WhatsApp us
Request a Quote

Food and Agro Processing

Edible Oil Refinery Consultant

NPCS helps you plan a refinery from crude oil intake to packed oil, with technology, machinery, approvals and finance worked out for your site.

  • Since 1994
  • 1,50,000+ clients
  • 85 countries
  • 5,000+ project reports
  • ISO 9001:2015 certified
Raw materials
Crude oil or oilseeds for the expeller/solvent route, bleaching earth, phosphoric acid
Key approvals
FSSAI licence, Registration and monthly returns under the Vegetable Oil Products, Production and Availability Order, 2011, Legal Metrology
Schemes
National Mission on Edible Oils, State food-processing incentives
Indicative investment
~₹10–50 crore (30–100 TPD refinery)

Discuss Your Edible Oil Refinery Project

Share your plan and our consultant will call you back within 24 hours.

Selected Assignments for Well-Known Companies

Assignments for companies in this sector, from NPCS's published client list.

  • Aditya Birla Management Corporation
    Pre-feasibility report on cashew nut processing2014
  • UPL
    Market research report on the bakery industry2018
  • DCM Shriram Industries
    Techno-economic viability study on synthetic camphor2019
  • Tata Steel
    Project report on iron powder2015
  • JSW Steel
    Project report on aluminium alloy from virgin metal2009
  • ITC (Agri Business Division)
    Techno-economic project report on nicotine from tobacco waste2014
  • Godrej & Boyce
    Project report on autoclaved aerated concrete (AAC) blocks2015
  • Grasim Industries (Century Rayon)
    Techno-economic study on cellulosic cellophane film2022

India imports most of its edible oil, so refiners who buy crude well and sell packed oil to distributors, modern trade and HoReCa buyers have steady demand. A good edible oil refinery consultant helps you decide the route, size and approvals before you commit capital. NPCS has advised entrepreneurs on such plants since 1994. Our team prepares the edible oil refinery project report, selects machinery and guides you through licensing, so your plan stands up to lenders and to the market.

Edible Oil Refinery at a Glance

Typical capacity~30–300+ TPD
Land~2–6 acres
Power load~200 kW–1 MW
WaterModerate–high, cooling, soapstock splitting, vacuum system; ETP needed
Manpower~30–120
Indicative investment~₹10–50 crore (30–100 TPD refinery)

Investment basis: refinery section, tank farm, utilities, packing; excludes land and oil stock.

Figures are indicative ranges. Your project report works them out for your capacity and location.

Market Demand for Edible Oil Refineries in India

Demand for refined oil rises with per-capita consumption and the shift from loose oil to branded packed oil. Refiners are concentrated near ports and oilseed belts, such as the Kandla and Mundra belt in Gujarat, Kakinada in Andhra Pradesh, Rajasthan, Madhya Pradesh and Maharashtra. Exports are low, apart from some rice bran oil, so your market is mainly domestic.

  • Distributors and modern trade for packed retail oil
  • HoReCa and institutional buyers for tins and bulk
  • Snack, bakery and namkeen makers
  • Vanaspati and bakery fat producers

Edible Oil Products You Can Make

Most new refiners start with one or two high-volume oils, such as soybean or palmolein, and sell them in pouches or jars. Rice bran and sunflower need dewaxing, which adds equipment. Kachi ghani mustard follows the expeller route and suits a smaller, separate unit.

  • Refined soybean, sunflower, rice bran, palm/palmolein, groundnut and cottonseed oil
  • Blended edible oils
  • Physically or chemically refined
  • Kachi ghani mustard (unrefined, expeller route)

Edible Oil Refinery Process and Quality Control

The edible oil refinery process removes gums, free fatty acids, colour and odour from crude oil in stages. You choose between chemical refining, which uses caustic soda to neutralise acids, and physical refining, which strips them by steam under vacuum. Bleaching earth then takes out colour, and deodorisation leaves the oil odourless. Quality is checked at each stage through free fatty acid, peroxide value, colour, moisture and iodine value, and the final oil must meet FSSAI standards. Blended oils also need correct labelling.

  1. Crude oil storage
  2. Degumming
  3. Neutralisation (chemical) or physical refining
  4. Bleaching
  5. Filtration
  6. Deodorisation under vacuum
  7. Dewaxing/winterisation (sunflower, rice bran)
  8. Storage
  9. Blending
  10. Packing

Raw Materials and Machinery for an Edible Oil Refinery

Your main input is crude oil, bought domestically or imported through ports like Kandla, Mundra, Haldia, Kakinada and Chennai. You also need bleaching earth, phosphoric acid, caustic soda and packaging. The deodoriser and vacuum system decide oil quality, while the boiler or thermic heater and effluent treatment plant keep the line running and compliant.

  • Storage tanks
  • Degumming and neutralising reactors
  • Bleacher
  • Filters
  • Deodoriser
  • Vacuum system
  • Boiler/thermic heater
  • Cooling tower
  • Filling lines
  • ETP

Edible Oil Refinery Licence and Approvals

Start with business registration, then secure the State Pollution Control Board consent to establish before construction. Refineries fall in the Orange category, while a plain expeller unit without a boiler or refining is Green. Apply for the FSSAI licence, State or Central by capacity, and register under the Vegetable Oil Products Order, 2011. Consent to operate follows construction.

  • Legal Metrology for packed goods
  • Boiler approval under IBR
  • PESO licence if a hexane solvent plant is attached
  • EPR for plastic packaging
Pollution categoryOrange, CPCB Jan-2025 classification report, Annexure-I S.No. 113.1 (vegetable oil incl. solvent extraction and refinery); oil ghani/expeller without boiler or refining: Green (113.2)
HSN code1507–1515 (by oil type); 1517 (blended fats, vanaspati)
GST5% on edible vegetable oils
BIS / quality control orderNo mandatory QCO; Agmark optional
FSSAIFSSAI licence, State or Central depending on installed capacity
Other licencesRegistration and monthly returns under the Vegetable Oil Products, Production and Availability (Regulation) Order, 2011; Legal Metrology; boiler (IBR); PESO licence for hexane if a solvent plant is attached; EPR for plastic packaging

Choosing the Right Edible Oil Refinery Technology

Physical refining suits low-gum oils such as palm and uses less chemical, while chemical refining handles a wider range of crude quality. Batch plants cost less and fit smaller capacities, but continuous plants give steadier quality and lower refining loss at higher volumes. You can also build a standalone refinery or integrate it with an expeller or solvent plant to control crude supply.

Choosing the Right Edible Oil Refinery Plant Size

Capacity ranges from about 30 TPD to over 300 TPD, and investment typically runs about ₹10–50 crore for a 30–100 TPD refinery. Smaller units need less working capital and land, but they feel thin margins sooner. Larger plants spread utilities and manpower over more tonnes, yet need stronger crude buying and distribution.

Government Schemes and Project Finance for Edible Oil Refineries

The National Mission on Edible Oils supports oilseeds and oil palm on the raw material side, and state food-processing incentives may apply to your plant. PMEGP suits small expeller units. NPCS reports are used for bank loans and programmes such as PMEGP, MSME schemes, Mudra and NABARD-linked projects, subject to each lender's requirements.

What Decides Success in an Edible Oil Refinery

Successful refiners buy crude against import parity, keep refining loss low and build a brand with reliable distribution. Plan for these risks as well.

  • Import duty volatility
  • Thin refining margins
  • Competition from large players
  • Adulteration enforcement
  • Sell soapstock, spent bleaching earth and distillates to improve returns

How NPCS Helps You Set Up an Edible Oil Refinery

Our team works on the decisions that shape your refinery: capacity, chemical or physical refining, machinery specifications and vendor selection. We support plant layout, production process guidance, installation and commissioning, and map the approvals you need. We also prepare bankable reports and feasibility studies for your lender.

NPCS's published client list records 14 assignments on edible oil and refinery projects between 2011 and 2025 for clients in 7 states and 4 countries, including detailed project reports, bankable project reports and techno-economic feasibility studies.

What Your Edible Oil Refinery Project Report Covers

  • Project introduction and BIS specifications
  • Manufacturing process with flow sheet
  • Market survey (demand, imports/exports, existing units)
  • Personnel
  • Plant and machinery with suppliers
  • Land and building with layout
  • Raw materials with sources and rates
  • Financials (project cost, working capital, cost of production, profitability, break-even, 5–10 year cash flow, projected balance sheet, IRR/NPV/payback)

Edible Oil Refinery: Frequently Asked Questions

How much does it cost to set up an edible oil refinery?

A 30–100 TPD refinery typically needs about ₹10–50 crore. This is indicative and covers the refinery section, tank farm, utilities and packing. It excludes land and oil stock. Your project report works out the exact figure for your capacity.

Which licences and pollution category apply to an edible oil refinery?

A refinery falls in the Orange category under the CPCB classification. You also need an FSSAI licence, registration under the Vegetable Oil Products Order, 2011, Legal Metrology and boiler approval. A solvent plant adds a PESO licence.

How much land and power does an edible oil refinery need?

Plants typically need about 2–6 acres and a power load of roughly 200 kW to 1 MW, depending on capacity. Water use is moderate to high because of cooling, soapstock splitting and the vacuum system, so an effluent treatment plant is required.

How do I start an edible oil refinery business?

Fix your capacity, oil type and refining route first. Then secure crude supply, apply for consent to establish, order machinery and obtain the FSSAI licence. A detailed project report ties these steps together and supports your loan application.

How can NPCS help with my edible oil refinery?

NPCS prepares the project report, advises on technology and machinery, and guides you through approvals and finance planning. Share your capacity, oil type and location, and our team will outline the project cost and the next steps.

Plan Your Edible Oil Refinery With NPCS

Share your planned capacity, oil type and location, and our team will outline the project cost and approvals for your refinery.

Call Us WhatsApp