Solar panel market in India at a glance
The solar panel market in India covers photovoltaic modules and the cells inside them, sold to solar parks, rooftops, farm pumps and export buyers. Three research firms put it at ₹77,150 crore to ₹1.02 lakh crore, for base years 2024 to 2026. Installed solar capacity reached about 175 GW by October 2026.
Module makers, developers, lenders and investors in cell or wafer plants follow it, because new rules on Indian-made cells now decide who can supply most projects.
Also searched as: solar module market in India, solar PV market in India, solar energy market size in India, solar module manufacturing capacity in India, solar tracker market.
How big is the solar panel market in India?
No ministry publishes a rupee value for solar panel sales. Three research firms do, but each uses a different year and a slightly different product scope.
| Publisher and base year | Estimate | Forecast |
|---|---|---|
| Research firm B[11]2026, solar PV modules only; 2026 value, not a base-year actual | USD 10,689.2 millionabout ₹1.02 lakh crore | USD 23,719.1 million by 2033CAGR 12.1% (2026 to 2033) |
| Research firm A[12]2025, solar panels by type, end use and region; price basis not stated on the free page | USD 9 billionabout ₹85,720 crore | USD 46.9 billion by 2034CAGR 19.5% (2026 to 2034) |
| Research firm C[13]2024, solar panels by type, technology and system design; page gives two different forecast windows | USD 8.1 billionabout ₹77,150 crore | USD 26.4 billion by 2035CAGR 11.5% (2025 to 2035) |
Estimates are published by independent research firms and rating agencies and are not NPCS figures. Rupee equivalents of USD figures use ₹95.25 per USD (6 Nov 2026) and are shown only for comparison.
Why the estimates differ: Research firm B's USD 10,689.2 million is for 2026 and covers PV modules only. Research firms A and C give 2025 and 2024 values for solar panels, so part of the gap is growth between those years. None of the free pages shows its method, price basis or whether exports are counted.
Research firm A estimates USD 9 billion for 2025 and projects USD 46.9 billion by 2034. Research firm C puts 2024 at USD 8.1 billion and expects USD 26.4 billion by 2035.
The growth rates in these forecasts run from 11.5% to 19.5% a year. Use them as a spread of opinion, and test any sales plan against the official capacity data in the next section.
How much solar power and factory capacity does India have?
The government tracks two series that matter to panel makers. One is solar power installed on the grid; the other is module, cell and wafer capacity listed by the Ministry of New and Renewable Energy.
| Measure | Period | Value |
|---|---|---|
| Module manufacturing capacity listed in ALMM List-I[2] | Mar 2023 | 22 GW |
| Cell manufacturing capacity in the first ALMM List-II[2] | Jul 2025 | 13 GW |
| Solar module manufacturing capacity[6] | Mar 2026 | 172 GW |
| Installed solar power capacity in India[6] | Mar 2026 | 150.3 GW |
| Module manufacturing capacity listed in ALMM List-I[2] | Aug 2026 | 213 GW |
| Cell manufacturing capacity listed in ALMM List-II[2] | Aug 2026 | 32 GW |
| Installed ingot and wafer manufacturing capacity[2] | Aug 2026 | 2 GW |
| Installed solar power capacity in India[7] | Oct 2026 | 175 GW |
Installed solar reached about 175 GW by October 2026, according to PIB. The record 44.61 GW added in 2025-26 is the best single guide to how many panels India now installs in a year.
Factory capacity has grown even faster. Module capacity on the Approved List of Models and Manufacturers (ALMM) went from about 22 GW in March 2023 to about 213 GW in August 2026.
The stages before the module are far smaller. Listed cell capacity was about 32 GW and ingot and wafer capacity about 2 GW, so module lines far outnumber the cells India can make.
ALMM figures are nameplate capacity enlisted by the ministry, not output. A listed plant can run well below its rated capacity.
Where do solar panels go in India?
Official data split installed solar into three uses. Each one buys panels in its own way, which shapes how a maker sells.
