STEEL PROJECT (IRON, SPONGE IRON TO BILLET TO RODS) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Plant Layout
Detailed Project Report, Business Plan for Manufacturing Plant
Well-Documented Business Plan
Aids in securing funding and is proven to help businesses grow up to 30% faster.
Validate Your Business Idea
We clear your doubts and validate your concept. Weak plans are a common cause of failure.
In-Depth Market Research
We analyze market potential and high industry demand for optimal growth and success.
Well-Documented Business Plan
Validate Your Business Idea
In-Depth Market Research
ace – LD converter route, scrap, or DRI based electric arc flame route. Sponge iron is a substitute for scrap in the electric arc fu
ace, which can be easily manufactured from indigenously available raw materials at very competitive price. Billet refers to a cast semi finished products. It is also referred to as ingot, particularly for smaller sizes. A billet is typically cast to a rectangular, hexagonal or round cross, section compatible with secondary processing e.g. forming or milling. It can be produced either as coil or cut lengths. Billets are collectively known as bar stock. The liberalization of industrial policy and other initiatives taken by the gove
ment have given a definite impetus for entry, participation and growth of the private sector in the steel industry. While the existing units are being expanded, a large number of new steel plants have also come up in different parts of the country based on mode
, cost effective, state of-the-art technologies. At present, total steel making capacity is over 34 million tonnes in India, the 8th largest producer of steel in the world, has to its credit, the capability to produce a variety of grades and that too, of inte
ational quality standards. As per the ratings of the prestigious “world steel Dynamics; Indian HR products are classified in the Tier II category quality products a major reason behind their acceptance in the world market. Although the Indian steel industry enjoyed the advantage of cheap and high quality iron ore and manganese, its limited accessibility to the supply of coking coal was a constraint. The adoption of the sponge iron route by the emerging private sector integrated plants helped not only in circumventing the constraint, but also witnessed a technological revolution of sorts by the industry. As a result, India enjoys a cost advantage compared to some countries. India produced 34 mn tonnes of steel in 2003-04. Of this, 5 mn tonnes were exported. China had a world record production of 220 mn tonnes of steel in 2003-04. Global demand for steel in 2004-05, is expected to be up 6.2% to approximately 920 mn tonnes from over 860 mn tonnes in the previous year. There has been a spurt in the world demand of steel since the 2003. The industry in India has also witnessed a boom period with price realisation getting higher and higher. Exports have reinforced the trend. Exports of Iron and Steel during (April-January) 2003-04 rose by 31.5% to $ 1.85 bn, against $ 1.4 bn in the corresponding period of the preceding year. The Ninth Five Year Plan (1997-2002) had projected a demand for steel at 39 mn tonnes at the end of the plan period. This was to involve an investment in the sector of around Rs 250 bn in the last five years. The production of finished steel increased from 13.5 mn tonnes in 1990-91 to nearly 27 mn tonnes in 1999-00. The year 2000-01 witnessed an estimated production of nearly 29.5 mn tonnes. The production realised at