A well-documented Business Plan aids in business funding and it is proven to help businesses grow by 30% faster.

Test Your Business ideas- We clear your doubts on Business concept and validate it properly. Often Businesses fail when the Business Plan is weak.

Market Research & High Industry Demand- We will analyse the Market Potential for optimal Industry Growth.

Active Zinc Oxide from Zinc Ash, Secondary Zinc Waste & EAF Dust

Active Zinc oxide is a chemical compound with formula ZnO. It occurs as white hexagonal crystals or a white powder commonly known as zinc white which is used as a pigment in paints. It is nearly insoluble in water but soluble in acids or alkalis. Chinese white is a special grade of zinc white and used in artists' pigments. Zinc oxide and stearic acid are important ingredients in the commercial manufacture of rubber goods. Active Zinc oxide is valuable and growth-oriented product both for direct application and production of other zinc compounds. Two main processes for producing Active zinc oxide are direct and indirect methods. In the direct or American method, zinc ore is heated in air with coke or anthracite, and the resulting zinc vapors are subjected to the controlled oxidation. In the indirect or French process the zinc vapors to be oxidized are obtained by boiling zinc. Active Zinc oxide (ZnO) is water insoluble compound, but soluble in acid and bases. It has wide application in industry such as Rubber, Ceramics, Chemicals, Pharmaceuticals, Cosmetics & Personal Care, Agricultural, and Others. Active Zinc oxide is used primarily in cosmetics and personal care products including makeup, baby lotions, bath soaps, nail products, and powders and others. Rising demand for cosmetics and personal care products will add to the growth of Active zinc oxide market in forecast time. The global Active zinc oxide (ZnO) market size is projected to grow from USD 4.4 billion in 2019 to USD 5.7 billion by 2024, at a compound annual growth rate (CAGR) of 5.4%, during the forecast period. ZnO is a white inorganic compound that is used widely in pharmaceuticals, rubber, ceramics cosmetics, chemicals, and glass industries. The growth of these end-use industries is expected to fuel the global Active zinc oxide market demand over the forecast period. Active Zinc oxide is the most widely used zinc compound, and it plays an important role in a multitude of applications. The galvanization of steel products accounts for half of global zinc consumption due in large part to the metal's critically important corrosion-resistant properties. Active Zinc oxide is also a critical material in the manufacturing of tires, where it increases resilience and elasticity, literally putting the bounce in rubber. Increasing demand of Active Zinc oxide in chemical and manufacturing industry will further boost the market size. Industrial application of the product majorly vulcanization of rubber will surge significantly in forecast period. Tire industry is also one the major consumer of the product. Other major application including manufacturing of concrete, photovoltaic, electronic, optoelectronic devices and glass cutting. India exported Zinc-Oxide worth USD 2,344,417.64. Vietnam is one of the largest buyers of Zinc-Oxide from India, accounting for exports worth USD 666,311.42. The other big buyers of Zinc-Oxide are Spain and Qatar which buy Zinc-Oxide worth USD 486,487.22 and USD 179,654.28 respectively. Rising application of product in paints and coatings is projected to drive the Active zinc oxide market growth. One trend in the market is increasing use in semiconductor industry. The growing demand for Active zinc oxide in the production of varistors, ferrites, and solar cells is expected to propel the growth of the global Active zinc oxide market in the forecast period. The major driver in the market is growing demand for Nano Active zinc oxide. Nano Active zinc oxide is a specialized nanomaterial that is mainly available in the form of dispersions and powders. Companies operating in the Active zinc oxide market are also focusing on new product development and agreement to tap the opportunities in applications, such as solar energy, surface coatings, and pharmaceuticals. The Europe market is mature and developed stably in the past few years and will keep the trend in the next years. North America, led by the U.S. is expected to account for substantial growth in the market during the forecast period. Few Indian major players are as under Transpek-Silox Industry Pvt. Ltd. Rubamin Pvt. Ltd. Nav Bharat Metalic Oxide Inds. Pvt. Ltd. Chemspec Chemicals Pvt. Ltd.

