Project Reports : Business Plan
Our Market Survey cum Detailed Techno Economic Feasibility Report provides an insight of market in India. The report assesses the market sizing and growth of the Industry. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line. And before diversifying/venturing into any product, they wish to study the following aspects of the identified product:
- Good Present/Future Demand
- Export-Import Market Potential
- Raw Material & Manpower Availability
- Project Costs and Payback Period
The detailed project report covers all aspect of business, from analyzing the market, confirming availability of various necessities such as Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, uses and applications, Plant Layout, Project Financials, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis. The DPR (Detailed Project Report) is formulated by highly accomplished and experienced consultants and the market research and analysis are supported by a panel of experts and digitalized data bank.
We at NPCS, through our reliable expertise in the project consultancy and market research field, have demystified the situation by putting forward the emerging business opportunity in India along with its business prospects.
Market Survey cum Detailed Techno Economic Feasibility Report
● Project Introduction
● Project Objective and Strategy
● History of the Product
● Product Properties and Specifications
● Uses and Applications
Market Study and Assessment
● Current Indian Market Scenario
● Market Demand and Supply
● Future Market Demand and Forecast
● Import and Export Statistics
● Market Opportunity
Raw Material Requirements
● List of Raw Materials
● Properties of Raw Materials
● Quality Standards
● Suppliers and Manufacturers
Raw Material Requirements
● List of Raw Materials
● Properties of Raw Materials
● Quality Standards
● Suppliers and Manufacturers
Personnel Requirements
● Staff and Labor Requirements
● Managerial and Technical Staff
● Office and Marketing Personnel
Plant and Machinery
● List of Plant and Machinery
● Miscellaneous Items and Equipment
● Laboratory Equipment and Accessories
● Electrification and Utilities
● Maintenance Costs
● Suppliers and Manufacturers
Manufacturing Process and Formulations
● Manufacturing Process
● Packaging Requirements
● Process Flow Diagrams
Infrastructure and Utilities
● Project Location
● Land Area Requirements
● Land Rates
● Built-Up Area
● Construction Schedule
● Plant Layout
Project at a Glance
● Assumptions for Profitability Workings
● Plant Economics
● Production Schedule
● Capital Requirements
● Overheads and Operating Expenses
● Revenue and Profit Projections
● Break-Even Analysis
Annexures
● Annexure 1: Cost of Project and Means of Finance
● Annexure 2: Profitability and Net Cash Accruals
● Annexure 3: Working Capital Requirements
● Annexure 4: Sources and Disposition of Funds
● Annexure 5: Projected Balance Sheets
● Annexure 6: Profitability Ratios
● Annexure 7: Break-Even Analysis
● Annexures 8 to 11: Sensitivity Analysis
● Annexure 12: Shareholding Pattern and Stake Status
● Annexure 13: Quantitative Details - Output/Sales/Stocks
● Annexure 14: Product-Wise Domestic Sales Realization
● Annexure 15: Total Raw Material Cost
● Annexure 16: Raw Material Cost Per Unit
● Annexure 17: Total Lab & ETP Chemical Cost
● Annexure 18: Consumables, Store, etc.
● Annexure 19: Packing Material Cost
● Annexure 20: Packing Material Cost Per Unit
● Annexure 21: Employees Expenses
● Annexure 22: Fuel Expenses
● Annexure 23: Power/Electricity Expenses
● Annexure 24: Royalty & Other Charges
● Annexure 25: Repairs & Maintenance Expenses
● Annexure 26: Other Manufacturing Expenses
● Annexure 27: Administration Expenses
● Annexure 28: Selling Expenses
● Annexure 29: Depreciation Charges – as per Books (Total)
● Annexure 30: Depreciation Charges – as per Books (P&M)
● Annexure 31: Depreciation Charges - As per IT Act WDV (Total)
● Annexure 32: Depreciation Charges - As per IT Act WDV (P&M)
● Annexure 33: Interest and Repayment - Term Loans
● Annexure 34: Tax on Profits
● Annexure 35: Projected Pay-Back Period and IRR
Our Project Category
Please choose a category below for projects of your interest.
X
Have a business idea? Let’s make it
happen together-contact us now!