Aluminium Wire & Cables Manufacturing Industry

Aluminium Wire & Cables Manufacturing Industry. Start an Electric Wire & Cable Business Aluminium (Al) is one of the most common metal elements. In fact, it is the third most abundant element (after oxygen and silicon) that makes up about 8% by weight of the Earth’s crust. Aluminium is one of the most electrically conductive metals and highly resistant to ordinary corrosion. With other characteristics such as lightweight, strength, and low cost to produce, aluminium has become one of the most popular materials for electrical applications. Aluminium wire is nowadays increasingly popular for electrical wiring and in utility grid transmission and distribution networks, and are widely used for wiring in several of industries including electronics, construction, aircraft etc. Aluminium Wire Aluminum wire are utilized in various home electrical appliances, switches, circuit breakers and motors owing to its light weight, corrosion resistance and retention of temperature even at low temperatures properties. The products are used in electrical products as they are lighter than other material, it also reduces corona an electric discharge which is associated with high power transmission and its excessive heating do not separate the electrical fixtures and connections, thus increasing the industry demand. Uses of Aluminium wire • In Construction Industry Aluminium is an excellent alternative to copper and is largely used in the manufacture of building wires. Electricians and contractors use large sizes of aluminium building wire where there is requirement of low voltage. This is more beneficial to contractors in terms of savings as it has half the weight of copper wire. Aluminium conductors for building wire are made in such a manner that the overall diameter of the aluminium wire is similar to that of copper wire. • In Electrical Distribution Industry Utilities such as electrical distribution companies have been extensively using aluminum wire throughout their distributing systems (power grids) for transmission of electric current. • In Communication Industry The copper clad aluminium wire is primarily used in high quality coils, power cables and antennas. The aluminium-copper combination finds its use in commercial as well as residential applications including household wiring, cable wiring, headphones, loudspeakers and antennas. CCAW are also used to help connect the internet to the computer. They are important components of cable modems and television connections as well as Ethernet connections (that is, LAN and WAN). • In Broadcasting Networks Modern broadcasting networks (radio and television) largely rely on aluminium wire (CCAW) for information broadcast. Basically, two forms of radio networks are known- the first form is used for broadcasting and updates, advertising and marketing whereas the other form is the backbone of police and armed forces (used for communicating with each other). Television broadcasting involves transmitting signals through cable and satellite television. • In Submarine Communications Aluminium wires clad with copper provide a great means of submarine communication and are installed below the floor of the ocean to expedite the process of information transfer across the globe. • In Medical Field Aluminium wire finds also its use in medical science instruments that are involved in diagnostic processes such as medical ultrasonography. Aluminium Cables Aluminium cables are used across various industries and markets. In our last blog we shared the financial advantages of aluminium cables. Now we will focus on the physical advantages of aluminium cables. A second advantage is the weight of aluminium; it is much lighter in weight as compared to copper while maintaining the same conductivity. Being light in weight is an important property of aluminium. This has made aluminium cables the most used cables in projects where weight is the main focus like constructions with load-bearing purposes. Market Outlook Aluminum Wire Market size was over USD 50 billion in 2017 and industry expects consumption at over 10 million tons by 2024. It is set to surpass USD 65 billion by 2024. Growing consumer demand towards lightweight automobile vehicles may drive aluminum wire market demand. Superior properties which include light weight, high strength and corrosion resistance may cater to construction and electrical industries, thus propelling industry growth over the forecast timeframe. The global aluminium wire market has witnessed growth at a steady rate over the recent years. The market is primarily driven by the rising demand in the rapid urbanization around the world, the increased support from governments, as well as the new production techniques that reduce not only the cost of aluminium wire production but also significantly reduce the processing time of the wire rods. As the consumption of aluminium wires in various industries still remains high, business opportunities in the global aluminium market are expected to flourish further in the near future. Growing consumer demand towards lightweight automobile vehicles may drive aluminum wire market demand. Superior properties which include light weight, high strength and corrosion resistance may cater to construction and electrical industries, thus propelling industry growth over the forecast timeframe. Aluminum wire are utilized in various home electrical appliances, switches, circuit breakers and motors owing to its light weight, corrosion resistance and retention of temperature even at low temperatures properties. The products are used in electrical products as