the end of the Ninth Plan was 31.63 mn tonnes. In view of the recessionary conditions experienced prior to 2003-04, the Tenth Plan did not foresee setting up of additional capacities in the public sector. This, however, does not foreclose the options of further investments at the enterprise level. In fact, the scenario has changed and SAIL has prepared an ambitious plan of expansion. So there is very good domestic as well as export market for steel project. New entrepreneurs can well venture into this field. Few Indian Major Players are as under: A H W Steels Ltd. A S R Multimetals Pvt. Ltd. Aarti Steels Ltd. Aditya Ispat Ltd. Ankit Metal & Power Ltd. Arun Smelters Ltd. Ashiana Ispat Ltd. Assam Roofing Ltd. Balmukund Concast Ltd. Beekay Steel Inds. Ltd. Bellary Steels & Alloys Ltd. Bhartia Commercial Co. Ltd. Bhushan Steel Ltd. Brand Alloys Ltd. Charminar Steels Ltd. Chase Bright Steel Ltd. Deccan Alloys Pvt. Ltd. Dina Iron & Steel Ltd. G K Steel & Allied Inds. Ltd. G K W Ltd. Gallantt Metal Ltd. Gangotri Iron & Steel Co. Ltd. Gi
ar Impex Ltd. Goa Ispat Ltd. Golden Rathi Star Inds. Ltd. Goldstar Metals Ltd. Govind Mills Ltd. Govind Steel & Power Ltd. Goyal Ispat Ltd. Handum Industries Ltd. India Steel Works Ltd. India Tube Mills & Metal Inds. Ltd. Indian Bright Steel Co. Ltd. Indian Steel Rolling Mills Ltd. Indore Steel & Iron Mills Ltd. Ipisteel Ltd. Jai Balaji Inds. Ltd. Jai Bhawani Steel Enterprises Ltd. Jai Raj Ispat Ltd. Juhi Alloys Ltd. K L Concast Pvt. Ltd. K R Steelunion Ltd. Kalindi Steels & Engg. Works Ltd. Kalyani Carpenter Special Steels Ltd. Kamachi Steels Ltd. Kamani Tubes Ltd. Kamdhenu Ispat Ltd. Kanishk Steel Inds. Ltd. Kundil Ispat Ltd. M S P Steel & Power Ltd. Magnum Steels Ltd. Mangal Steel Enterprises Ltd. Met-Rolla Steels Ltd. Mode
Steels Ltd. Mohan Ferro Alloys Ltd. Mukand Ltd. N H K Spring India Ltd. N R Inte
ational Ltd. Nalwa Steel & Power Ltd. National General Inds. Ltd. Partap Steel Rolling Mills (1935) Ltd. Peekay Re-Rolling Mills Pvt. Ltd. Pondy Metal & Rolling Mills Pvt. Ltd. Premier Ispat Ltd. Prestige Stocks & Bonds Ltd. Progressive Steels (India) Ltd. Purvi Bharat Steels Ltd. R H L Profiles Ltd. R R Ispat Ltd. R S L Industries Ltd. (Duplicate Name, Uttar Pradesh) Radice Ispat (India) Ltd. Ramsarup Industries Ltd. Ramsarup Vyapaar Ltd. Rashtriya Ispat Nigam Ltd. Rathi Bars Ltd. Rathi Steel & Power Ltd. Raymond Ltd. Rukma Industries Ltd. S K M Steels Ltd. S M C Power Generation Ltd. S P S Steels Rolling Mills Ltd. Shimoga Steels Ltd. Shobhagya Steels Ltd. Shree Sanyeeji Ispat Ltd. Shree Sidhbali Steels Ltd. Shree Vaishnav Ispat Pvt. Ltd. Shri Bhagavati Bright Bars Ltd. Shri Rathi Steels Ltd. Sirhind Steel Ltd. Somani Swiss Inds. Ltd. Sonal Vyapar Ltd. Sree Metaliks Ltd. Sri Vasavi Inds. Ltd. Stainless India Ltd. Steel Exchange India Ltd. Sumangala Steel Pvt. Ltd. Super Inducto Steels Ltd. Surana Industries Ltd. Tata Steel Ltd. Thapar Concast Ltd. Torus India Ltd. Trichy Steel Rolling Mills Ltd. Unique Intercontinental Ltd. Upper India Steel Mfg. & Engg. Co. Ltd. Usha Iron & Ferro Metals Corpn. Ltd. V V S Alloys Ltd. Vaibhav Mercantile Ltd. Vijaya Steels Ltd. Vikash Metal & Power Ltd. Vinayaga Vyapar Ltd. Viraj Profiles Ltd. Vishwas Infocom Inds. Ltd. Volvo Steels Ltd.
| Plant capacity | Plant & machinery | Working capital | Cost of Project | T.C.I | Return | Break even |
|---|---|---|---|---|---|---|
| 1020000 MT/Annum Steel Round Section | 987 Crores | - | Cost of Project : 1175 Crores | 46.00% | 54.00% |
We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.
Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.
| COST OF PROJECT | MEANS OF FINANCE | ||||||
|---|---|---|---|---|---|---|---|
| Particulars | Existing | Proposed | Total | Particulars | Existing | Proposed | Total |
| Land & Site Development Exp. | ********** | ********** | ********** | Capital | ********** | ********** | ********** |
| Buildings | ********** | ********** | ********** | Share Premium | ********** | ********** | ********** |
| Plant & Machineries | ********** | ********** | ********** | Other Type Share Capital | ********** | ********** | ********** |
| Motor Vehicles | ********** | ********** | ********** | Reserves & Surplus | ********** | ********** | ********** |
| Office Automation Equipments | ********** | ********** | ********** | Cash Subsidy | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | Internal Cash Accruals | ********** | ********** | ********** |
| Franchise & Other Deposits | ********** | ********** | ********** | Long/Medium Term Borrowings | ********** | ********** | ********** |
| Preliminary & Pre-operative Exp | ********** | ********** | ********** | Debentures / Bonds | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** | Unsecured Loans/Deposits | ********** | ********** | ********** |
| Margin Money - Working Capital | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Total | ********** | ********** | ********** | Total | ********** | ********** | ********** |
| PARTICULARS | OPERATING YEARS | ||||
|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| ********** | ********** | ********** | ********** | ********** | |
| Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| Gross Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Less : Excise Duties/Levies | ********** | ********** | ********** | ********** | ********** |
| Net Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Total Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Expenses/Cost of Products/Services/Items | ********** | ********** | ********** | ********** | ********** |
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** |
| Indigenous | ********** | ********** | ********** | ********** | ********** |
| Total Nett Consumption | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** |
| Sub Total of Net Consumption | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expenses | ********** | ********** | ********** | ********** | ********** |
| Depreciation | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance Exp. | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** |
| Cost of Output of Goods Sold | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Gross Profit | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowing | ********** | ********** | ********** | ********** | ********** |
| On Wkg. Capital Borrowings | ********** | ********** | ********** | ********** | ********** |
| Total Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** |
| Total Cost of Sales | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** |
| Tax on Profit | ********** | ********** | ********** | ********** | ********** |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Depreciation Added Back | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Net Cash Accruals | ********** | ********** | ********** | ********** | ********** |
| PARTICULARS | EXISTING | PROPOSED | TOTAL |
|---|---|---|---|
| COST OF PROJECT | |||
| Land & Site Development Exp. | |||
| Land Area Required | ********** | ********** | ********** |
| Land Development Cost, Boundary Wall, Gate & Road etc. | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Buildings | ********** | ********** | ********** |
| Factory Building - | ********** | ********** | ********** |
| Office Buildings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Plant & Machineries | ********** | ********** | ********** |
| Indigenous Machineries | ********** | ********** | ********** |
| Erection & Installation | ********** | ********** | ********** |
| Laboratory Equipments | ********** | ********** | ********** |
| Miscellaneous Equipments like pumps, valves, pipeline & fittings | ********** | ********** | ********** |
| Imported Machineries | ********** | ********** | ********** |
| Technical know how | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Office Vehicles | ********** | ********** | ********** |
| Office Automation Equipments (Telephone/ Fax/ Computer) | ********** | ********** | ********** |
| Office Equipment, Furniture plus Other Equipment & Accessories | ********** | ********** | ********** |
| Other Misc. Assets | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Pre-operative & Preliminary Expenses | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Capital Cost of Project | ********** | ********** | ********** |
| Margin Money for Working Capital | ********** | ********** | ********** |
| Total Cost of Project | ********** | ********** | ********** |
| PARTICULARS | STK.PRD. | STK.PRD. | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|---|---|
| 1st Year | 2nd Yr &+ | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Capacity | Months | Months | % | ********** | ********** | ********** | ********** | ********** |
| CURRENT ASSETS | ********** | ********** | ********** | ********** | ********** | |||
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** | |||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | |||
| Indigenous | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Packing Material | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Consumable Store | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Work-in-Process | ********** | ********** | D | ********** | ********** | ********** | ********** | ********** |
