Plant capacity
7,90,000 cans per day
Total project cost
₹9,092 lakh
Plant and machinery
₹5,185 lakh
Return on investment
14% (Year 3)
Break-even
44% of capacity
Payback period
About 4.5 years

Figures from our illustrative sample report for a typical unit. They show the format of an NPCS report and are not quotes for your project.

What is a aluminium cans project report?

An aluminium cans project report is a detailed project report (DPR) for a plant that turns aluminium coil into printed, lacquered two-piece cans for beer and soft drinks. It sets out the can-making line, raw materials, buyers, BIS certification, project cost, means of finance, five-year projections, DSCR and break-even.

Promoters and packaging companies use it to size a can line and raise a term loan; lenders and investors use it to judge whether the plant can repay.

Also known as: aluminium beverage cans project report, project report on aluminium cans, two-piece can plant DPR, aluminium cans business plan.

Aluminium cans manufacturing plant cost in India

Our sample report models one two-piece line rated at 7,90,000 cans per day, or 26,07,00,000 cans a year over 330 working days. It starts at 60% of capacity and reaches 80% in Year 5, selling each can with a bought-in end at ₹7.88 before GST.

₹9,092 lakhTotal project cost
₹14,380 lakhSales in Year 3
₹1,247 lakhNet profit in Year 3
1.99Average DSCR
Cost of project (₹ lakh)
Land and site development568.28
Building and civil works1,630.70
Plant and machinery5,185.05
Other fixed assets641.91
Contingencies340.79
Preliminary and pre-operative209.17
Working capital margin515.85
Total9,091.75
Means of finance (₹ lakh)
Promoter's contribution (25%)2,272.94
Term loan from bank (75%)6,818.81
Cash credit limit (separate)1,547.54
Total project cost9,091.75

Term loan at 10.5% with a 12-month moratorium and 84 monthly instalments. All figures are illustrative; multi-line plants cost many times more.

Aluminium cans manufacturing process, step by step

A beverage can body is made from one disc of metal with no side seam. The line runs continuously, so each machine is sized to keep pace with the bodymakers.

  1. Cupping

    Coil is unwound, coated with a thin lubricant and blanked into shallow cups, several at a time, in a cupping press.

  2. Drawing and wall ironing

    Each bodymaker redraws the cup and pushes it through ironing rings that thin the wall, then forms the domed base that resists internal pressure.

  3. Trimming

    The wavy top edge left by ironing is cut off so every body is the same height for the necker.

  4. Washing and drying

    A multi-stage washer strips the lubricant and conditions the surface so coatings stick, followed by a drying oven.

  5. Decorating

    The decorator applies a base coat and prints the brand design with over varnish in one pass; a pin oven cures the ink.

  6. Inside spraying

    Spray guns coat the inside with a food-grade lacquer, cured in an oven, so the drink never touches bare aluminium.

  7. Necking and flanging

    The open end is narrowed in a series of dies to take a smaller end, and a flange is rolled for the filler's seamer.

  8. Testing and palletising

    Every can passes a light tester for pinholes and a camera check, then is stacked on pallets with tier sheets.

Which can-making route fits your plant?

Most of the cost decisions are made before the machinery order. These are the choices a project report should settle first.

Two-piece drawn and wall ironed lineCoil-fed line for 330 ml and 500 ml beverage cans. This is the route in our sample report and the one beer and soft drink fillers buy from.
Make or buy the endsOur sample buys ends with tabs ready made. An end line needs its own shell presses, conversion presses and lining machines, and pays back only at high volume.
Impact-extruded cansAerosol and bottle-shaped cans are made from slugs, not coil, on slower lines. They serve personal care and pharma fillers, so they need a separate report.
Can sizes on one lineChanging between 330 ml and 500 ml means tooling changes on the bodymakers and necker. Fix the size mix with your buyers before you size the line.
New or refurbished lineA refurbished line lowers machinery cost, but tooling condition, spare parts and the BIS factory inspection must be checked before you rely on it.

Raw materials for aluminium cans

Can body coil is a special thin, hard-temper sheet, bought from rolling mills in India or imported. Its price follows the London Metal Exchange aluminium price plus a conversion premium, so suppliers usually quote it on a formula rather than a fixed rate.

Raw materialShare of costYear 3 (₹ lakh)
Aluminium can body coil (3104 alloy)66%5,776.94
Can ends with tabs (bought in)24%2,100.71
Internal lacquer and external base coat5%437.65
Printing inks and over varnish3%262.59
Cupping lubricant and washer chemicals2%175.06
Total100%8,752.95

In our sample, raw materials are 60.9% of sales in Year 3. A report should test how a rise in the aluminium price moves profit and DSCR.

