WhatsApp us
Request a Quote

Renewable Energy

Compressed Biogas (CBG) Plant Consultant

NPCS helps you plan a CBG project, from feedstock and technology choice to approvals, offtake and a bank-ready project report.

  • Since 1994
  • 1,50,000+ clients
  • 85 countries
  • 5,000+ project reports
  • ISO 9001:2015 certified
Raw materials
Paddy straw, napier grass, press mud
Key approvals
PESO licences, CTE/CTO, Offtake agreement with oil marketing company
Schemes
SATAT, Compressed biogas blending obligation for city gas networks, phased up year by year
Indicative investment
~₹20–120 crore depending on TPD and feedstock

Discuss Your Compressed Biogas (CBG) Plant Project

Share your plan and our consultant will call you back within 24 hours.

Selected Assignments for Well-Known Companies

Assignments from NPCS's published client list.

  • Tata Steel
    Project report on iron powder2015
  • JSW Steel
    Project report on aluminium alloy from virgin metal2009
  • ITC (Agri Business Division)
    Techno-economic project report on nicotine from tobacco waste2014
  • Godrej & Boyce
    Project report on autoclaved aerated concrete (AAC) blocks2015
  • Aditya Birla Management Corporation
    Pre-feasibility report on cashew nut processing2014
  • Grasim Industries (Century Rayon)
    Techno-economic study on cellulosic cellophane film2022
  • Thermax (Chemical Division)
    Feasibility report on absorbent polymers for industrial use2024
  • UPL
    Market research report on the bakery industry2018

A compressed biogas (CBG) plant turns organic waste into vehicle and industrial fuel, and it is set up mostly by agri-businesses, sugar mills, dairies and energy investors. Gas goes to oil marketing companies and city gas distributors, while the digestate sells as organic manure. A compressed biogas (CBG) plant consultant like NPCS helps you test feedstock, pick the technology, line up approvals and prepare a project report that lenders can read.

Compressed Biogas (CBG) Plant at a Glance

Typical capacity~2–20 TPD CBG
Land~5–15 acres incl. feedstock storage
Power loadHigh, upgrading and compression
WaterModerate–high in wet digestion; digestate liquid recycled
Manpower~30–80 plus feedstock collection
Indicative investment~₹20–120 crore depending on TPD and feedstock

Investment basis: digesters, upgrading, compression, FOM handling, feedstock storage; excludes land.

Figures are indicative ranges. Your project report works them out for your capacity and location.

Market Demand for CBG Plants in India

Demand for CBG in India is policy-led and the buyers are large. SATAT targets, the blending obligation for city gas networks, net-zero goals and the push to end stubble burning all point the same way. Plants cluster where feedstock is dense, mainly in Punjab, Haryana, Uttar Pradesh, Maharashtra, Gujarat and Madhya Pradesh. Export potential is low, so this is a domestic fuel business.

  • Oil marketing companies buying CBG for automotive outlets
  • City gas distributors needing CBG for blending
  • Industries using CBG as fuel
  • Farmers buying fermented organic manure

CBG and Manure Products You Can Make

A CBG plant sells two things: gas for vehicles or pipeline injection, and fermented organic manure (FOM) in solid and liquid form. Gas suits oil companies and city gas networks. Manure suits farmers, and treating it as a real product protects your margins.

  • CBG for vehicles/pipeline injection
  • Fermented organic manure (FOM) and liquid FOM

Compressed Biogas (CBG) Plant Process

The compressed biogas (CBG) plant process starts with feedstock storage and pre-treatment, then anaerobic digestion, where bacteria break down waste without oxygen to make biogas. Straw needs the most pre-treatment, so digestion performance depends on it. The gas is cleaned of H2S, upgraded to high-methane gas by VPSA, membrane or water scrubbing, and compressed for cascades or pipeline injection.

Quality is checked at the gas stage against IS 16087 for methane, H2S and moisture. Digestate is separated and processed into manure under Fertiliser Control Order norms. Wet or dry digestion is a key early choice.

  1. Feedstock collection and storage
  2. Pre-treatment
  3. Anaerobic digestion
  4. H2S removal
  5. Upgrading (VPSA/membrane/water scrubbing)
  6. Compression and cascade filling or pipeline injection
  7. Digestate separation
  8. FOM drying and packing

Raw Materials and Machinery for a CBG Plant

Feedstock can be paddy straw, Napier grass, press mud, cattle dung, food waste, municipal organic waste or distillery spent wash. Straw comes from the Punjab and Haryana belts, press mud from sugar mills, and dung from dairies and gaushalas. The machines that matter most are the digesters, the upgrading unit and the compressors, since they set uptime and gas quality.

  • Feedstock handling
  • Digesters
  • Gas holder
  • Scrubber
  • Upgrading unit
  • Compressors
  • Cascades
  • Solid-liquid separator
  • FOM dryer and bagging

Compressed Biogas (CBG) Plant Licence and Approvals

Start with feedstock agreements and the offtake agreement with an oil marketing company, then apply for consent to establish (CTE) from the State Pollution Control Board before construction. Consent to operate (CTO) follows once the plant is built. The pollution category depends on feedstock and digestate handling, from Red to Orange, and in some cases White or Blue.