Plant capacity Plant & machinery Working capital Cost of Project T.C.I Return Break even
Active Zinc Oxide: 20 MT / Day Rs 285 lakhs - Cost of Project: Rs 830 lakhs 31.00% 56.00%

Introduction

We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.

Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary & Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** Total ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
  ********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
PARTICULARS EXISTING PROPOSED TOTAL
COST OF PROJECT      
Land & Site Development Exp.      
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
  ********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
  ********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
  ********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
  ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
  ********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PARTICULARS STK.PRD. STK.PRD.   OPERATING YEARS
  1st Year 2nd Yr &+   1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS       ********** ********** ********** ********** **********
Stocks on Hand       ********** ********** ********** ********** **********
Raw Material Cost       ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
  ********** **********   ********** ********** ********** ********** **********
Total       ********** ********** ********** ********** **********
Cash/Bank Balances       ********** ********** ********** ********** **********
Gross Wkg. Capital       ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
    1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales            
Gross Profit   ********** ********** ********** ********** **********
% Of G.P. to Net Sales   ********** ********** ********** ********** **********
Net Profit Before Taxes   ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales   ********** ********** ********** ********** **********
Net Profit After Taxes   ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales   ********** ********** ********** ********** **********
             
Debt Service Coverage Ratio   ********** ********** ********** ********** **********
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations            
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative)   ********** ********** ********** ********** **********
D. S. C. R. (Overall)   ********** ********** ********** ********** **********
             
Parameters            
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital exclUnsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering            
I.E.Total Term Lia./NW            
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** ********** **********
Total Outside Lia./NW   ********** ********** ********** ********** **********
Assets Turnover Ratio (x)   ********** ********** ********** ********** **********
             
No. of Shares of 10.00 each   ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in)   ********** ********** ********** ********** **********
Proposed divident   ********** ********** ********** ********** **********
Cash EPS (in)   ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in)   ********** ********** ********** ********** **********
Payout Ratio (%Age)   ********** ********** ********** ********** **********
Retained Earnings/Share (in)   ********** ********** ********** ********** **********
Retained Earnings (%Age)   ********** ********** ********** ********** **********
Book Value Per Share (in)   ********** ********** ********** ********** **********
Debt Per Share (in)   ********** ********** ********** ********** **********
Probable Mkt. Price/Share(in)   ********** ********** ********** ********** **********
Price / Book Value (x)   ********** ********** ********** ********** **********
Price Earnings Ratio (x)   ********** ********** ********** ********** **********
Yield (%Age)   ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
  Ratio 1-2 2-3 3-4 4-5 5-6
             
BREAK EVEN ANALYSIS            
Total Value of Output   ********** ********** ********** ********** **********
             
Variable Cost & Expenses            
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total   ********** ********** ********** ********** **********
Less: W.I.P. Adjustments   ********** ********** ********** ********** **********
Total Variable Cost   ********** ********** ********** ********** **********
Net Contribution   ********** ********** ********** ********** **********
Profit Volume Ratio (%)   ********** ********** ********** ********** **********
             
Semi-Var./Semi-Fixed Exp. ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** ********** **********
             
Fixed Expenses / Cost ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** ********** **********
             
Cash Break Even Sales ********** ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** ********** **********
             
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)            
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
MEANS OF FINANCE      
Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
  ********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
  ********** ********** **********
Total Means of Finance ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
           
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
ASSETS ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK  
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.  
F Rate of Interest(General) xxxx% p.a.
G Rate of Interest(Initial) 0.00% p.a.
H Apply Gen. Int. Rate from Year x Quarter :: x  
I Interest Calculation Quarterly  
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations   ********** ********** ********** ********** **********
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) .....   ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........   ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building Office Buildings Plant & Machinery Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures  
1-2 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
       
Type A :: Buildings      
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
       
Type C      
Office Vehicles WDV ********** **********
       
Type D :: Misc. Fixed Assets      
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
       
Type B :: Plant & Machineries      
Projected Pay Back Period
Particulars Operating Years
  1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********        
Total Initial Investment *********        
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months    
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV *********   *********
IRR *********   *********
       

