WhatsApp us
Request a Quote

Project reports in Specialty Chemicals

Biogas Plant Project Report

Project cost, digesters, upgrading machinery, feedstock and five-year profitability for a compressed biogas (CBG) plant, with a free sample biogas project report PDF.

Plant capacity
2,200 kg per day
Total project cost
₹694 lakh
Plant and machinery
₹387 lakh
Return on investment
16% (Year 3)
Break-even
37% of capacity
Payback period
About 4.1 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a biogas project report?

A biogas project report is a detailed project report (DPR) for a plant that digests press mud, cattle dung or crop residue, cleans the gas and compresses it as CBG. It covers feedstock, process, machinery, offtake price, project cost, means of finance, five-year projections, DSCR and break-even.

Promoters use it to size the plant, sign an offtake agreement and apply for a term loan and capital assistance; lenders use it to test whether gas sales can repay the loan.

Also known as: CBG plant project report, compressed biogas DPR, Bio-CNG plant project report, biogas business plan, project report on biogas.

Biogas manufacturing plant cost in India: sample economics

The sample report models a CBG plant of 2,200 kg per day running 330 days a year, starting at 60% of capacity and reaching 80% in Year 5. Gas is sold at ₹104 per kg, close to the administered price of about ₹105 per kg announced in August 2026.

₹694 lakhTotal project cost
₹529 lakhSales in Year 3
₹111 lakhNet profit in Year 3
1.56Average DSCR
Cost of project (₹ lakh)
Land and site development43.18
Building and civil works145.09
Plant and machinery386.59
Other fixed assets59.38
Contingencies26.58
Preliminary and pre-operative16.52
Working capital margin16.16
Total693.50
Means of finance (₹ lakh)
Promoter's contribution (25%)173.38
Term loan from bank (75%)520.12
Cash credit limit (separate)48.47
Total project cost693.50

Working capital is small for a gas plant. The margin is only ₹16.16 lakh, because CBG is not stored for long and oil companies settle bills on agreed cycles. Plant and machinery is more than half the project cost, so equipment quotes decide whether the numbers hold.

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments. The sample counts gas sales only, with no capital assistance and no manure income. All figures are illustrative.

Biogas manufacturing process, from feedstock to CBG

Biogas is made by bacteria, not machines, so the process is built around keeping the digester stable. Raw biogas is roughly half methane; CBG must be over 90% methane and compressed to 250 bar before an oil company accepts it.

  1. Feedstock pre-treatment

    Press mud, dung and shredded straw are mixed with recycled water into a slurry that pumps easily and feeds the digester at a steady rate.

  2. Anaerobic digestion

    The slurry stays 25–35 days in heated, stirred tanks at about 37°C, where bacteria break it down into raw biogas of 50–60% methane.

  3. Gas storage and cleaning

    Raw gas collects in a membrane gas holder, then a scrubber removes hydrogen sulphide and moisture that would corrode the compressor.

  4. Upgrading

    A VPSA or water scrubbing unit strips out carbon dioxide and lifts methane above 90%, the level set by IS 16087:2016 for CBG.

  5. Compression and filling

    Clean gas is compressed to 250 bar and filled into cascades for CNG stations, or fed into a city gas pipeline where one is close.

  6. Digestate processing

    The spent slurry passes through a screw press. The solid becomes fermented organic manure (FOM) and most of the liquid goes back to the pre-mix tank.

Which biogas upgrading technology should you choose?

Upgrading is the second most expensive item in the sample plant, and it sets how much methane you lose. The choice depends on plant size, water and power cost, and how strict the buyer is on gas quality.

