WhatsApp us
Request a Quote

Project reports in Industrial Minerals

Fullers Earth Plant Project Report

Plant cost, process, machinery, clay supply and five-year profitability for a fullers earth plant, with a free sample project report PDF you can open right now.

Plant capacity
37 MT per day
Total project cost
₹401 lakh
Plant and machinery
₹190 lakh
Return on investment
27% (Year 3)
Break-even
34% of capacity
Payback period
About 3.2 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a fullers earth project report?

A fullers earth project report is a detailed project report (DPR) for a plant that dries, grinds and grades fuller's earth clay into powder for oil bleaching, absorbents and carriers. It sets out the process, machinery, clay supply, market, project cost, means of finance, five-year projections, DSCR and break-even that a lender or investor checks.

Entrepreneurs and mineral traders use it to size the plant and raise a term loan; banks use it to judge whether the plant can repay from its cash flow.

Also known as: multani mitti project report, fullers earth business plan, project report on fullers earth, bleaching clay plant project report.

Fullers earth manufacturing plant cost in India

Our sample report models a dry grinding plant of 37 metric tonnes per day (MT per day), working 300 days a year. It starts at 60% capacity and reaches 80% in Year 5, selling powder at ₹9,000 per MT before GST.

₹401 lakhTotal project cost
₹699 lakhSales in Year 3
₹107 lakhNet profit in Year 3
2.06Average DSCR
Cost of project (₹ lakh)
Land and site development40.96
Building and civil works97.98
Plant and machinery189.88
Other fixed assets26.73
Contingencies14.39
Preliminary and pre-operative9.25
Working capital margin21.86
Total401.05
Means of finance (₹ lakh)
Promoter's contribution (25%)100.26
Term loan from bank (75%)300.79
Cash credit limit (separate)65.59
Total project cost401.05

DSCR (debt service coverage ratio) shows how many times cash earnings cover the loan instalments due that year. In the sample it is lowest in Year 2, at 1.79, when the moratorium ends and full instalments begin.

Term loan at 10.5% with a 6-month moratorium and 54 monthly instalments. All figures are illustrative.

Fullers earth manufacturing process

Natural fuller's earth is a dry process: no chemicals and almost no process water. The skill lies in drying the clay evenly and grinding it to the mesh each buyer specifies.

  1. Weathering and sorting

    Mined lumps are spread in the yard to shed surface moisture, and stones and sandy pieces are picked out by hand.

  2. Crushing

    A jaw crusher breaks the lumps into small, even pieces so the dryer heats them uniformly.

  3. Drying

    A rotary dryer brings the clay down to a low, steady moisture; too much heat can reduce its bleaching activity.

  4. Grinding

    A pulveriser grinds the dried clay to fine powder, with cyclones and bag filters catching the dust.

  5. Classification

    An air classifier splits the powder into mesh grades and returns the coarse fraction to the mill.

  6. Testing and packing

    Each lot is checked for moisture, mesh and bleaching power, then packed in HDPE bags with the lot number.

Natural fullers earth or activated bleaching earth?

Decide this before anything else, because it changes the plant, the buyers and the pollution category. The Indian Bureau of Mines notes that calcium-type clay can be upgraded by cation exchange or acid activation.

PointNatural (dried and ground)Acid-activated bleaching earth
ProcessSort, crush, dry, grind, classifyAdds acid treatment, washing, filtering and a second drying
Main inputsClay and bagsClay, sulphuric acid, water and more fuel
Typical buyersAbsorbents, carriers, foundries, multani mitti packers, some oil refinersEdible oil refineries needing high bleaching power
Pollution categoryOrange (mineral grinding and pulverisation)Orange (activated bleaching earth), with acidic effluent to treat
InvestmentLower; the sample plant is ₹401 lakhIndicative: higher for the same tonnage, for acid-resistant tanks, filters and effluent treatment

A common path: start with natural grades, build a buyer base, then add an activation line once your clay has been tested for how well it responds to acid.

Clay supply and raw materials for a fullers earth plant

Fuller's earth is a minor mineral under the MMDR Act 1957, so clay comes from state-granted leases and each load should travel with a valid transit pass. Bleaching power and grit vary from pit to pit, so test samples from every new source.

Raw materialShare of costYear 3 (₹ lakh)
Raw fuller's earth clay80%205.44
HDPE bags20%51.36
Total100%256.80

Raw materials are 36.7% of sales in our sample. Freight on clay is often a large part of its landed cost, so price it delivered at the plant.

Machinery for fullers earth processing

The pulveriser is the largest machinery cost in the sample, followed by the rotary dryer. Together they are over half the plant and machinery budget.

MachineWhat it doesSample cost (₹ lakh)
Jaw crusherBreaks mined lumps to dryer feed size37.98
Rotary dryerRemoves moisture with a coal, biomass or gas-fired furnace47.47
PulveriserGrinds dry clay to fine powder56.96
Air classifierSeparates powder into mesh grades28.48
Bagging and stitching machineWeighs, fills and closes bags18.99
Total plant and machinery189.88

Costs are the sample report's estimates for a 37 MT per day line. Conveyors, cyclones and bag filters should be quoted with the mill. Get current quotations before you finalise.

Power, fuel and manpower for a fullers earth plant

Drying and grinding make this an energy-heavy plant for its size. In our sample, power and fuel take 12.3% of sales, the largest cost after raw materials.

Power and fuel12.3% of sales in the sample; the dryer furnace burns most of the fuel, the mill and classifier draw most of the power
Backup powerA DG set is included under other fixed assets, so a power cut does not leave wet clay in the dryer
WaterLittle process water; mainly for dust suppression in the yard and for staff
Manpower22 people: 3 in management and supervision, 8 skilled operators, 11 semi-skilled and unskilled workers
Wage bill₹40.56 lakh a year in the sample
Working days300 a year; plan clay stock for the monsoon, when mining and yard drying slow down

Licences and standards for a fullers earth unit

Beyond Udyam and GST registration, these are the approvals and references that matter for this product. Rules differ by state, so confirm them with the local office.

Mineral rulesFuller's earth is a minor mineral under the MMDR Act 1957. Buy only from leaseholders with transit passes, and check whether your state needs a storage or dealer licence for a processing plant
Pollution board consentConsent to establish and operate from the State Pollution Control Board. Mineral grinding and pulverisation is in CPCB's Orange category, as is activated bleaching earth
Bleaching earth standardIS 1965:1972 covers bleaching earths of Indian origin for vegetable oils; IS 1035:1972 sets the sampling and test methods
Cosmetic licencePacking multani mitti for skin care needs a cosmetic manufacturing licence in Form COS-8 from the State Licensing Authority (application in Form COS-5)
Factory and safetyFactory licence where worker thresholds apply, and fire safety approval for the dryer furnace and fuel store

Who buys fullers earth in India?

Oil refining is the traditional market: refiners use the clay to remove colour and impurities from edible oils and vanaspati. The Indian Bureau of Mines reports that activated bauxite and magnesium silicate have taken some of this demand. It expects growth in newer uses such as oil-spill absorbents and pesticide carriers.

Buyers test each lot, so a plant wins repeat orders by holding moisture, mesh and bleaching power steady from one delivery to the next.

  • Edible oil refineries and vanaspati makers
  • Pesticide and fertiliser formulators, as a carrier
  • Cat litter and industrial absorbent makers
  • Animal feed mills, as a pellet binder
  • Foundries, for sand bonding
  • Cosmetic and ayurvedic brands buying multani mitti

Where a new plant wins: our sample prices powder at ₹9,000 per MT, about ₹9 a kilo, so freight can decide the deal. A plant close to both the clay and its buyers can undercut a distant supplier with better clay.

Mistakes that weaken a fullers earth project report

  • Pricing wet clay as if it were dry

    Mined clay carries moisture that the dryer removes, so more tonnes are bought than sold. Raw material cost must allow for this loss.

  • No lab test of the clay source

    A report that assumes refinery-grade prices without bleaching tests on the actual clay overstates sales. Buyers and lenders will ask how the grade was established.

  • Under-costing dryer fuel

    The furnace is the biggest fuel user. Wet monsoon clay needs more heat per tonne, which squeezes margins in those months.

  • Ignoring monsoon stock

    Mining and yard drying slow in the rains. Working capital must fund a clay stockpile, or the plant stands idle.

  • Selling multani mitti without a cosmetic licence

    Bulk powder to industry is one business; retail face-pack packs are another, with their own licence and labelling rules.

How NPCS helps you set up a fullers earth plant

  • Clay source and grade planMatch your clay's test results to the grades and buyers it can serve.
  • Natural or activated routeCompare plant cost and margins for dry grinding against acid activation.
  • Bank-ready project reportProjections, DSCR and working capital, including monsoon clay stock, in your lender's format.
  • Machinery, layout and approvalsDryer and mill sizing, dust control, plant layout and the approvals list for your state.

NPCS's client list shows 25 assignments in industrial minerals, including a 2024 project report on activated bleaching earth from bentonite. The NPCS project team, led by founder Ajay Kumar Gupta, has prepared project reports since 1994.

What's inside the fullers earth sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

18 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Find NPCS project reports in your budget

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Fullers Earth project report: frequently asked questions

How much does it cost to set up a fullers earth plant in India?

It depends mostly on capacity and whether you activate the clay. Our sample report models a 37 MT per day grinding plant at ₹401 lakh, including land, building and working capital margin. A UP government model report puts a 1,600 kg per day multani mitti unit in rented space at ₹18.08 lakh. An acid activation plant costs far more than either.

What is fullers earth used for?

Its main industrial use is bleaching and decolourising edible oils, vanaspati and mineral oils. It also goes into carriers for pesticides and fertilisers, binders for pelleted animal feed, cat litter and oil absorbents, and carbonless copy paper. Smaller lots are sold as multani mitti for face packs, which brings cosmetic rules into play.

Is fullers earth the same as bentonite or multani mitti?

Multani mitti is the Hindi trade name for fuller's earth sold for skin care. Bentonite is a related clay that swells in water, while fuller's earth is described by the Indian Bureau of Mines as a non-swelling, non-plastic clay. Some calcium bentonites are acid activated to make bleaching earth, so the trade names often overlap.

Where is fullers earth found in India?

Rajasthan holds about 74% of India's fuller's earth resources, followed by Telangana, Arunachal Pradesh and Assam, according to the Indian Bureau of Mines. Rajasthan reported 222,871 tonnes of production in 2021-22. Because the clay is bulky and cheap, most grinding plants are set up within trucking distance of these deposits.

Is a fullers earth business profitable?

It can be, if clay quality and freight are under control. Our illustrative sample shows a 27% return on investment in Year 3, break-even at about 34% of capacity and payback in about 3.2 years. Real results depend on clay cost per tonne, dryer fuel, the grade mix you sell and how far your buyers are from the plant.

Multani mitti ka business kaise shuru kare?

Start by securing clay from a licensed mine or supplier with proper transit passes. Then decide whether you will sell bulk powder to industry or packed multani mitti for skin care. Packed cosmetic sales need a cosmetic manufacturing licence. A project report then sizes the dryer and pulveriser, works out cost and profit, and supports your bank loan application.

Is the fullers earth project report PDF free, and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report. Its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, clay source and location.

Sources and references

  1. Indian Minerals Yearbook 2022: Fuller's Earth (advance release)Indian Bureau of Mines, Ministry of Mines, checked Oct 2026
  2. Indian Minerals Yearbook 2015: Fuller's EarthIndian Bureau of Mines, Ministry of Mines, checked Oct 2026
  3. IS 1965:1972 Specification for bleaching earths of Indian origin used for bleaching vegetable oilsBureau of Indian Standards, checked Oct 2026
  4. IS 1035:1972 Methods of sampling and test for bleaching earthsBureau of Indian Standards, checked Oct 2026
  5. Cosmetics Rules, 2020Central Drugs Standard Control Organisation, checked Oct 2026
  6. Orange category of industries (CPCB revised list, 2020)Puducherry Pollution Control Committee, checked Oct 2026
  7. Odisha Minerals (Prevention of Illegal Mining and Regulation of Trading, Transportation and Storage) Rules, 2025Government of Odisha, checked Oct 2026
  8. Project report: multani mitti manufacturing unitMSME Department, Government of Uttar Pradesh, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different industrial minerals project?

These are a few of the projects we advise on. NPCS's published client list records 25 industrial minerals assignments, so tell us what you are planning.

Tell us your project

Recent industrial minerals assignments

  • Megha Engineering & Infrastructures Ltd
    Market Research Report on Rare Earth Permanent Magnet IndustryHyderabad, 2026
  • Mukand Ltd
    Project Planning and Feasibility Report on Rare Earth Permanent MagnetThane, 2026
  • Krishna Minerals & Shree Krishna Refractories
    Comprehensive Market Research Report on Aluminium production from bauxiteJamnagar, 2024
  • Mohit Minerals Limited
    Industrial Project Report on Coking coal washingKirti Nagar, 2024
  • Manaseer Group
    Investment and Project Report on Activated bleaching earth from bentoniteJordan, 2024
  • NDA Client
    Comprehensive Project Report on Expandable & High Purity Graphite_, 2023
  • Research and Development Council
    Investment and Project Report on Aluminium from BauxiteNigeria, 2023
  • Materials Research Development
    Project Planning and Feasibility Report on Tantalum from Tantalite OreNigeria, 2023

Get a fullers earth project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Fullers Earth Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free fullers earth sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Fullers Earth sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp