SILICA FROM RICE HUSK ASH - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated during milling is mostly used as a fuel in the boilers for processing paddy, producing energy through direct combustion & or by gasification. The rice husk contains about 75% organic volatile matter & the balance 25% of the weight of this husk is converted into ash during the firing process, is known as rice husk ash (RHA). This RHA in tern contains around 85%–92% amorphous silica. Silica is one of the valuable inorganic chemical compounds. It can exist in gel, crystalline and amorphous forms. It is the most abundant material in the earth’s crust. Silica is the major constituent of rice husk ash. With such a large ash content & silica content in the ash it becomes economical to extract silica from the ash, which has wide market & also takes care of ash disposal. Precipitated Silica (also called particulate silica) is composed of aggregates of ultimate particles of colloidal size that have not become linked in massive gel network during the preparation process. It is an amorphous form of silica; the word amorphous denotes a lack or crystal structure, as defined by x-ray diffraction. Early interest in amorphous silica was purely academic. Amorphous silica can be broadly divided into three categories. Vitreous silica or glass made by fusing quartz, Silica made indicating either amorphous or crystalline silica with high speed neutrons & Micro amorphous silica. Micro amorphous silica includes sols, gels powders & porous glasses, all of which are composed of ultimate particles or structural units less than 1/um in diameter. These silica have high surface area, generally greater than 3m2/g. Micro amorphous silica can be further divided into micro particulate silica microscopic sheets & fibers & hydrated amorphous silica. .Gynogenic silica’s are formed at high temperature by condensation of SiO2 from the vapor phase, or at lower temperature by chemical reaction in the vapor phase followed, by condensation. Silica formed in an aqueous solution can occur as sols, gels or particles. A gel has a three-dimensional, Continuous structure, where as a sol is a stable dispersion of fine particles. Macroscopic particles are formed by aggregation of smaller particles from either a gel or so. Amorphous silica is precipitated from super saturated solution obtained by concentrating an under saturated solution a hot saturated solution, or generating Si(OH)4 of silica ester SiH4, SiS2, SiCl4 or Si. Precipitated Silica soluble silicate solutions are of fine controlled particle size & porous in nature. Precipitated silica powders have a more open structure with higher volume than dried pulverized gels. The physical & chemical properties or precipitated silica vary according to the manufacturing process. Ultimate & aggregate particle size in silica’s precipitated from solution can be varied by reinforcement & control of suspension pH, temperature & salt content. The particle size in gynogenic silica’s is controlled by combustion conditions. The surface area as determined by nitrogen adsorption is a function of particle size. USES AND APPLICATION Precipitated silica is used as filler for paper & rubber as a carrier & diluents for agricultural chemicals, as an anti caking agent, to control viscosity & thickness and as a cleansing agent in toothpastes & in cosmetics. Precipitated silica also finds its applications as anti caking agents in food industry & as thermal insulators. Precipitated silica is perhaps the best not black filler and reinforcing agent used in rubber industry especially for the production of silicon rubber. The distinguishing feature of the growth of precipitated silica industry in India is that it has classifiably flourished in the small-scale sector. Readily available new materials low capital investment & high rates of return offer a distinct advantage to the small-scale manufacturers to venture into this field. MARKET SURVEY Precipitated Silica is used as filler for paper & rubber as a carrier & diluents for agricultural chemicals, as an anti caking agent, to control viscosity & thickness and as molecular sieves. So, we can better understand the growing demand of precipitated silica by seeing the demand of the following industries.Silicon is a unique material. Its abundance is one of the reasons it is used for a wide range of purposes. One of the most important uses of silicon is as a core element of microchips. To manufacture microchips, the microelectronics industry requires silicon with an impurity level of 10–11. Since silicon forms a stable compound with oxygen (silicon oxide, SiO2), the deoxidization of silicon oxide needed to reach this high level of purity consumes a substantial amount of energy, which, in turn, affects the environment through emissions of carbon dioxide (CO2).Bulk silicon wafers used at the beginning of the integrated circuit making process must first be refined to "nine nines" purity (99.9999999%), a process which requires repeated applications of refining technology. The silicon demand by the PV cell industry can be estimated using the available amount of silicon in combination with the amount of silicon needed to produce 1 MWp of solar cells. Global production of rice, the majority of which is grown in Asia is approximately 550 million tonnes/year. This is generated at a rate of about 20% of the weight of the product rice, or some 110 million tonnes per year globally. The husk in turn contains between 15 and 20% of mineral matter the majority of which is amorphous silica. There is a growing demand for finely divided amorphous silica in the production of high strength, low permeability concrete, for use in bridges, marine environments, and nuclear power plants. This market is currently filled by silica fume. Limited supply and high demand has pushed the price of silica fume to as much as US$ 1,000/tonne in some market. Rice husk has the potential to generate 16.5 to 22 million tonnes of ash containing over 90% amorphous silica that could be used as a substitute for silica fume. The husk has energy content of about 14 GJ/tonne so that the energy potential worldwide would be some 1.5 billion GJ/year, which at US$ 5/GJ would have an annual value of US$ 7.5 billion. This amount of energy is equivalent to over 1 billion barrels of oil per year. PRESENT MANUFACTURERS Anand Engineers Pvt. Ltd. Anand Lubricants Pvt. Ltd. Camco Multi Metal Ltd. Elofic Industries Ltd.

