Deck Wood (Wood and Plastic Composite) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Detailed Project Report, Business Plan for Manufacturing Plant
Well-Documented Business Plan
Aids in securing funding and is proven to help businesses grow up to 30% faster.
Validate Your Business Idea
We clear your doubts and validate your concept. Weak plans are a common cause of failure.
In-Depth Market Research
We analyze market potential and high industry demand for optimal growth and success.
Well-Documented Business Plan
Validate Your Business Idea
In-Depth Market Research
iture, logistics, packaging and other industries. According to the plastic material, there are mainly PVC wood products, PE wood products, HDPE wood composite products etc. Wood plastic composites (WPCs) are composite materials made of wood fiber/flour and thermoplastic(s) (includes PE, PP, PVC etc.).Chemical additives, as a third composition component, are practically invisible (except mineral fillers and pigments, if added) in the composite structure. They provide for almost complete integration of polymer and wood flour (powder) while facilitating optimal processing conditions. In addition to wood fiber and plastic, WPCs can also contain other ligno cellulosic and inorganic filler materials. WPCs are a subset of a larger category of materials called natural fiber plastic composites (NFPCs), which may contain no cellulose based fiber fillers such as pulp fibers, peanut hulls, bamboo, straw, digestate, etc. Plastic lumber products began appearing in Indian markets in the late 1980s. Its development was stimulated both by the rising volume of largely un recycled plastic waste for which uses were needed as well as by increasing consumer interest in more durable, lower maintenance outdoor products such as decking and fencing. The major selling points for composite lumber are that it is free of potentially hazardous chemicals, and made largely from long lasting, low maintenance, recycled materials. It is, often promoted as an environmentally preferable or green alte
ative to other decking materials. In this paper we examine the performance of wood plastic composite (WPC) decking and its environmental properties. Uses & Application Wood plastic composites are still new materials relative to the long history of natural lumber as a building material. The most widespread use of WPCs in North America is in outdoor deck floors, but it is also used for railings, fences, landscaping timbers, cladding and siding, park benches, molding and trim, window and door frames, and indoor fu
iture. Wood plastic composites were first introduced into the decking market in the early 1990s. Manufacturers claim that wood plastic composite is more environmentally friendly and requires less maintenance than the alte
atives of solid wood treated with preservatives or solid wood of rot resistant species. These materials can be molded with or without simulated wood grain details. Market Survey Wood Plastic Composites (WPCs) are defined as composite materials that contain thermoplastics and wood in various forms. Mostly, either the polymer or the fiber, or both, can come from recycled materials. Because of the limited thermal stability of wood, only plastics that can be processed at temperatures below 392 degrees Fahrenheit are used in WPCs. The average product carries about 50% wood, generally in particulate form, such as wood flour or very short fibers. WPCs represent one of the rapidly growing markets within the plastics industry. Double digit growth is expected through 2011 for WPCs used as replacement for treated wood in building products and related applications. However, WPC lumber will see much faster growth through 2011, posting gains of 14.3% pa to reach US$2.6. Composite lumber demand will be fueled by strong demand in decking applications. In addition, rapid growth in windows and door applications, as well as smaller niche end uses (porches, site and leisure fu
iture) will support demand going forward. Among the major product categories window and door applications for WPCs are anticipated to post the most rapid gains through 2011. As with other applications, WPC window and door components are making inroads because of their lower maintenance requirements, durability in exterior applications and similarities to wood. Decking applications are projected to see strong gains through 2011, continuing to increase its relative share of the composite and plastic lumber industry.
| Plant capacity | Plant & machinery | Working capital | Cost of Project | T.C.I | Return | Break even |
|---|---|---|---|---|---|---|
| 5 MT/Day | 80 Lakhs | - | Cost of Project : 382 Lakhs | 29.00% | 56.00% |
We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.
Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.
| COST OF PROJECT | MEANS OF FINANCE | ||||||
|---|---|---|---|---|---|---|---|
| Particulars | Existing | Proposed | Total | Particulars | Existing | Proposed | Total |
| Land & Site Development Exp. | ********** | ********** | ********** | Capital | ********** | ********** | ********** |
| Buildings | ********** | ********** | ********** | Share Premium | ********** | ********** | ********** |
| Plant & Machineries | ********** | ********** | ********** | Other Type Share Capital | ********** | ********** | ********** |
| Motor Vehicles | ********** | ********** | ********** | Reserves & Surplus | ********** | ********** | ********** |
| Office Automation Equipments | ********** | ********** | ********** | Cash Subsidy | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | Internal Cash Accruals | ********** | ********** | ********** |
| Franchise & Other Deposits | ********** | ********** | ********** | Long/Medium Term Borrowings | ********** | ********** | ********** |
| Preliminary & Pre-operative Exp | ********** | ********** | ********** | Debentures / Bonds | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** | Unsecured Loans/Deposits | ********** | ********** | ********** |
| Margin Money - Working Capital | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Total | ********** | ********** | ********** | Total | ********** | ********** | ********** |
| PARTICULARS | OPERATING YEARS | ||||
|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| ********** | ********** | ********** | ********** | ********** | |
| Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| Gross Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Less : Excise Duties/Levies | ********** | ********** | ********** | ********** | ********** |
| Net Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Total Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Expenses/Cost of Products/Services/Items | ********** | ********** | ********** | ********** | ********** |
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** |
| Indigenous | ********** | ********** | ********** | ********** | ********** |
| Total Nett Consumption | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** |
| Sub Total of Net Consumption | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expenses | ********** | ********** | ********** | ********** | ********** |
| Depreciation | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance Exp. | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** |
| Cost of Output of Goods Sold | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Gross Profit | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowing | ********** | ********** | ********** | ********** | ********** |
| On Wkg. Capital Borrowings | ********** | ********** | ********** | ********** | ********** |
| Total Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** |
| Total Cost of Sales | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** |
| Tax on Profit | ********** | ********** | ********** | ********** | ********** |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Depreciation Added Back | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Net Cash Accruals | ********** | ********** | ********** | ********** | ********** |
| PARTICULARS | EXISTING | PROPOSED | TOTAL |
|---|---|---|---|
| COST OF PROJECT | |||
| Land & Site Development Exp. | |||
| Land Area Required | ********** | ********** | ********** |
| Land Development Cost, Boundary Wall, Gate & Road etc. | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Buildings | ********** | ********** | ********** |
| Factory Building - | ********** | ********** | ********** |
| Office Buildings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Plant & Machineries | ********** | ********** | ********** |
| Indigenous Machineries | ********** | ********** | ********** |
| Erection & Installation | ********** | ********** | ********** |
| Laboratory Equipments | ********** | ********** | ********** |
| Miscellaneous Equipments like pumps, valves, pipeline & fittings | ********** | ********** | ********** |
| Imported Machineries | ********** | ********** | ********** |
| Technical know how | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Office Vehicles | ********** | ********** | ********** |
| Office Automation Equipments (Telephone/ Fax/ Computer) | ********** | ********** | ********** |
| Office Equipment, Furniture plus Other Equipment & Accessories | ********** | ********** | ********** |
| Other Misc. Assets | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Pre-operative & Preliminary Expenses | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Capital Cost of Project | ********** | ********** | ********** |
| Margin Money for Working Capital | ********** | ********** | ********** |
| Total Cost of Project | ********** | ********** | ********** |
| PARTICULARS | STK.PRD. | STK.PRD. | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|---|---|
| 1st Year | 2nd Yr &+ | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Capacity | Months | Months | % | ********** | ********** | ********** | ********** | ********** |
| CURRENT ASSETS | ********** | ********** | ********** | ********** | ********** | |||
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** | |||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | |||
| Indigenous | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Packing Material | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Consumable Store | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Work-in-Process | ********** | ********** | D | ********** | ********** | ********** | ********** | ********** |