Main upgrading routes used in Indian CBG plants
Water scrubbingCarbon dioxide dissolves in water under pressure. Simple to run and tolerant of some hydrogen sulphide, but it needs a reliable water supply and a cooling tower.
VPSA (vacuum pressure swing adsorption)Carbon dioxide is held on an adsorbent bed and released under vacuum. Dry process, compact and common at 1–10 tonnes per day; hydrogen sulphide must be removed first.
Membrane separationGas passes through polymer membranes that let carbon dioxide through faster than methane. Modular and easy to expand; multi-stage units are used to keep methane loss low.
Amine scrubbingA chemical solvent absorbs carbon dioxide, giving very low methane loss. Needs heat to regenerate the solvent, so it suits larger plants with spare heat.

Ask suppliers for guaranteed methane purity, methane slip and power use per cubic metre, and compare them on the same basis.

Raw materials for a biogas plant

Feedstock is 25.9% of sales in the sample, a much smaller share than in most chemical plants, but it is the item that most often stops a CBG plant. The sample mixes press mud, dung and straw so the digester keeps running when one source dries up.

Feedstock or inputShare of costYear 3 (₹ lakh)
Press mud from sugar mills50%68.45
Cattle dung25%34.23
Paddy straw or other crop residue20%27.38
Desulphurisation media and process chemicals5%6.85
Total100%136.91

Yields differ widely. Indicatively, a tonne of press mud gives about 35–45 kg of CBG and a tonne of fresh cattle dung about 18–25 kg, so a dung-only plant needs roughly twice the tonnage. Press mud comes only in the cane crushing season, roughly November to April, so you need covered storage or a second feedstock for the rest of the year.

Machinery for a CBG plant

EquipmentWhat it doesSample cost (₹ lakh)
Feedstock receiving, shredding and pre-mixingSizes straw and blends the slurry46.39
CSTR digesters with agitators and heatingHold and stir the slurry while gas forms115.98
Membrane gas holder and blowerStores raw gas and evens out flow23.20
Purification and upgrading unitRemoves CO₂ to reach CBG grade85.05
CBG compressor, 250 barCompresses gas for cascades38.66
Cascades and filling stationCarry gas to CNG stations23.19
Screw press digestate separatorSeparates solid manure from liquid23.19
Flare, electricals, instruments, SCADASafety flaring, control and remote data30.93
Total plant and machinery386.59

The digesters are the largest single item in the sample. SCADA or remote monitoring is listed because government capital assistance has required plant data to be shared online. Get current quotations before you finalise.

Licences and approvals for a biogas plant

A CBG plant handles a flammable gas at high pressure, so it needs more approvals than a typical process unit. Oil company documents list these as the main ones.

Business registrationUdyam (MSME) and GST registration, plus registration on the GOBARdhan Unified Registration Portal, which is needed to claim Ministry of Petroleum and Natural Gas benefits
PESOApproval from the Petroleum and Explosives Safety Organisation for compressing and storing CBG at up to 250 bar; oil companies treat it as mandatory
Gas qualityCBG must meet BIS standard IS 16087:2016, which is similar to the CNG standard
Pollution board consentConsent to establish and consent to operate from the State Pollution Control Board; confirm the category with your state board
Land and local bodyLand approved for commercial or industrial use, building plan approval and panchayat or municipal NOC
Fire safetyFire NOC for the gas holder, compressor and cascade area
Organic manureSolid and liquid FOM sold as fertiliser must meet the specifications in Schedule IV of the Fertiliser (Control) Order

Market for compressed biogas: who buys your gas

Most CBG is sold under long-term offtake agreements, not in an open market. Oil marketing companies buy it under SATAT and sell it at their CNG stations, and Indian Oil's standard agreement runs for 15 years.

City gas distribution companies are a second buyer, because they must blend CBG into CNG and piped gas: 3% in 2026-27, 4% in 2027-28 and 5% from 2028-29. As of August 2026, 217 CBG plants were commissioned and 339 were under construction, according to the Press Information Bureau.

  • Oil marketing companies under SATAT
  • City gas distribution companies meeting the blending obligation
  • Industrial units replacing LPG or natural gas for heating
  • Fertiliser companies and farmers buying fermented organic manure

Manure is the second income: a CBG plant produces far more digestate than gas by weight. Fertiliser companies have marketed FOM with government market development assistance of ₹1,500 per tonne, but the sample counts no manure income, so treat it as upside until a buyer is signed.