Plant capacity Plant & machinery Working capital Cost of Project T.C.I Return Break even
20 MT/Day Rs. 518 Lakhs - Cost of Project: Rs. 832 Lakhs 24.91% 48.13%

Introduction

We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.

Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary & Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** Total ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
  ********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
PARTICULARS EXISTING PROPOSED TOTAL
COST OF PROJECT      
Land & Site Development Exp.      
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
  ********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
  ********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
  ********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
  ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
  ********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PARTICULARS STK.PRD. STK.PRD.   OPERATING YEARS
  1st Year 2nd Yr &+   1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS       ********** ********** ********** ********** **********
Stocks on Hand       ********** ********** ********** ********** **********
Raw Material Cost       ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
  ********** **********   ********** ********** ********** ********** **********
Total       ********** ********** ********** ********** **********
Cash/Bank Balances       ********** ********** ********** ********** **********
Gross Wkg. Capital       ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
    1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales            
Gross Profit   ********** ********** ********** ********** **********
% Of G.P. to Net Sales   ********** ********** ********** ********** **********
Net Profit Before Taxes   ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales   ********** ********** ********** ********** **********
Net Profit After Taxes   ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales   ********** ********** ********** ********** **********
             
Debt Service Coverage Ratio   ********** ********** ********** ********** **********
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations            
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative)   ********** ********** ********** ********** **********
D. S. C. R. (Overall)   ********** ********** ********** ********** **********
             
Parameters            
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital exclUnsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering            
I.E.Total Term Lia./NW            
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** ********** **********
Total Outside Lia./NW   ********** ********** ********** ********** **********
Assets Turnover Ratio (x)   ********** ********** ********** ********** **********
             
No. of Shares of 10.00 each   ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in)   ********** ********** ********** ********** **********
Proposed divident   ********** ********** ********** ********** **********
Cash EPS (in)   ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in)   ********** ********** ********** ********** **********
Payout Ratio (%Age)   ********** ********** ********** ********** **********
Retained Earnings/Share (in)   ********** ********** ********** ********** **********
Retained Earnings (%Age)   ********** ********** ********** ********** **********
Book Value Per Share (in)   ********** ********** ********** ********** **********
Debt Per Share (in)   ********** ********** ********** ********** **********
Probable Mkt. Price/Share(in)   ********** ********** ********** ********** **********
Price / Book Value (x)   ********** ********** ********** ********** **********
Price Earnings Ratio (x)   ********** ********** ********** ********** **********
Yield (%Age)   ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
  Ratio 1-2 2-3 3-4 4-5 5-6
             
BREAK EVEN ANALYSIS            
Total Value of Output   ********** ********** ********** ********** **********
             
Variable Cost & Expenses            
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total   ********** ********** ********** ********** **********
Less: W.I.P. Adjustments   ********** ********** ********** ********** **********
Total Variable Cost   ********** ********** ********** ********** **********
Net Contribution   ********** ********** ********** ********** **********
Profit Volume Ratio (%)   ********** ********** ********** ********** **********
             
Semi-Var./Semi-Fixed Exp. ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** ********** **********
             
Fixed Expenses / Cost ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** ********** **********
             
Cash Break Even Sales ********** ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** ********** **********
             
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)            
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
MEANS OF FINANCE      
Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
  ********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
  ********** ********** **********
Total Means of Finance ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
           
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
ASSETS ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK  
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.  
F Rate of Interest(General) xxxx% p.a.
G Rate of Interest(Initial) 0.00% p.a.
H Apply Gen. Int. Rate from Year x Quarter :: x  
I Interest Calculation Quarterly  
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations   ********** ********** ********** ********** **********
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) .....   ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........   ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building Office Buildings Plant & Machinery Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures  
1-2 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
       