| Finished Goods | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Current Expenses | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | ||
| Total | ********** | ********** | ********** | ********** | ********** | |||
| Cash/Bank Balances | ********** | ********** | ********** | ********** | ********** | |||
| Gross Wkg. Capital | ********** | ********** | ********** | ********** | ********** | |||
| PARTICULARS | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Profit Percentages to Net Sales | ||||||
| Gross Profit | ********** | ********** | ********** | ********** | ********** | |
| % Of G.P. to Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.B.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.A.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ||||||
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Exp | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ||||||
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) | ********** | ********** | ********** | ********** | ********** | |
| Parameters | ||||||
| Initial Equity Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Credit Balance in P & L | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Capital exclUnsec Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Equity incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings from Bank | ********** | ********** | ********** | ********** | ********** | ********** |
| Term lia. Incl Unsecured Deposit | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ||||||
| I.E.Total Term Lia./NW | ||||||
| Unsecured Dep. as Equity | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. as Debt | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | |
| Assets Turnover Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| No. of Shares of 10.00 each | ********** | ********** | ********** | ********** | ********** | |
| Earnings Per Share (EPS) (in) | ********** | ********** | ********** | ********** | ********** | |
| Proposed divident | ********** | ********** | ********** | ********** | ********** | |
| Cash EPS (in) | ********** | ********** | ********** | ********** | ********** | |
| Dividend Per Share(DPS) (in) | ********** | ********** | ********** | ********** | ********** | |
| Payout Ratio (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings/Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Book Value Per Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Debt Per Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Probable Mkt. Price/Share(in) | ********** | ********** | ********** | ********** | ********** | |
| Price / Book Value (x) | ********** | ********** | ********** | ********** | ********** | |
| Price Earnings Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| Yield (%Age) | ********** | ********** | ********** | ********** | ********** | |
| PARTICULARS | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|
| Ratio | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| BREAK EVEN ANALYSIS | ||||||
| Total Value of Output | ********** | ********** | ********** | ********** | ********** | |
| Variable Cost & Expenses | ||||||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Sales Commission/Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Sub-total | ********** | ********** | ********** | ********** | ********** | |
| Less: W.I.P. Adjustments | ********** | ********** | ********** | ********** | ********** | |
| Total Variable Cost | ********** | ********** | ********** | ********** | ********** | |
| Net Contribution | ********** | ********** | ********** | ********** | ********** | |
| Profit Volume Ratio (%) | ********** | ********** | ********** | ********** | ********** | |
| Semi-Var./Semi-Fixed Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Interest on Wkg.Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Semi-Var./Fixed Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Fixed Expenses / Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Fixed Borrowing | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Working Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Deferred Expenses W/Off | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Fixed Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Fixed/Semi-Fixed Exp | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Cash Fixed/SemiFixed | ********** | ********** | ********** | ********** | ********** | ********** |
| Cash Break Even Sales | ********** | ********** | ********** | ********** | ********** | ********** |
| Cash Margin of Safety | ********** | ********** | ********** | ********** | ********** | ********** |
| Break Even Sales | ********** | ********** | ********** | ********** | ********** | ********** |
| Margin of safety | ********** | ********** | ********** | ********** | ********** | ********** |
| At Maximum Utilisation : | Year | ********** | ********** | ********** | ********** | ********** |
| (as % of Installed Capacity) | ||||||
| Cash B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| MEANS OF FINANCE | |||
|---|---|---|---|
| Equity Share Capital | ********** | ********** | ********** |
| Others - Preference Share Capital | ********** | ********** | ********** |
| Total Equity Share Capital | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Long/Medium Term Borrowings | ********** | ********** | ********** |
| FROM BANK | ********** | ********** | ********** |
| From Other Financial Institutions | ********** | ********** | ********** |