Subsidy, offtake price and loans for a CBG plant

GOBARdhan capital assistance

Up to ₹2 crore per tonne per day

For new CBG capacity and expansions, from 2026-27 to 2035-36. Also covers feedstock aggregation and manure processing assets.

Administered CBG price

₹2,110 per MMBtu, about ₹105 per kg

Set by the petroleum ministry in 2026 with a horizon of at least ten years. Lenders read this as the revenue line.

Term loan with credit guarantee

Guarantee up to 85% for eligible MSMEs

Banks lend against the offtake agreement and project report; the guarantee covers part of the lender's risk on eligible loans.

MNRE's earlier Waste to Energy assistance (₹4 crore per 4,800 kg per day, up to ₹10 crore) closed to applications on 31 December 2025. Scheme terms change, so confirm current rules on the GOBARdhan portal before applying.

Mistakes that weaken a biogas project report

  • No written feedstock contracts

    A report that assumes press mud or straw "is available locally" fails credit review. Lenders want supply agreements, distances and a storage plan for the off-season.

  • Full output from the first month

    Digesters take weeks to build up a stable bacterial population. Year 1 should start well below rated capacity.

  • Counting subsidy as day-one funding

    Capital assistance has been released only after performance tests, and paid in part if output is low. The loan must cover the gap until it arrives.

  • Booking manure sales without a buyer

    FOM needs testing, bagging and a marketing tie-up. Without one, its revenue should be left out of the DSCR.

  • Using laboratory gas yields

    Yields from a lab test of fresh feedstock are higher than a plant achieves on stored material. Use a pilot or plant-scale figure.

How NPCS helps you set up a biogas plant

  • Feedstock and capacitySize the plant to the press mud, dung or straw you can secure within a practical radius.
  • Technology and suppliersCompare digester and upgrading options and get comparable quotations.
  • Bank-ready project reportProjections, DSCR and sensitivity on feedstock cost and gas price, in the format your lender wants.
  • Schemes and approvalsThe GOBARdhan, PESO and pollution board documents your project needs, in order.

NPCS's client list includes 269 assignments in specialty chemicals, and the NPCS project team has prepared project reports and feasibility studies for entrepreneurs, banks and companies since 1994.

What's inside the biogas sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

18 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Real NPCS biogas project reports

These are biogas project reports NPCS has prepared, with the plant capacity, total capital investment, rate of return and break-even worked out in each. Costs have moved since some were written, so we bring any of them up to date for your capacity and location.

Project reportPlant capacityTotal investmentRate of returnBreak-evenAction
Biogas450 KGS/day₹29 lakh40%35% Get this report
Compressed Biogas1200 MT/Annum₹4.47 crore43%33% Get this report
Compressed BiogasCompressed Bio Gas , 6 MT Per Day Spent Slurry as Manure, 60 MT Per Day₹5.22 crore27%46% Get this report
Biogas Power Plant from Cow Dung1000 KWh or 1 MWh₹12.45 crore22%45% Get this report
Dairy Farming, Milk Products With Cow Urine Processing and Biogas Plant - Cattle Breeding Farm, Fodder…On request₹16.65 crore47%32% Get this report

Figures as worked out in each NPCS report. Total investment includes plant and machinery, land and building, and working capital.

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Biogas project report: frequently asked questions

How much does it cost to set up a biogas (CBG) plant in India?

A CBG plant of 1–3 tonnes per day usually needs about ₹6–15 crore, and a 5–10 tonne plant about ₹20–50 crore, depending on feedstock, digester type and land. These are indicative ranges. Our sample report models a 2,200 kg per day plant at ₹694 lakh, of which plant and machinery is ₹387 lakh.

Is a compressed biogas plant profitable?