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Introduction

  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications

Market Study and Assessment

  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity

Raw Material

  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers

Personnel (Manpower) Requirements

  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery

  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances &Equipments
  • Laboratory Equipments& Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations

  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram

Infrastructure and Utilities

  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
  • Assumptions for Profitability workings
  • Plant Economics
  • Production Schedule
  • Land & Building
    Factory Land & Building
    Site Development Expenses
  • Plant & Machinery
    Indigenous Machineries
    Other Machineries (Miscellaneous, Laboratory etc.)
  • Other Fixed Assets
    Furniture & Fixtures
    Pre-operative and Preliminary Expenses
    Technical Knowhow
    Provision of Contingencies
  • Working Capital Requirement Per Month
    Raw Material
    Packing Material
    Lab & ETP Chemical Cost
    Consumable Store
  • Overheads Required Per Month And Per Annum
    Utilities & Overheads (Power, Water and Fuel Expenses etc.)
    Royalty and Other Charges
    Selling and Distribution Expenses
  • Salary and Wages
  • Turnover Per Annum
  • Share Capital
    Equity Capital
    Preference Share Capital
  • Annexure 1:: Cost of Project and Means of Finance
  • Annexure 2:: Profitability and Net Cash Accruals
    Revenue/Income/Realisation
    Expenses/Cost of Products/Services/Items
    Gross Profit
    Financial Charges
    Total Cost of Sales
    Net Profit After Taxes
    Net Cash Accruals
  • Annexure 3 :: Assessment of Working Capital requirements
    Current Assets
    Gross Working. Capital
    Current Liabilities
    Net Working Capital
    Working Note for Calculation of Work-in-process
  • Annexure 4 :: Sources and Disposition of Funds
  • Annexure 5 :: Projected Balance Sheets
    ROI (Average of Fixed Assets)
    RONW (Average of Share Capital)
    ROI (Average of Total Assets)
  • Annexure 6 :: Profitability ratios
    D.S.C.R
    Earnings Per Share (EPS)
  • Debt Equity Ratio
  • Annexure 7 :: Break-Even Analysis
    Variable Cost & Expenses
    Semi-Var./Semi-Fixed Exp.
    Profit Volume Ratio (PVR)
    Fixed Expenses / Cost
    B.E.P
  • Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
    Resultant N.P.B.T
    Resultant D.S.C.R
    Resultant PV Ratio
    Resultant DER
    Resultant ROI
    Resultant BEP
  • Annexure 12 :: Shareholding Pattern and Stake Status
    Equity Capital
    Preference Share Capital
  • Annexure 13 :: Quantitative Details-Output/Sales/Stocks
    Determined Capacity P.A of Products/Services
    Achievable Efficiency/Yield % of Products/Services/Items
    Net Usable Load/Capacity of Products/Services/Items
    Expected Sales/ Revenue/ Income of Products/ Services/ Items
  • Annexure 14 :: Product wise domestic Sales Realisation
  • Annexure 15 :: Total Raw Material Cost
  • Annexure 16 :: Raw Material Cost per unit
  • Annexure 17 :: Total Lab & ETP Chemical Cost
  • Annexure 18 :: Consumables, Store etc.,
  • Annexure 19 :: Packing Material Cost
  • Annexure 20 :: Packing Material Cost Per Unit
  • Annexure 21 :: Employees Expenses
  • Annexure 22 :: Fuel Expenses
  • Annexure 23 :: Power/Electricity Expenses
  • Annexure 24 :: Royalty & Other Charges
  • Annexure 25 :: Repairs & Maintenance Exp.
  • Annexure 26 :: Other Mfg. Expenses
  • Annexure 27 :: Administration Expenses
  • Annexure 28 :: Selling Expenses
  • Annexure 29 :: Depreciation Charges – as per Books (Total)
  • Annexure 30 :: Depreciation Charges – as per Books (P & M)
  • Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
  • Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
  • Annexure 33 :: Interest and Repayment - Term Loans
  • Annexure 34 :: Tax on Profits
  • Annexure 35 ::Projected Pay-Back Period And IRR
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

Need assistance?

Share your details, we will call you

X

Have a business idea? Let’s make it
happen together-contact us now!