| Total Long/Medium Term Borrowings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Means of Finance | ********** | ********** | ********** |
| PARTICULARS | OPERATING YEARS | ||||
|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Equity Share Capital | ********** | ********** | ********** | ********** | ********** |
| Surplus of Previous Year | ********** | ********** | ********** | ********** | ********** |
| Add : Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Surplus at the End of Year | ********** | ********** | ********** | ********** | ********** |
| Unsecured Deposits | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings Proposed-FROM BANK | ********** | ********** | ********** | ********** | ********** |
| Bank Borrowing for Wkg. Capital | ********** | ********** | ********** | ********** | ********** |
| Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Sundry Creditors | ********** | ********** | ********** | ********** | ********** |
| Other Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Total Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| ASSETS | ********** | ********** | ********** | ********** | ********** |
| Fixed Assets | ********** | ********** | ********** | ********** | ********** |
| Gross Block | ********** | ********** | ********** | ********** | ********** |
| Less : Depreciation to Date | ********** | ********** | ********** | ********** | ********** |
| Net Block | ********** | ********** | ********** | ********** | ********** |
| Current Assets | ********** | ********** | ********** | ********** | ********** |
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | ********** | ********** | ********** |
| Other Current Assets | ********** | ********** | ********** | ********** | ********** |
| Cash and Bank Balances | ********** | ********** | ********** | ********** | ********** |
| Total Current Assets | ********** | ********** | ********** | ********** | ********** |
| P & P Exp. and/or Other Dvp.Exp. | ********** | ********** | ********** | ********** | ********** |
| (To The Extent Not W/Off) | ********** | ********** | ********** | ********** | ********** |
| Other Non Current Assets | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Assets | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Fixed Assets) | ********** | ********** | ********** | ********** | ********** |
| RONW (Average of Share Capital) | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Total Assets) | ********** | ********** | ********** | ********** | ********** |
INTEREST AND REPAYMENT ON TERM LOANS
| A | Name of Institution-Bank | ABC BANK | |
|---|---|---|---|
| B | Term Borrowing Amount | ********** | xx |
| C | Repayment Term (Years) | ********** | Years |
| D | Repayment Instalments | ********** | Instalments |
| E | Repayment Commencement | Year - 0; 3rd Qtr. | |
| F | Rate of Interest(General) | xxxx% | p.a. |
| G | Rate of Interest(Initial) | 0.00% | p.a. |
| H | Apply Gen. Int. Rate from Year | x Quarter :: x | |
| I | Interest Calculation | Quarterly |
| Debt Service Coverage Ratio | ||||||
|---|---|---|---|---|---|---|
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Expenses | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ********** | ********** | ********** | ********** | ********** | |
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** |
DEPRECIATION CHARGES AS PER BOOKS (TOTAL)
| Operating Year | F.Assets Type A-1 | F.Assets Type A-2 | F.Assets Type B | F.Assets Type C | F.Assets Type D-1 | F.Assets Type D-2 | Total |
|---|---|---|---|---|---|---|---|
| Particulars | Factory Building | Office Buildings | Plant & Machinery | Office Vehicles | Office Automation Equipments (Telephone/ Fax/ Computer) | Furniture & Fixtures | |
| 1-2 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 2-3 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 3-4 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 4-5 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 5-6 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Particulars | Method | Deprn.Rate | Part Consideration (for Asset put to use less than xx months) |
|---|---|---|---|
| Type A :: Buildings | |||
| Factory Building - | WDV | ********** | ********** |
| Office Buildings | WDV | ********** | ********** |
| Type C | |||
| Office Vehicles | WDV | ********** | ********** |
| Type D :: Misc. Fixed Assets | |||
| Office Automation Equipments (Telephone/ Fax/ Computer) | WDV | ********** | ********** |
| Furniture & Fixtures | WDV | ********** | ********** |
| Type B :: Plant & Machineries |
| Projected Pay Back Period | |||||
|---|---|---|---|---|---|
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Year | 1 | 2 | 3 | 4 | 5 |
| Initial Investment | ********* | ||||
| Total Initial Investment | ********* | ||||
| Yearly Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Pay Back Period | xx Years xx Months | xx Years xx months | |||
| Projected IRR | |||||
|---|---|---|---|---|---|
| Year | CFAT | PV factor @**% | ********* | ||
| Initial Investment | ********* | ********* | ********* | ||
| 1-2 | ********* | ********* | ********* | ||
| 2-3 | ********* | ********* | ********* | ||
| 3-4 | ********* | ********* | ********* | ||
| 4-5 | ********* | ********* | ********* | ||
| 5-6 | ********* | ********* | ********* | ||
| Total PV | ********* | ********* | |||
| IRR | ********* | ********* | |||
NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.
Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.
NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.
Need Assistance?
Share your details, and we will call you back.