they are lighter than other material, it also reduces corona an electric discharge which is associated with high power transmission and its excessive heating do not separate the electrical fixtures and connections, thus increasing the industry demand. In the last few years, the automotive and aerospace companies have also been shifting their focus toward the surging use of electronic contents for downgrading the size of the components and improving the use of digital technologies in the fleets. Considering the lightweight and ease of use characteristics, the contributors in the automobile and aerospace sectors have been using aluminum wires in electronic panels which are installed in engine control units (ECU), infotainment systems, and other control units. The global aluminium wire market can be classified on the basis of product type and application. In terms of product type, the market can be segmented into paper insulated, enamelled, and fiberglass aluminium wire. Of these, paper insulated aluminium wire is expected to led the market during the forecast tenure. Rising application of aluminium wire in various industries is likely to boost the demand in the global aluminium market. Food and beverages, automotive, and customer electronics are some of the key industries in which aluminium wires are used extensively. Non-toxic nature of aluminium will preserve food for longer duration and prevents the growth of micrograms. These factors increase its demand on the food and beverages industry. The demand for aluminium is also increasing the automotive industry as it reduces weight of the vehicle to increase fuel economy. Moreover, manufacturers now prefer aluminium to steel mainly to reduce weight without compromising strength and carrying capacity of the vehicle. Asia Pacific driven by India, Japan, and China aluminium wire market size may register significant gains at 3.5% by the end of foreseeable timeframe. These are used in various construction application which includes wiring systems owing to its high strength, durability and less risk of breakage coupled with cost cutting and weight saving properties, which in turn stimulate regional demand. Aluminum wire is drawn by hot rolling in which rods are formed followed by solution handling and quenching of the coils attained by hot rolling. Increasing demand for light weight automotive vehicles and stringent performance requirements in electrical machines is likely to propel product demand. In electrical application these are used in transformers as their oxides are strongly attached, hard to dislodge and are electrically insulated. High tensile strength property can be tailored, and its lighter weight require few support towers for overhead transmission lines, which offers more growth opportunities in the market. India Wires and Cables Market Wires and cables play an indispensable role in today’s digitally advanced life and find extensive usage across a number of applications in several industries. The extensive usage and applications of wires and cables across various industries will put the wires and cables industry on the right path for the future. Wires and cables market in the world and in India is highly fragmented, with the presence a number of small and medium enterprises. The organized sector manufactures high voltage durable cables, whereas the unorganized sector mainly captures the low voltage market, where products are mainly separated on the basis of the price. The wires and cables market is presently at its growing stage in our country and is expected to be capturing a significant share in the electrical equipment industry in the upcoming years. The wires and cables in the India has witnessed a growth in recent years on account of rising demand wires and cables fueled by expansion in infrastructure development, electricity consumption and others. The surge in revenue is majorly originated from growth in power cables as a segment of wires and cables market. The upsurge in this segment has been largely led by the domestic factors such government expenditure on infrastructure, increase in level of investment, rising level of disposable income, technological advancement. Tags #Aluminium_Wire_Manufacturing_Plant, #Process_of_Manufacturing_of_Aluminium_Wire, Production_Process_of_Aluminium_Wire, Manufacturing of Aluminium Cables, Aluminium Wire Manufacturing Process, Manufacturing Process of Aluminium Wire, #Aluminum_Wire_Production, Aluminium Wire, Aluminium Cables & Wires, Aluminum Electrical Wire, Aluminium Cable Manufacturing Process, Cable Manufacturing Process Flow Chart, Cable Manufacturing Process PPT, How Electrical Cables are made, Electrical Cable Manufacture, #Profitable_Business_Ideas_in_Wire_&_Cable_Manufacturing_Industry, #Wire_&_Cable_Manufacturing_Business, Electric Wire Manufacturing Plant Cost, Wire & Cable Manufacturing Projects, Aluminium Wire Manufacture, Aluminum Wire and Cable Production, #Project_Report_on_Aluminium_Wire_manufacturing_Industry, Detailed Project Report on Aluminium Cable Manufacturing, Project Report on Aluminum Wire and Cable Production, #Pre_Investment_Feasibility_Study_on_Aluminum_Wire_and_Cable_Production, #Techno_Economic_feasibility_study_on_Aluminum_Wire_and_Cable_Production, #Feasibility_report_on_Aluminum_Wire_and_Cable_Production, #Free_Project_Profile_on_Aluminium_Cable_Manufacturing, Project profile on Aluminum Wire and Cable Production, Download free project profile on Aluminium Cable Manufacturing

Plant capacity Plant & machinery Working capital T.C.I Return Break even
- - - - 1% 0%

Introduction

We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.

Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary & Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** Total ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
  ********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
PARTICULARS EXISTING PROPOSED TOTAL
COST OF PROJECT      
Land & Site Development Exp.      
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
  ********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
  ********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
  ********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
  ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
  ********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PARTICULARS STK.PRD. STK.PRD.   OPERATING YEARS
  1st Year 2nd Yr &+   1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS       ********** ********** ********** ********** **********
Stocks on Hand       ********** ********** ********** ********** **********
Raw Material Cost       ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
  ********** **********   ********** ********** ********** ********** **********
Total       ********** ********** ********** ********** **********
Cash/Bank Balances       ********** ********** ********** ********** **********
Gross Wkg. Capital       ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
    1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales            
Gross Profit   ********** ********** ********** ********** **********
% Of G.P. to Net Sales   ********** ********** ********** ********** **********
Net Profit Before Taxes   ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales   ********** ********** ********** ********** **********
Net Profit After Taxes   ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales   ********** ********** ********** ********** **********
             
Debt Service Coverage Ratio   ********** ********** ********** ********** **********
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations            
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative)   ********** ********** ********** ********** **********
D. S. C. R. (Overall)   ********** ********** ********** ********** **********
             
Parameters            
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital exclUnsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering            
I.E.Total Term Lia./NW            
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** ********** **********
Total Outside Lia./NW   ********** ********** ********** ********** **********
Assets Turnover Ratio (x)   ********** ********** ********** ********** **********
             
No. of Shares of 10.00 each   ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in)   ********** ********** ********** ********** **********
Proposed divident   ********** ********** ********** ********** **********
Cash EPS (in)   ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in)   ********** ********** ********** ********** **********
Payout Ratio (%Age)   ********** ********** ********** ********** **********
Retained Earnings/Share (in)   ********** ********** ********** ********** **********
Retained Earnings (%Age)   ********** ********** ********** ********** **********
Book Value Per Share (in)   ********** ********** ********** ********** **********
Debt Per Share (in)   ********** ********** ********** ********** **********
Probable Mkt. Price/Share(in)   ********** ********** ********** ********** **********
Price / Book Value (x)   ********** ********** ********** ********** **********
Price Earnings Ratio (x)   ********** ********** ********** ********** **********
Yield (%Age)   ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
  Ratio 1-2 2-3 3-4 4-5 5-6
             
BREAK EVEN ANALYSIS            
Total Value of Output   ********** ********** ********** ********** **********
             
Variable Cost & Expenses            
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total   ********** ********** ********** ********** **********
Less: W.I.P. Adjustments   ********** ********** ********** ********** **********
Total Variable Cost   ********** ********** ********** ********** **********
Net Contribution   ********** ********** ********** ********** **********
Profit Volume Ratio (%)   ********** ********** ********** ********** **********
             
Semi-Var./Semi-Fixed Exp. ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** ********** **********
             
Fixed Expenses / Cost ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** ********** **********
             
Cash Break Even Sales ********** ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** ********** **********
             
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)            
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
MEANS OF FINANCE      
Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
  ********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
  ********** ********** **********
Total Means of Finance ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
           
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
ASSETS ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK  
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.  
F Rate of Interest(General) xxxx% p.a.
G Rate of Interest(Initial) 0.00% p.a.
H Apply Gen. Int. Rate from Year x Quarter :: x  
I Interest Calculation Quarterly  
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations   ********** ********** ********** ********** **********
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) .....   ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........   ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building Office Buildings Plant & Machinery Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures  
1-2 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
       
Type A :: Buildings      
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
       
Type C      
Office Vehicles WDV ********** **********
       
Type D :: Misc. Fixed Assets      
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
       
Type B :: Plant & Machineries      
Projected Pay Back Period
Particulars Operating Years
  1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********        
Total Initial Investment *********        
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months    
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV *********   *********
IRR *********   *********
       