Aluminium can making machinery and its cost

The bodymakers are the largest single item in our sample, followed by the decorator. Together they take about 40% of the machinery budget.

MachineWhat it doesSample cost (₹ lakh)
Uncoiler, lubricator and cupping pressFeeds coil and blanks it into cups622.21
BodymakersDraw and iron cups into tall bodies1,244.41
TrimmersCut bodies to exact height259.25
Can washer and drying ovenRemove lubricant, prepare the surface466.66
Decorator with base coater and pin ovenPrint and cure the outside design829.61
Inside spray machines and curing ovenLine the inside with lacquer466.65
Necker flangerNarrow the top and form the flange674.06
Light tester, camera inspection and palletiserReject faulty cans, stack pallets362.95
Conveyors, compressed air and lubricant systemsMove cans and serve the line259.25
Total plant and machinery5,185.05

Costs are the sample report's estimates for one line. Get current quotations, including tooling and spares, before you finalise.

Utilities and manpower for a can plant

A can line runs round the clock, which shapes the shift pattern, the power supply and the maintenance team.

Working pattern330 days a year with continuous shifts, as in our sample report
Manpower in the sample229 people: 34 in management and supervision, 80 skilled operators and 115 semi-skilled and unskilled workers
Power and fuel₹563.99 lakh in Year 3, about 3.9% of sales, for presses, ovens, compressors and lighting
Thermal loadWasher dryer, pin oven and inside-bake oven need steady heat; the fuel choice changes running cost
Compressed air and waterAir drives can transfer and rejection; treated water feeds the washer, and its effluent needs treatment
MaintenanceIroning rings, punches and decorator blankets wear and are replaced on a schedule, so keep a tooling room on site

BIS certification and approvals for aluminium cans

Aluminium beverage cans now fall under a Quality Control Order, so certification belongs in the project plan, not after it.

BIS certificationIS 14407:2023, aluminium cans for beverages, under a Quality Control Order; BIS lists enforcement from 1 April 2027 (checked October 2026)
Business registrationUdyam and GST registration. With plant and machinery of ₹5,185 lakh, the sample plant sits in the medium enterprise band, which goes up to ₹125 crore of investment
Pollution board consentConsent to establish and operate from the State Pollution Control Board, covering coating fumes from the ovens and washer effluent
Factory licenceUnder the Factories Act and state rules, with fire NOC for the ovens and solvent stores
Buyer approvalBrand owners audit the plant and approve each can size and print before regular supply starts

Who buys aluminium cans in India

Demand comes from beer and soft drink brands moving more volume into cans, and from newer drinks such as energy drinks, ready-to-drink coffee and sparkling water. Fillers still import part of their cans, and BIS certification will favour plants that can supply certified cans close to the filling line.

  • Breweries and beer bottlers
  • Soft drink and energy drink fillers
  • Ready-to-drink tea, coffee and juice brands
  • Packaged and sparkling water brands
  • Contract canning and co-packing units

Plan for the summer peak: beer and soft drink sales rise sharply in the hot months, so fillers want stock built ahead. A report should show where finished cans are stored and how that stock is financed.

Mistakes that weaken an aluminium cans project report

  • Pricing cans without saying whether the end is included

    An end is a large part of the cost. Mixing up body-only and complete-can prices makes revenue and margin wrong.

  • Assuming full output from the first month

    New lines take time to reach speed, and start-up spoilage is high. Projections should ramp up, as the sample does from 60%.

  • Fixing the coil price

    Can body coil follows the aluminium market. A single fixed price hides the biggest risk to DSCR.

  • Leaving out BIS lead time

    Without certification the plant cannot sell after the QCO date, so testing and inspection must be in the schedule.

  • Thin working capital

    Imported coil, summer stock and 45 days of buyer credit tie up cash; in our sample, receivables are the largest current asset.

How NPCS helps you plan an aluminium can plant

  • Line size and can mixMatch line speed and 330 ml or 500 ml sizes to the fillers you can supply.
  • Machinery and toolingCompare new and refurbished lines, and list tooling and spares to budget.
  • Bank-ready project reportProjections, DSCR and working capital tested for aluminium price swings.
  • BIS and approvals planCertification steps, pollution consent and plant layout for your state.

NPCS's client list shows 4 assignments for aluminium can projects, and NPCS has prepared project reports for engineering and metal product units since 1994.