Type A :: Buildings      
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
       
Type C      
Office Vehicles WDV ********** **********
       
Type D :: Misc. Fixed Assets      
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
       
Type B :: Plant & Machineries      
Projected Pay Back Period
Particulars Operating Years
  1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********        
Total Initial Investment *********        
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months    
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV *********   *********
IRR *********   *********
       

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Introduction

  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications

Market Study and Assessment

  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity

Raw Material

  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers

Personnel (Manpower) Requirements

  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery

  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances &Equipments
  • Laboratory Equipments& Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations

  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram

Infrastructure and Utilities

  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
  • Assumptions for Profitability workings
  • Plant Economics
  • Production Schedule
  • Land & Building
    Factory Land & Building
    Site Development Expenses
  • Plant & Machinery
    Indigenous Machineries
    Other Machineries (Miscellaneous, Laboratory etc.)
  • Other Fixed Assets
    Furniture & Fixtures
    Pre-operative and Preliminary Expenses
    Technical Knowhow
    Provision of Contingencies
  • Working Capital Requirement Per Month
    Raw Material
    Packing Material
    Lab & ETP Chemical Cost
    Consumable Store
  • Overheads Required Per Month And Per Annum
    Utilities & Overheads (Power, Water and Fuel Expenses etc.)
    Royalty and Other Charges
    Selling and Distribution Expenses
  • Salary and Wages
  • Turnover Per Annum
  • Share Capital
    Equity Capital
    Preference Share Capital
  • Annexure 1:: Cost of Project and Means of Finance
  • Annexure 2:: Profitability and Net Cash Accruals
    Revenue/Income/Realisation
    Expenses/Cost of Products/Services/Items
    Gross Profit
    Financial Charges
    Total Cost of Sales
    Net Profit After Taxes
    Net Cash Accruals
  • Annexure 3 :: Assessment of Working Capital requirements
    Current Assets
    Gross Working. Capital
    Current Liabilities
    Net Working Capital
    Working Note for Calculation of Work-in-process
  • Annexure 4 :: Sources and Disposition of Funds
  • Annexure 5 :: Projected Balance Sheets
    ROI (Average of Fixed Assets)
    RONW (Average of Share Capital)
    ROI (Average of Total Assets)
  • Annexure 6 :: Profitability ratios
    D.S.C.R
    Earnings Per Share (EPS)
  • Debt Equity Ratio
  • Annexure 7 :: Break-Even Analysis
    Variable Cost & Expenses
    Semi-Var./Semi-Fixed Exp.
    Profit Volume Ratio (PVR)
    Fixed Expenses / Cost
    B.E.P
  • Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
    Resultant N.P.B.T
    Resultant D.S.C.R
    Resultant PV Ratio
    Resultant DER
    Resultant ROI
    Resultant BEP
  • Annexure 12 :: Shareholding Pattern and Stake Status
    Equity Capital
    Preference Share Capital
  • Annexure 13 :: Quantitative Details-Output/Sales/Stocks
    Determined Capacity P.A of Products/Services
    Achievable Efficiency/Yield % of Products/Services/Items
    Net Usable Load/Capacity of Products/Services/Items
    Expected Sales/ Revenue/ Income of Products/ Services/ Items
  • Annexure 14 :: Product wise domestic Sales Realisation
  • Annexure 15 :: Total Raw Material Cost
  • Annexure 16 :: Raw Material Cost per unit
  • Annexure 17 :: Total Lab & ETP Chemical Cost
  • Annexure 18 :: Consumables, Store etc.,
  • Annexure 19 :: Packing Material Cost
  • Annexure 20 :: Packing Material Cost Per Unit
  • Annexure 21 :: Employees Expenses
  • Annexure 22 :: Fuel Expenses
  • Annexure 23 :: Power/Electricity Expenses
  • Annexure 24 :: Royalty & Other Charges
  • Annexure 25 :: Repairs & Maintenance Exp.
  • Annexure 26 :: Other Mfg. Expenses
  • Annexure 27 :: Administration Expenses
  • Annexure 28 :: Selling Expenses
  • Annexure 29 :: Depreciation Charges – as per Books (Total)
  • Annexure 30 :: Depreciation Charges – as per Books (P & M)
  • Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
  • Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
  • Annexure 33 :: Interest and Repayment - Term Loans
  • Annexure 34 :: Tax on Profits
  • Annexure 35 ::Projected Pay-Back Period And IRR
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.