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Introduction

  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications

Market Study and Assessment

  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity

Raw Material

  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers

Personnel (Manpower) Requirements

  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery

  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances &Equipments
  • Laboratory Equipments& Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations

  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram

Infrastructure and Utilities

  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
  • Assumptions for Profitability workings
  • Plant Economics
  • Production Schedule
  • Land & Building
    Factory Land & Building
    Site Development Expenses
  • Plant & Machinery
    Indigenous Machineries
    Other Machineries (Miscellaneous, Laboratory etc.)
  • Other Fixed Assets
    Furniture & Fixtures
    Pre-operative and Preliminary Expenses
    Technical Knowhow
    Provision of Contingencies
  • Working Capital Requirement Per Month
    Raw Material
    Packing Material
    Lab & ETP Chemical Cost
    Consumable Store
  • Overheads Required Per Month And Per Annum
    Utilities & Overheads (Power, Water and Fuel Expenses etc.)
    Royalty and Other Charges
    Selling and Distribution Expenses
  • Salary and Wages
  • Turnover Per Annum
  • Share Capital
    Equity Capital
    Preference Share Capital
  • Annexure 1:: Cost of Project and Means of Finance
  • Annexure 2:: Profitability and Net Cash Accruals
    Revenue/Income/Realisation
    Expenses/Cost of Products/Services/Items
    Gross Profit
    Financial Charges
    Total Cost of Sales
    Net Profit After Taxes
    Net Cash Accruals
  • Annexure 3 :: Assessment of Working Capital requirements
    Current Assets
    Gross Working. Capital
    Current Liabilities
    Net Working Capital
    Working Note for Calculation of Work-in-process
  • Annexure 4 :: Sources and Disposition of Funds
  • Annexure 5 :: Projected Balance Sheets
    ROI (Average of Fixed Assets)
    RONW (Average of Share Capital)
    ROI (Average of Total Assets)
  • Annexure 6 :: Profitability ratios
    D.S.C.R
    Earnings Per Share (EPS)
  • Debt Equity Ratio
  • Annexure 7 :: Break-Even Analysis
    Variable Cost & Expenses
    Semi-Var./Semi-Fixed Exp.
    Profit Volume Ratio (PVR)
    Fixed Expenses / Cost
    B.E.P
  • Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
    Resultant N.P.B.T
    Resultant D.S.C.R
    Resultant PV Ratio
    Resultant DER
    Resultant ROI
    Resultant BEP
  • Annexure 12 :: Shareholding Pattern and Stake Status
    Equity Capital
    Preference Share Capital
  • Annexure 13 :: Quantitative Details-Output/Sales/Stocks
    Determined Capacity P.A of Products/Services
    Achievable Efficiency/Yield % of Products/Services/Items
    Net Usable Load/Capacity of Products/Services/Items
    Expected Sales/ Revenue/ Income of Products/ Services/ Items
  • Annexure 14 :: Product wise domestic Sales Realisation
  • Annexure 15 :: Total Raw Material Cost
  • Annexure 16 :: Raw Material Cost per unit
  • Annexure 17 :: Total Lab & ETP Chemical Cost
  • Annexure 18 :: Consumables, Store etc.,
  • Annexure 19 :: Packing Material Cost
  • Annexure 20 :: Packing Material Cost Per Unit
  • Annexure 21 :: Employees Expenses
  • Annexure 22 :: Fuel Expenses
  • Annexure 23 :: Power/Electricity Expenses
  • Annexure 24 :: Royalty & Other Charges
  • Annexure 25 :: Repairs & Maintenance Exp.
  • Annexure 26 :: Other Mfg. Expenses
  • Annexure 27 :: Administration Expenses
  • Annexure 28 :: Selling Expenses
  • Annexure 29 :: Depreciation Charges – as per Books (Total)
  • Annexure 30 :: Depreciation Charges – as per Books (P & M)
  • Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
  • Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
  • Annexure 33 :: Interest and Repayment - Term Loans
  • Annexure 34 :: Tax on Profits
  • Annexure 35 ::Projected Pay-Back Period And IRR
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

Need assistance?

Share your details, we will call you

Let's Connect

Fill in the form below, &
we'll get back to you within 24 hours.

CAPTCHA Image