It can be, when feedstock is secured at a steady cost and the plant runs close to rated output. In our illustrative sample, a 2,200 kg per day plant earns a 16% return on investment in Year 3, breaks even at 37% of capacity and pays back in about 4.1 years. Weak feedstock supply is the most common reason plants underperform.

What price do oil companies pay for CBG?

As of August 2026, the Ministry of Petroleum and Natural Gas has set an administered CBG price of ₹2,110 per MMBtu, which the government equates to about ₹105 per kg, with a horizon of at least ten years. The earlier SATAT price was linked to CNG retail prices. Check the rate and delivery terms in your offtake agreement.

Which raw material is best for a biogas plant?

Press mud from sugar mills gives one of the highest gas yields per tonne and needs little pre-treatment, but it is available mainly in the crushing season. Cattle dung is steady but low in yield. Paddy straw yields well on a dry basis but needs shredding, pre-treatment and longer digestion. Most plants mix two or three feedstocks to keep gas output steady.

What subsidy is available for a CBG plant?

The GOBARdhan scheme approved in August 2026 offers capital assistance of up to ₹2 crore per tonne per day of new CBG capacity, from 2026-27 to 2035-36, plus a credit guarantee of up to 85% for eligible MSME projects. Registration on the GOBARdhan Unified Registration Portal is required. Confirm current terms before you apply.

Biogas plant ka business kaise shuru kare?

Start with feedstock: tie up press mud, dung or straw within about 25–30 km and test its gas yield. Then size the plant, get an offtake letter from an oil or gas company, register on the GOBARdhan portal and get a project report for your bank. Land, pollution consent and PESO approvals follow before construction.

Is the sample report free and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report; its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, feedstock, location and offtake terms.

Sources and references

  1. GOBARdhan: Fuelling Clean Energy and Rural Growth (backgrounder, 6 August 2026)Press Information Bureau, Government of India, checked Oct 2026
  2. Frequently asked questions on CBGIndian Oil Corporation Ltd, checked Oct 2026
  3. SATAT initiativeBharat Petroleum Corporation Ltd, checked Oct 2026
  4. Waste to Energy Programme: revised guidelines (November 2022)Ministry of New and Renewable Energy, checked Oct 2026
  5. Lok Sabha unstarred question 3055: CBG blending obligation (21 December 2023)Ministry of Petroleum and Natural Gas, via Lok Sabha Digital Library, checked Oct 2026
  6. Fertiliser (Inorganic, Organic or Mixed) (Control) (Sixth) Amendment Order, 2023Ministry of Agriculture and Farmers Welfare, Gazette of India, checked Oct 2026
  7. GOBARdhan Unified Registration Portal: benefitsDepartment of Drinking Water and Sanitation, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different specialty chemicals project?

These are a few of the projects we advise on. NPCS's published client list records 269 specialty chemicals assignments, so tell us what you are planning.

Tell us your project

Recent specialty chemicals assignments

  • Iiconnic Apparels
    Comprehensive Project Report on SilicaPaurri Garhwal, 2026
  • Parul Industries
    Project Feasibility Report on Nicotine for industrial applicationsValsad, 2026
  • Rich Phytocare Private Limited
    Industrial Project Report on Potassium SchoeniteBodinayakanur, 2026
  • Lakshya Powertech Ltd
    Techno-Economic Project Study on Acoustic PanelsMumbai, 2026
  • Luxury Line Interiors & Furniture
    Project Feasibility Report on Precipitated Silica & Activated Carbon for Industrial ApplicHyderabad, 2026
  • Indian Potash Limited
    Techno-Economic Feasibility Report on Citric AcidCoimbatore, 2026
  • Cecilia Still
    Detailed Project Report on Tall Oil RosinsEurope, 2026
  • Taraka Pamidi
    Technical and Financial Feasibility Report on Silica-, 2025

Get a biogas project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Biogas Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free biogas sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Biogas sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp