Recovery of Ferric oxide (Fe2O3) & Titanium Dioxide (TiO2) from Bauxite Processing Waste

Recovery of Ferric oxide (Fe2O3) & Titanium Dioxide (TiO2) from Bauxite Processing Waste. Wealth from Waste Ferric oxide (Fe? O?) is an inorganic compound also known as hematite. Ferric oxide is used in the iron industry in the manufacturing of alloys and steel. The Food and Drug Administration (FDA) has approved ferric oxide pigment for use in cosmetics. Moreover, ferric oxide granules are used in the form of filtration media for removing phosphates in saltwater aquariums. The global titanium dioxide market size was valued at USD 15.76 billion in 2018 and is expected to witness a CAGR of 8.7% from 2019 to 2025 In addition, high demand for anti-corrosive architectural coatings in the pigments has increased the demand for titanium dioxide. FOR Fe2O3 ? In iron industries for producing steel and alloys ? Ferric oxide powder, also called jeweler’s rouge, is used for polishing lenses and metallic jewelry ? Its granular form is used as a filtration media for pulling out phosphates in saltwater aquariums ? As FDA-approved Pigment Brown 6 and Pigment Red 101, for use in cosmetics. ? In biomedical applications, because its nanoparticles are non-toxic and biocompatible Recovery of Fe2O3 Fe2O3 is another material in red mud that has attracted a number of researchers. Until now, there are three means to recover iron from red mud: smelting, solid-state reduction and magnetic separation. In smelting process, red mud is charged into blast furnace or rotary furnace with a reducing agent. Then, iron oxide in red mud is reduced to generate pig iron that can be used in steel production. However, smelting process has some demerits. High energy and capital costs are associated with blast furnace (BF) operation because scale of operation is high. Red mud must be mixed with some good-grade iron ore to maintain the minimum grade of the charge to BF. In addition, titanium reacts with other constituents of the slag to form multiple oxides that are difficult to leach. In the solid-state reduction process, the mud is mixed with a reducing agent or contacted with a reducing gas to produce metallic iron. The product can be an input either in a steel-making furnace or a conventional blast furnace. Compared to smelting process, solid-state reduction process consumes less energy. But, it also has some disadvantages. First, the metallic iron produced is quite difficult to separate from the rest of product. So, it is easily polluted by gangue materials. Second, the product is in a very fine form. The recovery rate of Fe2O3 was 45% (weight percent). Another means is to convert hematite or goethite in red mud to magnetite firstly, which is followed with magnetic separation. Obviously, this process is more complex than magnetic separation. Advantages. Goethite is easier to separate magnetically and needs less energy to reduce compared to hematite. So, the extra cost of reducing hematite to magnetite can be compensated by the energy difference between reducing hematite and magnetite to metallic iron. Titanium Dioxide, also known as titanium (IV) oxide or titanic, is a white crystalline powder, made up of limonite and rutile, which are used as the main raw materials. It is created using either the chloride process or sulfuric acid, referred to as the sulfate process. Titanium dioxide is extensively used as a white pigment in paints and coatings application. Also, it has a wide range of applications, ranging from paints and sunscreens to food coloring FOR TiO2 Uses for white pigment Four million tons of pigmentary TiO2 are consumed annually. Apart from producing a white color in liquids, paste or as coating on solids, TiO2 is also an effective pacifier, making substances more opaque. Here are some examples of the extensive range of applications: ? Paints ? Plastics ? Papers ? Inks ? Medicines ? Most toothpastes ? Skimmed milk; adding TiO2 to skimmed milk makes it appear brighter, more opaque and more palatable Recovery of TiO2 Generally, there have been two main methods developed by which the titanium can be recovered from red mud: pyro metallurgical recovery and hydro-metallurgical recovery. The pyro- metallurgical method generally comprises the separation of pig iron. The red mud is claimed at a range of temperatures, from 800 to 1350°C, and is smelted through a reducing agent using an electric-furnace to obtain melted iron as well as slag that includes titanium dioxide, silica and alumina. The metallic iron is removed from the slag and the slag is digested to recover the titanium and aluminium from the solution. The pyro-metallurgical process is not an energy-friendly method and, hence, the hydrometallurgical technique usually attracts more attention from the research community. A number of the acids’ extractability have been analyzed to recover titanium from red mud, such as dilute and concentrated H2SO4 and hydrochloric acid. The solvent extraction technique has been applied to extract titanium from red mud using HCl, which comprised di- and mono-. Red mud can also be considered a secondary source of the most important modification of titanium compound, titanium dioxide. Market Outlook The Global Ferric Oxide Market is expected to register a CAGR of 4.99% to reach a value of USD 2,414,382.9 Million by 2030. The primary driver of the global ferric oxide market is its growing adoption in steel production. The increasing application of steel in the major end-use industries such as transportation, construction, and energy, packaging, and consumer appliances is also a prime factor driving market growth. Steel finds application in the manufacturing of automobile structures, panels, doors, engine blocks, gears, suspension, wheels, fuel tanks, steering, and braking systems. The use of iron oxide pigments to impart colors to construction materials, paints, inks, plastics, papers, cosmetics, rubbers, concrete blocks, and tiles is another key driver of the market. Global Ferric oxide Market Revenue, by Application, 2030 (USD Million) The growing construction industry output is expected to be one of the most significant drivers for the iron oxide market on a global scale. The growing adoption of iron oxide nanoparticles in wastewater treatment is an excellent opportunity for the players in the market. With the steady growth of the construction industry, stemming from increasing urban and civil infrastructure projects, the demand for iron oxides is expected to increase significantly. The ferric oxide market is witnessing consolidation, driven by the pursuit for sustainability among market participants, owing to the imposition of stringent regulations on the production of ferric oxide, which are increasing the overhead costs for ferric oxide manufacturers. This has prompted ferric oxide manufacturers to consolidate production and business operations through acquisition of external enterprises having a sufficient infrastructure and resources. Mining and metallurgy industry dominated the market in 2018, and it is likely to grow during the forecast period with the continuous growth in mining activities. The increasing demand for titanium dioxide downstream products and natural dyes in the textile industry are likely to provide opportunities for the studied market during the forecast period. Asia-Pacific dominated the market across the world, due to the growing mining activities in the region, and robust demand fueling the growth of polymer synthesis and chemicals industry. The global titanium dioxide market size was valued at USD 15.76 billion in 2018 and is expected to witness a CAGR of 8.7% from 2019 to 2025. The major factors driving the growth of the market studied are the increasing demand from the mining industry and increasing use in polymer synthesis. On the flipside, the toxicity of titanium dioxide hampers the growth of the market. Escalating demand for lightweight vehicles owing to strict emission policies is expected to fuel the market growth over the coming years. Thus, rising usage of lightweight materials for enhanced safety and fuel-efficiency is expected to have a positive impact on the industry over the forecast period. These lightweight materials, when coated with titanium dioxide, increase durability, stability, persistence, and scratch resistance. The product has an increasing application scope in printing inks, rubber, and chemical fibers. In printing inks, it is used in flexographic, lamination, screen printing, UV-cured, and metal decorative inks. The Top Players Including: ? Cathay Industries ? Huntsman ? Lanxess ? Bayferrox ? Toda Kogyo ? Quality Magnetite ? Prochem ? BariteWorld • Bengal Chemicals & Pharmaceuticals Ltd. • Bharat Chemicals & Fertilizers Ltd. • Kerala Minerals & Metals Ltd. • Kolmak Chemicals Ltd. • Tata Pigments Ltd. • Travancore Titanium Products Ltd. • V V Titanium Pigments Pvt. Ltd. • Kerala Minerals & Metals Ltd. Tags Recovery_of_Fe2O3_from_Bauxite_Processing, #Iron_Oxide_Recovery, #Recovery_of_Ferric_Oxide, #Recovery_of_Ferric_oxide_from_Bauxite_Processing_Waste, Ferric Oxide, Manufacturing Applications for Iron (III) Oxide, Manufacture of ferric oxide, Production of Iron (II) Oxide (Fe2O3), Process for the Manufacture of Iron Oxide, Process for Producing Iron Oxide, Iron Oxide Formula, Ferric Oxide Production, How to Make Iron Oxide, Preparation of iron oxide, Titanium Dioxide (TiO2) Production and Manufacturing, #Titanium_Dioxide, Manufacture of Titanium Dioxide, #Titanium_Dioxide_(TiO2) Production, Manufacturing Process of Titanium Dioxide, Titanium Dioxide Properties, Titanium Dioxide Uses, Titanium Dioxide Process Flow Diagram, Titanium Dioxide Manufacture, How to Make Titanium Dioxide, Manufacturing Process of Titanium Dioxide, Production of Titanium Dioxide, Titanium Dioxide Production, #Recovery_of_Titanium_Dioxide, Process for Recovery of Titanium Dioxide, Recovering Titanium Dioxide (Tio2), Recovery of Titanium Dioxide from Bauxite Processing Waste, #Project_Report_on_Recovery_of_Ferric_oxide_from_Bauxite_Processing_Waste, Detailed Project Report on Recovery of Ferric oxide from Bauxite Processing Waste, Project Report on Recovery of Titanium Dioxide, Pre-Investment Feasibility Study on Recovery of Ferric oxide from Bauxite Processing Waste, Techno-Economic feasibility study on Recovery of Titanium Dioxide, #Feasibility_report_on_Recovery_of_Ferric_oxide_from_Bauxite_Processing_Waste, #Free_Project_Profile_on_Recovery_of_Ferric_oxide_from_Bauxite_Processing_Waste, Project profile on Recovery of Ferric oxide from Bauxite Processing Waste, Download free project profile on Recovery of Titanium Dioxide

Plant capacity Plant & machinery Working capital T.C.I Return Break even
- - - - 1% 0%

Introduction

We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the cost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics.

Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary & Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** Total ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
  ********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
PARTICULARS EXISTING PROPOSED TOTAL
COST OF PROJECT      
Land & Site Development Exp.      
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
  ********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
  ********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
  ********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
  ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
  ********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PARTICULARS STK.PRD. STK.PRD.   OPERATING YEARS
  1st Year 2nd Yr &+   1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS       ********** ********** ********** ********** **********
Stocks on Hand       ********** ********** ********** ********** **********
Raw Material Cost       ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
  ********** **********   ********** ********** ********** ********** **********
Total       ********** ********** ********** ********** **********
Cash/Bank Balances       ********** ********** ********** ********** **********
Gross Wkg. Capital       ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
    1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales            
Gross Profit   ********** ********** ********** ********** **********
% Of G.P. to Net Sales   ********** ********** ********** ********** **********
Net Profit Before Taxes   ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales   ********** ********** ********** ********** **********
Net Profit After Taxes   ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales   ********** ********** ********** ********** **********
             
Debt Service Coverage Ratio   ********** ********** ********** ********** **********
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations            
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative)   ********** ********** ********** ********** **********
D. S. C. R. (Overall)   ********** ********** ********** ********** **********
             
Parameters            
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital exclUnsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering            
I.E.Total Term Lia./NW            
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** ********** **********
Total Outside Lia./NW   ********** ********** ********** ********** **********
Assets Turnover Ratio (x)   ********** ********** ********** ********** **********
             
No. of Shares of 10.00 each   ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in)   ********** ********** ********** ********** **********
Proposed divident   ********** ********** ********** ********** **********
Cash EPS (in)   ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in)   ********** ********** ********** ********** **********
Payout Ratio (%Age)   ********** ********** ********** ********** **********
Retained Earnings/Share (in)   ********** ********** ********** ********** **********
Retained Earnings (%Age)   ********** ********** ********** ********** **********
Book Value Per Share (in)   ********** ********** ********** ********** **********
Debt Per Share (in)   ********** ********** ********** ********** **********
Probable Mkt. Price/Share(in)   ********** ********** ********** ********** **********
Price / Book Value (x)   ********** ********** ********** ********** **********
Price Earnings Ratio (x)   ********** ********** ********** ********** **********
Yield (%Age)   ********** ********** ********** ********** **********
PARTICULARS   OPERATING YEARS
  Ratio 1-2 2-3 3-4 4-5 5-6
             
BREAK EVEN ANALYSIS            
Total Value of Output   ********** ********** ********** ********** **********
             
Variable Cost & Expenses            
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total   ********** ********** ********** ********** **********
Less: W.I.P. Adjustments   ********** ********** ********** ********** **********
Total Variable Cost   ********** ********** ********** ********** **********
Net Contribution   ********** ********** ********** ********** **********
Profit Volume Ratio (%)   ********** ********** ********** ********** **********
             
Semi-Var./Semi-Fixed Exp. ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** ********** **********
             
Fixed Expenses / Cost ********** ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** ********** **********
             
Cash Break Even Sales ********** ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** ********** **********
             
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)            
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
MEANS OF FINANCE      
Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
  ********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
  ********** ********** **********
Total Means of Finance ********** ********** **********
PARTICULARS OPERATING YEARS
  1-2 2-3 3-4 4-5 5-6
           
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
ASSETS ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
  ********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK  
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.  
F Rate of Interest(General) xxxx% p.a.
G Rate of Interest(Initial) 0.00% p.a.
H Apply Gen. Int. Rate from Year x Quarter :: x  
I Interest Calculation Quarterly  
Debt Service Coverage Ratio            
Funds Available to Service Debts            
Net Profit After Taxes   ********** ********** ********** ********** **********
Depreciation Charges   ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
Debt Service Obligations   ********** ********** ********** ********** **********
Repayment of Long/Medium Term   ********** ********** ********** ********** **********
Interest on Long/Medium Term   ********** ********** ********** ********** **********
Total   ********** ********** ********** ********** **********
    ********** ********** ********** ********** **********
D. S. C. R. (Individual)   ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) .....   ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........   ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building Office Buildings Plant & Machinery Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures  
1-2 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
  ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
       
Type A :: Buildings      
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
       
Type C      
Office Vehicles WDV ********** **********
       
Type D :: Misc. Fixed Assets      
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
       
Type B :: Plant & Machineries      
Projected Pay Back Period
Particulars Operating Years
  1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********        
Total Initial Investment *********        
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months    
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV *********   *********
IRR *********   *********
       

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Introduction

  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications

Market Study and Assessment

  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity

Raw Material

  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers

Personnel (Manpower) Requirements

  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery

  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances &Equipments
  • Laboratory Equipments& Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations

  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram

Infrastructure and Utilities

  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
  • Assumptions for Profitability workings
  • Plant Economics
  • Production Schedule
  • Land & Building
    Factory Land & Building
    Site Development Expenses
  • Plant & Machinery
    Indigenous Machineries
    Other Machineries (Miscellaneous, Laboratory etc.)
  • Other Fixed Assets
    Furniture & Fixtures
    Pre-operative and Preliminary Expenses
    Technical Knowhow
    Provision of Contingencies
  • Working Capital Requirement Per Month
    Raw Material
    Packing Material
    Lab & ETP Chemical Cost
    Consumable Store
  • Overheads Required Per Month And Per Annum
    Utilities & Overheads (Power, Water and Fuel Expenses etc.)
    Royalty and Other Charges
    Selling and Distribution Expenses
  • Salary and Wages
  • Turnover Per Annum
  • Share Capital
    Equity Capital
    Preference Share Capital
  • Annexure 1:: Cost of Project and Means of Finance
  • Annexure 2:: Profitability and Net Cash Accruals
    Revenue/Income/Realisation
    Expenses/Cost of Products/Services/Items
    Gross Profit
    Financial Charges
    Total Cost of Sales
    Net Profit After Taxes
    Net Cash Accruals
  • Annexure 3 :: Assessment of Working Capital requirements
    Current Assets
    Gross Working. Capital
    Current Liabilities
    Net Working Capital
    Working Note for Calculation of Work-in-process
  • Annexure 4 :: Sources and Disposition of Funds
  • Annexure 5 :: Projected Balance Sheets
    ROI (Average of Fixed Assets)
    RONW (Average of Share Capital)
    ROI (Average of Total Assets)
  • Annexure 6 :: Profitability ratios
    D.S.C.R
    Earnings Per Share (EPS)
  • Debt Equity Ratio
  • Annexure 7 :: Break-Even Analysis
    Variable Cost & Expenses
    Semi-Var./Semi-Fixed Exp.
    Profit Volume Ratio (PVR)
    Fixed Expenses / Cost
    B.E.P
  • Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
    Resultant N.P.B.T
    Resultant D.S.C.R
    Resultant PV Ratio
    Resultant DER
    Resultant ROI
    Resultant BEP
  • Annexure 12 :: Shareholding Pattern and Stake Status
    Equity Capital
    Preference Share Capital
  • Annexure 13 :: Quantitative Details-Output/Sales/Stocks
    Determined Capacity P.A of Products/Services
    Achievable Efficiency/Yield % of Products/Services/Items
    Net Usable Load/Capacity of Products/Services/Items
    Expected Sales/ Revenue/ Income of Products/ Services/ Items
  • Annexure 14 :: Product wise domestic Sales Realisation
  • Annexure 15 :: Total Raw Material Cost
  • Annexure 16 :: Raw Material Cost per unit
  • Annexure 17 :: Total Lab & ETP Chemical Cost
  • Annexure 18 :: Consumables, Store etc.,
  • Annexure 19 :: Packing Material Cost
  • Annexure 20 :: Packing Material Cost Per Unit
  • Annexure 21 :: Employees Expenses
  • Annexure 22 :: Fuel Expenses
  • Annexure 23 :: Power/Electricity Expenses
  • Annexure 24 :: Royalty & Other Charges
  • Annexure 25 :: Repairs & Maintenance Exp.
  • Annexure 26 :: Other Mfg. Expenses
  • Annexure 27 :: Administration Expenses
  • Annexure 28 :: Selling Expenses
  • Annexure 29 :: Depreciation Charges – as per Books (Total)
  • Annexure 30 :: Depreciation Charges – as per Books (P & M)
  • Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
  • Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
  • Annexure 33 :: Interest and Repayment - Term Loans
  • Annexure 34 :: Tax on Profits
  • Annexure 35 ::Projected Pay-Back Period And IRR
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

Need assistance?

Share your details, we will call you

Let's Connect

Fill in the form below, &
we'll get back to you within 24 hours.

CAPTCHA Image