What's inside the aluminium cans sample report

  1. Introduction
  2. Uses and applications
  3. Market potential
  4. Manufacturing process
  5. Raw materials
  6. Plant and machinery
  7. Land, building and utilities
  8. Manpower
  9. Licences and approvals
  10. Project cost and means of finance
  11. Working capital
  12. Projected profitability
  13. Cash flow statement
  14. Projected balance sheet
  15. Depreciation
  16. Term loan repayment
  17. Debt service coverage
  18. Break-even analysis
  19. Financial ratios
  20. Key assumptions
  21. Conclusion
  22. Monthly loan repayment schedule

19 pages, five-year projections, illustrative figures.

Open sample report

Free sample or a report for your project?

What you getFree sampleNPCS report for your project
Capacity and locationTypical unitYour capacity, site and state
FiguresIllustrativeBuilt on current prices and quotations
Machinery suppliers and quotationsNoYes
Market survey for your regionNoYes
Bank or scheme format (PMEGP, term loan)NoYes
Use for a loan applicationNoYes

Real NPCS aluminium cans project reports

These are aluminium cans project reports NPCS has prepared, with the plant capacity, total capital investment, rate of return and break-even worked out in each. Costs have moved since some were written, so we bring any of them up to date for your capacity and location.

Project reportPlant capacityTotal investmentRate of returnBreak-evenAction
Aluminium Ingots From Used Beverage Cans1000 Kg /day₹2.98 crore24%51% Get this report
Aluminium CansAluminium Cans for Brewery: 15,000,000 Pcs./Annum Aluminium Scraps (Waste): 50,000 Kgs./Annum₹7.12 crore27%48% Get this report
Aluminium Cans for Brewery15,050,000 Pcs. /annum₹7.12 crore26%47% Get this report
Aluminium Beverage CansAluminium Beverage Cans : 1,000 thousand Nos/Day₹29.57 crore26%46% Get this report
Aluminium Cans for Beverages (Two Pieces)Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum₹77.6 crore28%40% Get this report
Aluminium Cans for Beer and BeveragesAluminium Beverage Cans each 330 ml Size:13.3 Lakh Pcs. / day₹399 crore23%36% Get this report

Figures as worked out in each NPCS report. Total investment includes plant and machinery, land and building, and working capital.

Find other projects that fit your budget Search NPCS project profiles by investment, return and break-even, the same search as our Startup Selector.

What clients say about NPCS

4.7

264 Google reviews, as of 20 Oct 2026

Clients most often mention

  • feasibility reports 18
  • project report 16
  • helpful for startups 15
  • detailed reports 8
Read all reviews on Google
  • Excellent experience with Niir Project Consultancy Services. Their Techno-Economic Feasibility Reports are incredibly detailed and backed by solid market data.

    Piyush Singh, Google review, 2026

  • Niir Project Consultancy Services offers excellent guidance for business setup. Their market survey and feasibility reports saved us a lot of time and helped us make informed decisions. Highly recommended

    Saroj Yadav, Google review, 2026 View on Google

  • In an era of information overload, NIIR stands out for its precision. Their technical consultancy and market feasibility studies are world-class.

    Shrishti Gautam, Google review, 2026

  • NIIR Project Consultancy Services provides useful books and reports for students, entrepreneurs, and small businesses. Their content is easy to understand and focuses on practical ideas for starting and managing industries. Overall, NIIR is helpful for learning about business and project planning.

    Raj Yadav, Google review, 2026

Aluminium Cans project report: frequently asked questions

How much does an aluminium can manufacturing plant cost in India?

Our sample report models one two-piece line making 7,90,000 cans per day at a total project cost of ₹9,092 lakh, with ₹5,185 lakh for plant and machinery. As an indicative guide, a single refurbished line can cost less and a multi-line plant far more. Your report works out the cost for your line speed, can sizes, site and state.

What raw material is used to make aluminium cans?

Can bodies are made from aluminium can body coil, usually 3104 alloy, which is 66% of raw material cost in our sample report. Most single-line plants buy ends with tabs ready made; in the sample they are 24% of raw material cost. Inside lacquer, outside coatings, inks, lubricant and washer chemicals make up the rest.

Which machines are needed for aluminium can manufacturing?

A two-piece line starts with an uncoiler, cupping press, bodymakers that draw and iron the wall, and trimmers. A can washer and drying oven, a decorator with pin oven and inside spray machines with a curing oven follow. A necker flanger, light tester, camera inspection and palletiser finish the line. In our sample the bodymakers are the largest machinery cost.

Is BIS certification mandatory for aluminium beverage cans?

Yes. Aluminium cans for beverages are covered by IS 14407:2023 under a Quality Control Order, and BIS lists the enforcement date as 1 April 2027 (checked October 2026). After that date cans must carry the BIS Standard Mark under a licence. Plan the factory inspection and testing into your project schedule, because fillers will not buy uncertified cans.

Is aluminium can manufacturing profitable?

In our illustrative sample, the plant earns a 14% return on investment in Year 3, breaks even at about 44% of capacity and pays back in about 4.5 years. Profit is sensitive to the price of can body coil, line efficiency, spoilage during start-up and how well the plant fills its summer peak. These figures are not a forecast for your project.

Can a small unit make aluminium beverage cans?

Not economically. Beverage cans come off high-speed lines that need large, steady orders from breweries and soft drink fillers, so even one line is an industrial investment. Smaller press units make other aluminium containers, such as food trays or tins. If your budget is modest, a project report helps you compare those options before you commit.

Is the sample report free and can I use it for a loan?

The sample is free to view and download. It is an illustrative report that shows the format and depth of an NPCS report. Its figures are representative and not based on a real project, so it should not be submitted to a bank. For a loan, NPCS prepares a report for your own capacity, location and finance plan.

Sources and references

  1. Upcoming QCOs notified and due for implementation (IS 14407:2023, aluminium cans for beverages)Bureau of Indian Standards, checked Oct 2026
  2. Govt notifies revised criteria for classifying MSMEsAll India Radio News, Prasar Bharati, checked Oct 2026
Ajay Kumar Gupta, founder of NPCS

Who prepares NPCS reports

The NPCS project team, led by Ajay Kumar Gupta

This page and its sample report are prepared and reviewed by the NPCS project team, which has written techno-economic feasibility studies and detailed project reports since 1994.

Ajay Kumar Gupta founded Niir Project Consultancy Services (NPCS) and leads the organisation. With 40 years of experience in MSME project consulting, he has built the team that has delivered more than 28,000 project reports for clients worldwide, helping entrepreneurs plan and finance profitable manufacturing businesses.

Ajay Kumar Gupta on LinkedIn

Published
Last updated
Next review
Oct 2027
Reviewed by
NPCS project team

This page is reviewed every 12 months, or sooner when scheme limits, GST rates, BIS rules or pollution categories change. The sample report is illustrative: its figures are generated from industry-typical ratios for a unit of this size, checked so every statement balances, and are not taken from any client project.

Planning a different engineering project?

These are a few of the projects we advise on. NPCS's published client list records 35 engineering assignments, so tell us what you are planning.

Tell us your project

Recent engineering assignments

  • Aakash Textile Engineers LLP
    Techno-Economic Feasibility Report on Steel Containers (Cargo Containers)Surat, 2026
  • Sigma Search Lights Ltd
    Pre-Feasibility Report on Steel ContainerKolkata, 2026
  • D Chandresh Steels Pvt Ltd
    Detailed Feasibility Study on Continuous Sandwich PanelsMumbai, 2026
  • Krishna Defence & Allied Industries Ltd
    Pre-Feasibility Report on Steel containersPanchmahal, 2026
  • RVPR Constructions Private Limited
    Bankable Project Report on Fabrication & Painting of Industrial Steel Structures with Pre-Hyderabad, 2025
  • Shreem Marutinandan Logistics Private Limited
    Pre-Feasibility Report on Steel containerSri Potti Sriramulu Nellore, 2024
  • Globecon Commercial Services Pvt Ltd
    Project Report on Seaworthy ContainersMumbai, 2022
  • Golden Horn Containers Hub Private Limited
    Industrial Project Report on ISO Freight ContainersNavi Mumbai, 2022

Get a aluminium cans project report for your plant

Tell us your planned capacity, location and loan scheme. Our team will confirm the scope and price of a report built on current machinery quotations and raw material prices for your region.

Reports are prepared in the format banks and PMEGP offices ask for, with five-year projections, DSCR and break-even.

Request a Aluminium Cans Project Report

Share your plan and our team will call you back within 24 hours.

Start with the sample, then plan your own unit

Open the free aluminium cans sample report to see the format, then talk to NPCS about a report for your capacity and location.

Sample PDF WhatsApp
Aluminium Cans sample project report (illustrative) Download New tab

Illustrative sample. Figures are representative and not from a real project.

Call Us WhatsApp