| Finished Goods | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Current Expenses | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | ||
| Total | ********** | ********** | ********** | ********** | ********** | |||
| Cash/Bank Balances | ********** | ********** | ********** | ********** | ********** | |||
| Gross Wkg. Capital | ********** | ********** | ********** | ********** | ********** | |||
| PARTICULARS | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Profit Percentages to Net Sales | ||||||
| Gross Profit | ********** | ********** | ********** | ********** | ********** | |
| % Of G.P. to Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.B.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.A.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ||||||
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Exp | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ||||||
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) | ********** | ********** | ********** | ********** | ********** | |
| Parameters | ||||||
| Initial Equity Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Credit Balance in P & L | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Capital exclUnsec Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Equity incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings from Bank | ********** | ********** | ********** | ********** | ********** | ********** |
| Term lia. Incl Unsecured Deposit | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ||||||
| I.E.Total Term Lia./NW | ||||||
| Unsecured Dep. as Equity | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. as Debt | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | |
| Assets Turnover Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| No. of Shares of 10.00 each | ********** | ********** | ********** | ********** | ********** | |
| Earnings Per Share (EPS) (in) | ********** | ********** | ********** | ********** | ********** | |
| Proposed divident | ********** | ********** | ********** | ********** | ********** | |
| Cash EPS (in) | ********** | ********** | ********** | ********** | ********** | |
| Dividend Per Share(DPS) (in) | ********** | ********** | ********** | ********** | ********** | |
| Payout Ratio (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings/Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Book Value Per Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Debt Per Share (in) | ********** | ********** | ********** | ********** | ********** | |
| Probable Mkt. Price/Share(in) | ********** | ********** | ********** | ********** | ********** | |
| Price / Book Value (x) | ********** | ********** | ********** | ********** | ********** | |
| Price Earnings Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| Yield (%Age) | ********** | ********** | ********** | ********** | ********** | |
| PARTICULARS | OPERATING YEARS | |||||
|---|---|---|---|---|---|---|
| Ratio | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| BREAK EVEN ANALYSIS | ||||||
| Total Value of Output | ********** | ********** | ********** | ********** | ********** | |
| Variable Cost & Expenses | ||||||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Sales Commission/Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Sub-total | ********** | ********** | ********** | ********** | ********** | |
| Less: W.I.P. Adjustments | ********** | ********** | ********** | ********** | ********** | |
| Total Variable Cost | ********** | ********** | ********** | ********** | ********** | |
| Net Contribution | ********** | ********** | ********** | ********** | ********** | |
| Profit Volume Ratio (%) | ********** | ********** | ********** | ********** | ********** | |
| Semi-Var./Semi-Fixed Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Interest on Wkg.Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Semi-Var./Fixed Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Fixed Expenses / Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Fixed Borrowing | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Working Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Deferred Expenses W/Off | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Fixed Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Fixed/Semi-Fixed Exp | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Cash Fixed/SemiFixed | ********** | ********** | ********** | ********** | ********** | ********** |
| Cash Break Even Sales | ********** | ********** | ********** | ********** | ********** | ********** |
| Cash Margin of Safety | ********** | ********** | ********** | ********** | ********** | ********** |
| Break Even Sales | ********** | ********** | ********** | ********** | ********** | ********** |
| Margin of safety | ********** | ********** | ********** | ********** | ********** | ********** |
| At Maximum Utilisation : | Year | ********** | ********** | ********** | ********** | ********** |
| (as % of Installed Capacity) | ||||||
| Cash B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| MEANS OF FINANCE | |||
|---|---|---|---|
| Equity Share Capital | ********** | ********** | ********** |
| Others - Preference Share Capital | ********** | ********** | ********** |
| Total Equity Share Capital | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Long/Medium Term Borrowings | ********** | ********** | ********** |
| FROM BANK | ********** | ********** | ********** |
| From Other Financial Institutions | ********** | ********** | ********** |