- Utility-scale plants: Large ground-mounted projects and solar parks held 125.60 GW of installed capacity in June 2026, the bulk of panel demand.[3]
- Rooftop solar: Rooftop systems held 30.11 GW in June 2026. PM Surya Ghar alone had commissioned 19.1 GW for 65.26 lakh households by October 2026.[3][7]
- Solar pumps and off-grid: Off-grid systems held 6.43 GW in June 2026, and PM-KUSUM added 7.6 GW of farm solar in 2025-26.[3][6]
Utility-scale developers buy in large lots through tenders. They compare price per watt, efficiency and warranty terms, and they deal directly with a handful of large makers.
Rooftop buyers are homes, shops and factories, reached through installers and distributors. PM Surya Ghar has made home rooftops a steady channel, with 19.1 GW commissioned under the scheme so far, according to PIB.
Farm pumps and off-grid systems are smaller and spread across villages. For a supplier, service and distribution count for more here than factory scale.
Who are the main solar panel makers in India?
The largest module makers are now also building cell lines, because listed cells decide which modules qualify for most projects. The table gives one sourced detail for each company.
| Company | What it does | Listed |
|---|---|---|
| Waaree Energies[4][10] | 25.8 GW of module capacity (1.6 GW in the USA) and 5.4 GW of cells; won 6,000 MW under PLI Tranche-II | Yes |
| Premier Energies[8] | Commissioned a 7 GW TOPCon cell line in the September 2026 quarter | Yes |
| TP Solar (Tata Power)[4][9] | 4.3 GW cell and module plant at Tirunelveli; made 2 GW of modules from April to September 2026; won 4,000 MW under PLI | Yes |
| Reliance New Solar Energy[4] | Won 6,000 MW of polysilicon-to-module capacity under PLI Tranche-II | Yes |
| ReNew Solar[4] | Won 4,800 MW of wafer-to-module capacity under PLI Tranche-II | No |
| Vikram Solar[4] | Won 2,400 MW of cell and module capacity under PLI Tranche-II | Yes |
Waaree Energies has the largest module base in this list, at 25.8 GW. Premier Energies and TP Solar have put their recent effort into cell lines that feed their own modules.
The PLI awards show who is moving further up the chain. Reliance won 6,000 MW of capacity that starts from polysilicon, and ReNew won 4,800 MW that starts from wafers.
PLI figures are capacities awarded under Tranche-II of the scheme. An award is not the same as a running plant.
Which policies shape solar panel demand and supply?
Indian rules now decide both who buys panels and where the cells inside them come from. Five measures do most of the work.
| ALMM List-I and List-II[1][2]Jun 2026 | Projects under ALMM must use listed modules and, from 1 June 2026, modules made with listed cells |
|---|---|
| PLI scheme for high efficiency solar PV modules[2] | Letters of award for 48,337 MW of integrated capacity; about ₹73,400 crore invested by June 2026 |
| PM Surya Ghar: Muft Bijli Yojana[7]Feb 2024 | ₹75,021 crore outlay for rooftop solar on 1 crore homes |
| Basic Customs Duty[5] | Duty on imported solar cells and modules, which favours domestic supply |
| PM Surya Sarovar Yojana[7]Jul 2026 | ₹5,070 crore outlay for floating solar on water bodies |
ALMM List-II is the biggest change for makers. Since 1 June 2026, projects under ALMM must use modules built with listed cells, so cell capacity now caps the supply of compliant modules.
For anyone planning a new plant, this tilts the case towards integrated units. A plant that only assembles modules has to compete for a limited pool of listed cells.
Is India still importing solar panels?
Far less than before. Ministry replies in the Lok Sabha, based on Department of Commerce data, show module imports falling and exports rising.
| Measure | Period | Value |
|---|---|---|
| Solar module exports from India[5] | FY 2021-22 | USD 83 million |
| Solar module exports from India[5] | FY 2025-26 | USD 1,051 million |
| Solar module imports into India[2] | FY 2021-22 | USD 3,363 million |
| Solar module imports into India[3] | FY 2023-24 | USD 4,354 million |
| Solar module imports into India[2] | FY 2025-26 | USD 994 million |
Module imports were about USD 4,354 million in 2023-24 and fell to about USD 994 million in 2025-26, according to the ministry. The same data show exports growing from about USD 83 million in 2021-22 to about USD 1,051 million.
