CEMENT PLANT - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one form or another. The term cement is used to designate many different kinds of substances that are used as binders. Cement used in construction is characterised as hydraulic or non-hydraulic. The term cements as used henceforth will be confined to inorganic hydraulic cements, principally Portland cement. India is the second-largest producer of cement in the world after China with industry capacity of approximately 160 MT in 2006. The cement industry is regional in nature due to the concentration of limestone reserves located in a few states. This has resulted in a surplus situation in some regions and a deficit in others. Demand for cement has grown at a CAGR of 9.1% in the last two years with supply growing at a CAGR of 8.2% in the same period. With a large amount of infrastructure activities being planned in commercial, real estate and housing sector along with huge development works in roads, railways, ports and hydel projects, we expect the cement demand growth momentum to stay intact. We expect this to have a positive impact on cement prices in different regions till new capacities come up by mid-FY09. Demand for cement is correlated to the GDP growth of the country, infrastructure and industrial capex as well as exports. Strong GDP growth expected in the coming years and huge planned investments should result in healthy growth in the cement demand. The Indian economy continues to be on a much stronger growth path driven by increased amount of infrastructure spending and capex. The economy is expected to grow by 8% for the next two to three years, which will drive an increased demand growth for the cement industry. The cement demand is expected to grow at a CAGR of 10% at least for the next three years. The cement industry witnessed serious M&A activity in the past few years, as a result of which the top four players now account for almost 52 to 55% of the installed cement capacity of India, as against 40 to 42% in FY00. The M&A activity have also had global participants. The growing presence of international players bring with them better technology and operational efficiencies which could significantly alter pricing patterns. Indian cement sales rose 4.82% for FY11, its slowest pace in more than a decade, on poor demand. According to a report from the Business Standard, manufacturers have failed to match their expectation of 9 to 10 per cent growth in financial year 2010 to 2011, and are the first time since the industry entered its boom time during mid 2005 that cement makers’ high trajectory growth slipped to almost half of what experts had anticipated. The industry blames the slide on persistent poor demand for the building commodity throughout the year. After the Commonwealth Games held in Delhi last October, demand worsened, pulling down production and sales on a year on year basis in subsequent months, the report said. Cement demand is dependent on the level of construction activities. Construction activities are in turn closely related to a number of macroeconomic factors such as consumer spending, population growth, manufacturing sector growth, inflation rates, government spending etc. The construction industry is the second largest industry in India after agriculture. It accounts for about 11% of India’s GDP. It makes significant contribution to the national economy and provides employment to large number of people. Construction constitutes 40% to 50% of India's capital expenditure on projects in various sectors such as highways, roads, railways, energy, airports, irrigation etc. There are mainly three segments in the construction industry like real estate construction which includes residential and commercial construction; infrastructure building which includes roads, railways, power etc; and industrial construction that consists of oil and gas refineries, pipelines, textiles etc. Building material is any material which is used for a construction purpose. Many naturally occurring substances, such as clay, sand, wood and rocks, even twigs and leaves have been used to construct buildings. Apart from naturally occurring materials, many man made products are in use. According to a study by ASSOCHAM, the burgeoning Indian construction industry will rise in the coming years. A large and growing middle class population of more than 300 million people, a changing life style, better cost of living etc is growth drivers for this sector. The cement industry has witnessed substantial reorganization of capacities during the last couple of years. Some examples of the consolidation witnessed during the recent past include: Gujarat Ambuja taking a stake of 14% in ACC; Gujarat Ambuja taking over DLF Cements and Modi Cement; India Cement taking over Raasi Cement and Sri Vishnu Cement; Grasims acquisition of the cement business of L&T; Indian Rayons cement division merging with Grasim; Grasim taking over Sri Digvijay Cements; L&T taking over Narmada Cements; ACC taking over IDCOL. There is a very good scope and market potential of cement right now. New entrepreneurs should venture into this field.

Plant capacity Plant & machinery Working capital Cost of Project T.C.I Return Break even
1800000 Nos. Cement Bags (50 Kg. each) 1296 Lakhs - Cost of Project : 1750 Lakhs 42.00% 47.00%

Introduction

We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.

Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary & Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** Total ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
  ********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
PARTICULARS EXISTING PROPOSED TOTAL
COST OF PROJECT      
Land & Site Development Exp.      
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
  ********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
  ********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
  ********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
  ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
  ********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PARTICULARS STK.PRD. STK.PRD.   OPERATING YEARS
  1st Year 2nd Yr &+   1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS       ********** ********** ********** ********** **********
Stocks on Hand       ********** ********** ********** ********** **********
Raw Material Cost       ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
  ********** **********   ********** ********** ********** ********** **********
Total       ********** ********** ********** ********** **********
Cash/Bank Balances       ********** ********** ********** ********** **********
Gross Wkg. Capital       ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
    1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales            
Gross Profit   ********** ********** ********** ********** **********
% Of G.P. to Net Sales   ********** ********** ********** ********** **********
Net Profit Before Taxes   ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales   ********** ********** ********** ********** **********
Net Profit After Taxes   ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales   ********** ********** ********** ********** **********
             
Debt Service Coverage Ratio   ********** ********** ********** ********** **********
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations            
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative)   ********** ********** ********** ********** **********
D. S. C. R. (Overall)   ********** ********** ********** ********** **********
             
Parameters            
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital exclUnsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering            
I.E.Total Term Lia./NW            
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** ********** **********
Total Outside Lia./NW   ********** ********** ********** ********** **********
Assets Turnover Ratio (x)   ********** ********** ********** ********** **********
             
No. of Shares of 10.00 each   ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in)   ********** ********** ********** ********** **********
Proposed divident   ********** ********** ********** ********** **********
Cash EPS (in)   ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in)   ********** ********** ********** ********** **********
Payout Ratio (%Age)   ********** ********** ********** ********** **********
Retained Earnings/Share (in)   ********** ********** ********** ********** **********
Retained Earnings (%Age)   ********** ********** ********** ********** **********
Book Value Per Share (in)   ********** ********** ********** ********** **********
Debt Per Share (in)   ********** ********** ********** ********** **********
Probable Mkt. Price/Share(in)   ********** ********** ********** ********** **********
Price / Book Value (x)   ********** ********** ********** ********** **********
Price Earnings Ratio (x)   ********** ********** ********** ********** **********
Yield (%Age)   ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
  Ratio 1-2 2-3 3-4 4-5 5-6
             
BREAK EVEN ANALYSIS            
Total Value of Output   ********** ********** ********** ********** **********
             
Variable Cost & Expenses            
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total   ********** ********** ********** ********** **********
Less: W.I.P. Adjustments   ********** ********** ********** ********** **********
Total Variable Cost   ********** ********** ********** ********** **********
Net Contribution   ********** ********** ********** ********** **********
Profit Volume Ratio (%)   ********** ********** ********** ********** **********
             
Semi-Var./Semi-Fixed Exp. ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** ********** **********
             
Fixed Expenses / Cost ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** ********** **********
             
Cash Break Even Sales ********** ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** ********** **********
             
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)            
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
MEANS OF FINANCE      
Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
  ********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
  ********** ********** **********
Total Means of Finance ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
           
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
ASSETS ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK  
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.  
F Rate of Interest(General) xxxx% p.a.
G Rate of Interest(Initial) 0.00% p.a.
H Apply Gen. Int. Rate from Year x Quarter :: x  
I Interest Calculation Quarterly  
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations   ********** ********** ********** ********** **********
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) .....   ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........   ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building Office Buildings Plant & Machinery Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures  
1-2 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
       
Type A :: Buildings      
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
       
Type C      
Office Vehicles WDV ********** **********
       
Type D :: Misc. Fixed Assets      
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
       
Type B :: Plant & Machineries      
Projected Pay Back Period
Particulars Operating Years
  1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********        
Total Initial Investment *********        
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months    
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV *********   *********
IRR *********   *********
       

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Introduction

  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications

Market Study and Assessment

  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity

Raw Material

  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers

Personnel (Manpower) Requirements

  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery

  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances &Equipments
  • Laboratory Equipments& Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations

  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram

Infrastructure and Utilities

  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
  • Assumptions for Profitability workings
  • Plant Economics
  • Production Schedule
  • Land & Building
    Factory Land & Building
    Site Development Expenses
  • Plant & Machinery
    Indigenous Machineries
    Other Machineries (Miscellaneous, Laboratory etc.)
  • Other Fixed Assets
    Furniture & Fixtures
    Pre-operative and Preliminary Expenses
    Technical Knowhow
    Provision of Contingencies
  • Working Capital Requirement Per Month
    Raw Material
    Packing Material
    Lab & ETP Chemical Cost
    Consumable Store
  • Overheads Required Per Month And Per Annum
    Utilities & Overheads (Power, Water and Fuel Expenses etc.)
    Royalty and Other Charges
    Selling and Distribution Expenses
  • Salary and Wages
  • Turnover Per Annum
  • Share Capital
    Equity Capital
    Preference Share Capital
  • Annexure 1:: Cost of Project and Means of Finance
  • Annexure 2:: Profitability and Net Cash Accruals
    Revenue/Income/Realisation
    Expenses/Cost of Products/Services/Items
    Gross Profit
    Financial Charges
    Total Cost of Sales
    Net Profit After Taxes
    Net Cash Accruals
  • Annexure 3 :: Assessment of Working Capital requirements
    Current Assets
    Gross Working. Capital
    Current Liabilities
    Net Working Capital
    Working Note for Calculation of Work-in-process
  • Annexure 4 :: Sources and Disposition of Funds
  • Annexure 5 :: Projected Balance Sheets
    ROI (Average of Fixed Assets)
    RONW (Average of Share Capital)
    ROI (Average of Total Assets)
  • Annexure 6 :: Profitability ratios
    D.S.C.R
    Earnings Per Share (EPS)
  • Debt Equity Ratio
  • Annexure 7 :: Break-Even Analysis
    Variable Cost & Expenses
    Semi-Var./Semi-Fixed Exp.
    Profit Volume Ratio (PVR)
    Fixed Expenses / Cost
    B.E.P
  • Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
    Resultant N.P.B.T
    Resultant D.S.C.R
    Resultant PV Ratio
    Resultant DER
    Resultant ROI
    Resultant BEP
  • Annexure 12 :: Shareholding Pattern and Stake Status
    Equity Capital
    Preference Share Capital
  • Annexure 13 :: Quantitative Details-Output/Sales/Stocks
    Determined Capacity P.A of Products/Services
    Achievable Efficiency/Yield % of Products/Services/Items
    Net Usable Load/Capacity of Products/Services/Items
    Expected Sales/ Revenue/ Income of Products/ Services/ Items
  • Annexure 14 :: Product wise domestic Sales Realisation
  • Annexure 15 :: Total Raw Material Cost
  • Annexure 16 :: Raw Material Cost per unit
  • Annexure 17 :: Total Lab & ETP Chemical Cost
  • Annexure 18 :: Consumables, Store etc.,
  • Annexure 19 :: Packing Material Cost
  • Annexure 20 :: Packing Material Cost Per Unit
  • Annexure 21 :: Employees Expenses
  • Annexure 22 :: Fuel Expenses
  • Annexure 23 :: Power/Electricity Expenses
  • Annexure 24 :: Royalty & Other Charges
  • Annexure 25 :: Repairs & Maintenance Exp.
  • Annexure 26 :: Other Mfg. Expenses
  • Annexure 27 :: Administration Expenses
  • Annexure 28 :: Selling Expenses
  • Annexure 29 :: Depreciation Charges – as per Books (Total)
  • Annexure 30 :: Depreciation Charges – as per Books (P & M)
  • Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
  • Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
  • Annexure 33 :: Interest and Repayment - Term Loans
  • Annexure 34 :: Tax on Profits
  • Annexure 35 ::Projected Pay-Back Period And IRR
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.