| Total Long/Medium Term Borrowings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Means of Finance | ********** | ********** | ********** |
| PARTICULARS | OPERATING YEARS | ||||
|---|---|---|---|---|---|
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Equity Share Capital | ********** | ********** | ********** | ********** | ********** |
| Surplus of Previous Year | ********** | ********** | ********** | ********** | ********** |
| Add : Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Surplus at the End of Year | ********** | ********** | ********** | ********** | ********** |
| Unsecured Deposits | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings Proposed-FROM BANK | ********** | ********** | ********** | ********** | ********** |
| Bank Borrowing for Wkg. Capital | ********** | ********** | ********** | ********** | ********** |
| Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Sundry Creditors | ********** | ********** | ********** | ********** | ********** |
| Other Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Total Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| ASSETS | ********** | ********** | ********** | ********** | ********** |
| Fixed Assets | ********** | ********** | ********** | ********** | ********** |
| Gross Block | ********** | ********** | ********** | ********** | ********** |
| Less : Depreciation to Date | ********** | ********** | ********** | ********** | ********** |
| Net Block | ********** | ********** | ********** | ********** | ********** |
| Current Assets | ********** | ********** | ********** | ********** | ********** |
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | ********** | ********** | ********** |
| Other Current Assets | ********** | ********** | ********** | ********** | ********** |
| Cash and Bank Balances | ********** | ********** | ********** | ********** | ********** |
| Total Current Assets | ********** | ********** | ********** | ********** | ********** |
| P & P Exp. and/or Other Dvp.Exp. | ********** | ********** | ********** | ********** | ********** |
| (To The Extent Not W/Off) | ********** | ********** | ********** | ********** | ********** |
| Other Non Current Assets | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Assets | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Fixed Assets) | ********** | ********** | ********** | ********** | ********** |
| RONW (Average of Share Capital) | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Total Assets) | ********** | ********** | ********** | ********** | ********** |
INTEREST AND REPAYMENT ON TERM LOANS
| A | Name of Institution-Bank | ABC BANK | |
|---|---|---|---|
| B | Term Borrowing Amount | ********** | xx |
| C | Repayment Term (Years) | ********** | Years |
| D | Repayment Instalments | ********** | Instalments |
| E | Repayment Commencement | Year - 0; 3rd Qtr. | |
| F | Rate of Interest(General) | xxxx% | p.a. |
| G | Rate of Interest(Initial) | 0.00% | p.a. |
| H | Apply Gen. Int. Rate from Year | x Quarter :: x | |
| I | Interest Calculation | Quarterly |
| Debt Service Coverage Ratio | ||||||
|---|---|---|---|---|---|---|
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Expenses | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ********** | ********** | ********** | ********** | ********** | |
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Total | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** |
DEPRECIATION CHARGES AS PER BOOKS (TOTAL)
| Operating Year | F.Assets Type A-1 | F.Assets Type A-2 | F.Assets Type B | F.Assets Type C | F.Assets Type D-1 | F.Assets Type D-2 | Total |
|---|---|---|---|---|---|---|---|
| Particulars | Factory Building | Office Buildings | Plant & Machinery | Office Vehicles | Office Automation Equipments (Telephone/ Fax/ Computer) | Furniture & Fixtures | |
| 1-2 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 2-3 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 3-4 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 4-5 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| 5-6 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Particulars | Method | Deprn.Rate | Part Consideration (for Asset put to use less than xx months) |
|---|---|---|---|
| Type A :: Buildings | |||
| Factory Building - | WDV | ********** | ********** |
| Office Buildings | WDV | ********** | ********** |
| Type C | |||
| Office Vehicles | WDV | ********** | ********** |
| Type D :: Misc. Fixed Assets | |||
| Office Automation Equipments (Telephone/ Fax/ Computer) | WDV | ********** | ********** |
| Furniture & Fixtures | WDV | ********** | ********** |
| Type B :: Plant & Machineries |
| Projected Pay Back Period | |||||
|---|---|---|---|---|---|
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Year | 1 | 2 | 3 | 4 | 5 |
| Initial Investment | ********* | ||||
| Total Initial Investment | ********* | ||||
| Yearly Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Pay Back Period | xx Years xx Months | xx Years xx months | |||
| Projected IRR | |||||
|---|---|---|---|---|---|
| Year | CFAT | PV factor @**% | ********* | ||
| Initial Investment | ********* | ********* | ********* | ||
| 1-2 | ********* | ********* | ********* | ||
| 2-3 | ********* | ********* | ********* | ||
| 3-4 | ********* | ********* | ********* | ||
| 4-5 | ********* | ********* | ********* | ||
| 5-6 | ********* | ********* | ********* | ||
| Total PV | ********* | ********* | |||
| IRR | ********* | ********* | |||
NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.
Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.
NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.
Need Assistance?
Share your details, and we will call you back.