A turning point: in 2025-26, module exports of about USD 1,051 million were worth more than module imports of about USD 994 million, according to ministry data.
These values cover finished modules only. The replies quoted here give no value for solar cell imports.
Where are India's solar panel factories?
Module and cell making sits in a few states, and Gujarat is far ahead of the rest.
- Gujarat: Holds 110 GW of module and 12.5 GW of cell manufacturing capacity, the largest of any state.[2]
- Maharashtra: Has 12.6 GW of module manufacturing capacity.[2]
- Tamil Nadu: TP Solar runs a 4.3 GW cell and module plant at Tirunelveli.[9]
Gujarat has 110 GW of module capacity, against around 213 GW listed across India, according to the same Lok Sabha reply. It also has 12.5 GW of cell capacity.
For a new unit, the choice of state usually comes down to land, power tariffs, state incentives and distance to the main buyers.
What drives the solar panel market in India, and what holds it back?
Demand rests on a large, policy-backed build-out of solar power. The main limits sit in the supply chain rather than in demand.
What drives demand
- A record 44.61 GW of solar was added in 2025-26, and installed capacity reached about 175 GW by October 2026[6][7]
- PM Surya Ghar has commissioned 19.1 GW of rooftop solar for 65.26 lakh households[7]
- From 1 June 2026, projects under ALMM must use modules made with listed Indian cells[1]
- Module exports rose from about USD 83 million in 2021-22 to about USD 1,051 million in 2025-26, according to ministry data[5]
The gap between module and cell capacity is the number to watch. Until more cell lines start, module makers compete for a small pool of listed cells, and those without their own cells are the most exposed.
Is there room for a new solar panel or cell unit in India?
A plain module assembly line is the hardest case today, because listed module capacity is already several times what India installs in a year.
The stronger cases lie further up the chain or in narrower markets. These include solar cells, ingots and wafers, solar glass, and modules aimed at rooftop installers or export buyers.
How NPCS helps with solar manufacturing projects
- Market research reportCompany profiles, financials, trade and demand-supply for solar panels and cells.
- Supply chain studyCell, wafer, glass and frame sourcing options for a module or cell plant.
- Detailed project reportPlant cost, machinery and five-year projections for a module, cell or glass unit.
- Custom market surveyBuyer research among developers, rooftop installers or export customers.
NPCS has helped launch businesses across 40+ sectors since 1994, serving 150K+ clients in 85 countries with 150K successful projects delivered.
What the NPCS solar panel market report covers
- Market overview and definition
- Market size and growth
- Growth drivers and industry trends
- Demand and supply situation
- Foreign trade: imports and exports
- Regulatory framework and recent changes
- Porter's five forces analysis
- SWOT analysis
- Key player profiles with financials
- Shareholding pattern, revenue mix and plant locations
This page summarises public data. The full report adds company profiles, financials and the demand-supply analysis.
Request the report contentsProject reports for this industry
Planning a plant rather than studying the market? These NPCS project reports cover plant cost, machinery and profitability, each with a free illustrative sample.
How this page was researched
Each figure on this page is taken from a source we opened on the date shown, and the source is numbered in the list below. Government data comes first. Company figures come from company filings and documents, or from rating-agency sector notes.
Market size estimates are published by research firms and rating agencies. They often disagree, because they define the market differently or use different base years. We show them side by side instead of choosing one. Rupee equivalents of US dollar figures use ₹95.25 per USD and are for comparison only.
NPCS does not add its own forecasts to this page. The page is reviewed every 6 months, or sooner when a major data release or policy change comes out.
Solar panel market in India: frequently asked questions
What is the size of the solar panel market in India?
There is no official rupee value. Research firm A estimates USD 9 billion for 2025, Research firm B puts solar PV modules at USD 10,689.2 million for 2026, and Research firm C gives USD 8.1 billion for 2024. The base years and product scope differ, so read the three figures as a range, not one number.
How much solar power capacity does India have?
About 175 GW of solar capacity was installed by 31 October 2026, according to PIB. India added a record 44.61 GW in 2025-26. In June 2026, utility-scale projects made up 125.60 GW, rooftop systems 30.11 GW and off-grid systems 6.43 GW, according to a ministry reply in the Lok Sabha.
How much solar module manufacturing capacity does India have?
Module capacity listed under ALMM List-I was around 213 GW in August 2026, up from about 22 GW in March 2023, the ministry told the Lok Sabha. Listed cell capacity was around 32 GW, and ingot and wafer capacity only about 2 GW. So the shortage is in cells and wafers, not in module lines.
What is ALMM List-II and why does it matter?
ALMM is the ministry's approved list of solar models and makers. List-I covers modules and List-II covers cells. From 1 June 2026, projects that must use listed modules also need modules made with listed cells. Demand therefore shifts towards Indian cell makers, and a plant that only assembles modules has a weaker position.
Who are the leading solar panel manufacturers in India?
Waaree Energies reports 25.8 GW of module capacity and 5.4 GW of cells. Premier Energies commissioned a 7 GW TOPCon cell line in 2026, and TP Solar, part of Tata Power, runs a 4.3 GW cell and module plant at Tirunelveli. Reliance, ReNew and Vikram Solar hold large awards under the PLI scheme.
What is the solar energy market size in India?
This page values solar panels, not the whole solar energy business, which also covers inverters, structures, construction and power sales. The clearest official measure of the wider market is capacity: about 175 GW installed by October 2026, with a record 44.61 GW added in 2025-26. Published estimates for panels are in the table above.
Does this page cover the solar tracker market?
Only briefly. Solar trackers are mounting systems that turn panels to follow the sun, used mainly in large ground-mounted plants. We found no official, rating agency or company data on tracker sales in India, so we do not size them. Utility-scale plants, the main users, held 125.60 GW of installed capacity in June 2026.
What does the NPCS solar panel report add to this page?
This page sums up public data and published estimates. The NPCS report goes further, with profiles and financials of the main makers, demand and supply analysis, imports and exports, the regulatory framework and a SWOT analysis. It suits companies, lenders and investors weighing a module, cell or wafer plant. Ask for the contents and price through the enquiry form.
Sources
- ALMM List-II for solar PV cells: clarification on rooftop solar projects on Government buildings (O.M. 283/34/2026)Ministry of New and Renewable Energy, Official, checked Nov 2026
- Lok Sabha Starred Question 354: Expanding domestic manufacturing capacity of solar PV modulesMinistry of New and Renewable Energy (Lok Sabha reply), Official, checked Nov 2026
- Lok Sabha Starred Question 58: Growth in solar capacityMinistry of New and Renewable Energy (Lok Sabha reply), Official, checked Nov 2026
- Lok Sabha Unstarred Question 1114: PLI scheme for high efficiency solar PV modules, Tranche-II awardsMinistry of New and Renewable Energy (Lok Sabha reply), Official, checked Nov 2026
- Lok Sabha Unstarred Question 4016: Promoting domestic manufacture of solar equipmentsMinistry of New and Renewable Energy (Lok Sabha reply), Official, checked Nov 2026
- India reached its highest-ever renewable energy share in electricity generation: Shri JoshiMinistry of New and Renewable Energy (PIB release), Official, checked Nov 2026
- India's Renewable Energy Journey: Powering a Cleaner Future (PIB backgrounder)Press Information Bureau, Official, checked Nov 2026
- Premier Energies Q2 FY27 earnings conference call transcriptPremier Energies (earnings call transcript filed with NSE), Company filings, checked Nov 2026
- TP Solar records 1 GW module and 0.9 GW cell production in Q2 FY27Tata Power (media release), Company filings, checked Nov 2026
- Waaree Energies Q2 FY27 earnings conference call transcriptWaaree Energies (earnings call transcript filed with NSE), Company filings, checked Nov 2026
- Published market estimate (Research firm B)Independent research firm, not named or linked, checked Nov 2026
- Published market estimate (Research firm A)Independent research firm, not named or linked, checked Nov 2026
- Published market estimate (Research firm C)Independent research firm, not named or linked, checked Nov 2026
Estimates from independent research firms are shown as Research firm A, B and so on, without the firm's name or a link.