  • PESO licences for storage, compression and dispensing
  • FCO registration to sell manure
  • IS 16087 for CBG fuel quality
Pollution categoryCPCB Jan-2025 CPCB S.No. 67: CBG on MSW or process waste (press mud, effluents) = Red; on crop residue or animal waste = Orange; plants converting all digestate into FOM/LFOM per gazette norms with no wastewater discharge can be White (SPCB verifies case by case); MSW bio-methanation run as an essential environmental service can fall under Blue (Annexure-II)
HSN code2711 29 (CBG, gaseous hydrocarbon); 3101 (fermented organic manure)
GSTBiogas plants and devices: 5% (from 12%) w.e.f. 22-09-2025. GST on CBG output depends on its classification under HSN 2711 and the buyer; NPCS applies the current rate in the project financials
BIS / quality control orderIS 16087 specification for CBG fuel quality
Other licencesPESO licences (storage, compression, dispensing); CTE/CTO; offtake agreement with oil marketing company; FCO registration to sell FOM

Securing Feedstock for Your CBG Plant

Paddy straw is available only in October and November, so a straw-based plant must store enough for the whole year. That ties up land, working capital and fire-safety planning. Many developers blend straw with press mud, dung or Napier grass to smooth supply and cost. Signing feedstock supply early, and checking digester performance on each material, lowers the biggest risk in the project.

Choosing the Right CBG Plant Size

Plant size runs from about 2 to 20 TPD of CBG, and indicative investment from about ₹20–120 crore, excluding land. Small units need less feedstock and land but spread fixed costs over less gas. Larger plants need about 5–15 acres with feedstock storage and a dependable supply radius. Your report tests the right size against the feedstock you can lock in.

Government Schemes and Project Finance for CBG

SATAT gives assured offtake through oil marketing companies, and the blending obligation for city gas networks supports demand. MNRE's waste-to-energy programme, GOBARdhan and Market Development Assistance for FOM may also apply. NPCS reports are used for bank loans and programmes such as PMEGP, MSME schemes, Mudra and NABARD-linked projects, subject to each lender's requirements.

What Decides Success in a CBG Plant

Good operators lock in feedstock and storage early, keep the plant running, and sell manure as well as gas. The main risks are feedstock logistics and cost, digester performance on straw, a weak FOM market and working capital.

  • Bankable offtake before construction
  • Sustained plant uptime
  • FOM and liquid FOM sold to farmers
  • CO2 capture as an extra revenue option

How NPCS Helps You Set Up a CBG Plant

NPCS works through the decisions that shape a CBG project: capacity, wet or dry digestion, upgrading technology, machinery and vendor selection, and plant layout. Our team also supports production process guidance, installation and commissioning assistance, and the approvals sequence. You get a compressed biogas (CBG) plant project report built for your feedstock, location and lender.

NPCS's published client list records 6 assignments on compressed biogas projects between 2024 and 2026 for clients in 5 states, including bankable project reports and techno-economic feasibility studies.

What Your Compressed Biogas (CBG) Plant Project Report Covers

  • Project introduction and BIS specifications
  • Manufacturing process with flow sheet
  • Market survey (demand, imports/exports, existing units)
  • Personnel
  • Plant and machinery with suppliers
  • Land and building with layout
  • Raw materials with sources and rates
  • Financials (project cost, working capital, cost of production, profitability, break-even, 5–10 year cash flow, projected balance sheet, IRR/NPV/payback)

Compressed Biogas (CBG) Plant: Frequently Asked Questions

What is the compressed biogas (CBG) plant setup cost in India?

Indicative investment is about ₹20–120 crore, depending on TPD capacity and feedstock. This covers digesters, upgrading, compression, FOM handling and feedstock storage, but excludes land. Your project report works out the figure for your capacity and location.

Which pollution category applies to a CBG plant?

It depends on feedstock. CBG on municipal waste or process waste such as press mud is Red, and on crop residue or animal waste it is Orange. Plants turning all digestate into manure with no wastewater discharge can be White, as verified by the State Pollution Control Board.

How much land and power does a CBG plant need?

Plan on about 5–15 acres including feedstock storage. Power load is high because upgrading and compression use the most electricity. Water need is moderate to high in wet digestion, though the digestate liquid is recycled.

How to start a compressed biogas (CBG) plant business?

Begin by securing feedstock and an offtake arrangement, then choose technology and capacity. Next prepare a project report, apply for CTE and PESO licences, arrange finance and build. NPCS can support each of these steps.

How does NPCS help with a CBG project?

NPCS prepares detailed project reports, techno-economic feasibility studies and bankable reports for CBG projects. Our team also guides machinery selection, vendor selection, layout and approvals. Share your feedstock and planned TPD, and we will outline the next steps.

Plan Your Compressed Biogas (CBG) Plant With NPCS

Share your planned TPD, feedstock and location, and our team will outline the project cost, approvals and offtake options for your CBG plant.

Call Us WhatsApp