical rulesAcetone is listed in Schedule 1 of the MSIHC Rules, 1989, which set safety, reporting and emergency plan duties
Business registrationUdyam and GST registration, a factory licence under state rules and a fire NOC from the local fire authority

Rules and thresholds vary by state and change over time. Confirm current requirements with each authority before you apply.

Market for recovered acetone in India

Pharma and API plants use acetone in large volumes as a reaction and crystallisation solvent, and they also generate most of the spent acetone a recovery unit buys. Paints, adhesives and cleaning uses take the rest.

Virgin acetone prices follow the phenol and cumene cycle. A recovery plant sells below virgin acetone, so its margin moves with the gap between spent and virgin prices rather than with the acetone price alone.

  • Pharmaceutical and API manufacturers
  • Paint, lacquer and thinner makers
  • Adhesive and resin producers
  • Solvent traders and distributors
  • Cosmetic and nail care formulators

Where a recovery plant wins: toll recovery. A pharma unit sends its spent acetone, pays a processing charge and takes back purified solvent, which gives the plant steady feed and less price risk.

Mistakes that weaken an acetone project report

  • Treating spent feed as pure acetone

    Feed carries water and other solvents. Output must be worked out from the assay of typical lots, not from the tonnes bought.

  • Selling at virgin acetone prices

    Recovered acetone sells at a discount. Using virgin rates overstates sales and DSCR, and lenders spot it.

  • No cost for still residue

    The column bottoms are hazardous waste that must go to an authorised disposal facility; leaving out that cost overstates profit.

  • One pharma client as the only feed source

    If that client changes its process or solvent, feed stops. Lenders look for supply agreements with several generators.

  • Ignoring licence lead times

    Hazardous waste authorisation, PESO and BIS approvals all come before the first sale, so the pre-operative period and interest during it must allow for them.

How NPCS helps you plan an acetone plant

  • Route and capacityCompare recovery and synthesis routes and size the plant to the feed you can secure.
  • Feed and yield modelBuild the material balance from your feed assays, including residue and losses.
  • Bank-ready project reportProjections, DSCR and working capital in the format your lender wants.
  • Licences and layoutPlant layout for solvent storage and the approvals list for your state.

NPCS's client list shows 269 project assignments in specialty chemicals, prepared by the NPCS project team led by founder Ajay Kumar Gupta.

What's inside the acetone sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

18 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Real NPCS acetone project reports

These are acetone project reports NPCS has prepared, with the plant capacity, total capital investment, rate of return and break-even worked out in each. Costs have moved since some were written, so we bring any of them up to date for your capacity and location.

Project reportPlant capacityTotal investmentRate of returnBreak-evenAction
Methyl isobutyl Ketone (MIBK)from Acetone166 MT/ Day₹58.81 crore27%54% Get this report

Figures as worked out in each NPCS report. Total investment includes plant and machinery, land and building, and working capital.

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Acetone project report: frequently asked questions

How much does it cost to set up an acetone plant in India?

It depends mostly on the route. Our sample report models a 16 MT per day spent acetone recovery plant at ₹1,290 lakh, including land, building and working capital margin. A smaller recovery unit of 4–6 MT per day needs an indicative ₹4–7 crore. Synthesis by the cumene process is far larger, because acetone comes out alongside phenol in an integrated complex.

What is the raw material for acetone?

Large plants make acetone from cumene, which is produced from benzene and propylene, and get phenol as the main co-product. Some plants dehydrogenate isopropyl alcohol. A recovery plant buys spent acetone from pharma and chemical units. In our sample report, spent acetone is 88% of raw material cost, with caustic lye, molecular sieve and activated carbon making up the rest.

Is an acetone recovery business profitable?

In our illustrative sample, a 16 MT per day recovery plant earns a 34% return on investment in Year 3. It breaks even at 31% of capacity and pays back in about 2.7 years. Real profit depends on the gap between spent and virgin acetone prices, the acetone content of each feed lot and how quickly you secure the BIS and PESO licences.

Do I need a licence to store acetone?

Yes. Acetone is on the PESO list of substances that need a licence under the Petroleum Rules, 2002. Its flash point is far below 23°C, which puts it in Petroleum Class A. It is also a listed hazardous chemical under the MSIHC Rules, 1989, so storage, safety reports and emergency plans follow those rules.

Is BIS certification mandatory for acetone?

Yes, as of October 2026. The Acetone (Quality Control) Order, 2020 requires acetone to conform to IS 170 and carry the BIS Standard Mark. After several extensions, the last amendment (S.O. 3299(E), July 2023) brought it into force on 13 March 2024. A recovery plant selling acetone in the open market needs a BIS licence before its first sale.

Which acetone manufacturing process is used in India?

Virgin acetone is made by the cumene process, where cumene is oxidised to cumene hydroperoxide and split into phenol and acetone. That route only works at very large scale. New entrepreneurs usually set up solvent recovery plants, which purify spent acetone from pharma units by neutralisation, fractional distillation and molecular sieve drying.

Is the sample report free and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report; its figures are representative and not based on a real project. It should not be submitted to a bank. For a loan, NPCS prepares a report for your own route, capacity, feed contracts and location.

Sources and references

  1. Acetone (Quality Control) Amendment Order, S.O. 3299(E), 21 July 2023Ministry of Chemicals and Fertilizers, Gazette of India, checked Oct 2026
  2. Quality control orders for chemicalsDepartment of Chemicals and Petrochemicals, checked Oct 2026
  3. List of petroleum products requiring a licencePetroleum and Explosives Safety Organisation (PESO), checked Oct 2026
  4. Manufacture, Storage and Import of Hazardous Chemicals (Amendment) Rules, 2000Ministry of Environment and Forests (gazette copy on FAOLEX), checked Oct 2026
  5. Hazardous waste management and authorisationTamil Nadu Pollution Control Board, checked Oct 2026
  6. Categorisation of industrial sectors under Red categoryState Pollution Control Board, Odisha, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different specialty chemicals project?

These are a few of the projects we advise on. NPCS's published client list records 269 specialty chemicals assignments, so tell us what you are planning.

Tell us your project

Recent specialty chemicals assignments

  • Iiconnic Apparels
    Comprehensive Project Report on SilicaPaurri Garhwal, 2026
  • Parul Industries
    Project Feasibility Report on Nicotine for industrial applicationsValsad, 2026
  • Rich Phytocare Private Limited
    Industrial Project Report on Potassium SchoeniteBodinayakanur, 2026
  • Lakshya Powertech Ltd
    Techno-Economic Project Study on Acoustic PanelsMumbai, 2026
  • Luxury Line Interiors & Furniture
    Project Feasibility Report on Precipitated Silica & Activated Carbon for Industrial ApplicHyderabad, 2026
  • Indian Potash Limited
    Techno-Economic Feasibility Report on Citric AcidCoimbatore, 2026
  • Cecilia Still
    Detailed Project Report on Tall Oil RosinsEurope, 2026
  • Taraka Pamidi
    Technical and Financial Feasibility Report on Silica-, 2025

Get a acetone project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Acetone Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free acetone sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Acetone sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp